Link Copiedcheck_circle
Auto News

KL-Bangkok Line Possible - MyHSR Corp Head

Anis

Share via

klhsr-project-thailand.jpeg
Photo: Coconuts There is a chance that the bullet train will be extended to Malaysia's northern region, with a final stop at Padang Besar in Perlis, according to MyHSR Corporation Sdn Bhd chairman Datuk Seri Fauzi Abdul Rahman. However, the development of the KL-Singapore HSR is given priority right now, NST reported.

Datuk Seri Fauzi said that Thailand plans to build a high-speed rail network that will link Padang Besar and Bangkok. Construction is underway on the northeast and the three airport lines. Following completion of those projects, work on the southern line will commence.

"We would simply synchronise with that if we were to construct a line connecting Kuala Lumpur and Padang Besar," he added.

He does, however, stress that before the KL-Bangkok line can move forward, the government must make sure that the southern line which connects Kuala Lumpur with Singapore is fully utilized. Untitled-design---2024-01-08T144903.881.png

This will guarantee that the construction is finished to a high standard and that the ridership figures correspond with the estimates made in the private sector's proposal.

"Our goal is for the southern corridor to grow into a major economic hub, given the positive correlation and interdependence between investments in large infrastructure projects such as the HSR and economic multipliers. Early planning and integration of the economic corridor alongside the HSR delivery is critical to amplifying the benefits and growth potential of the project.

"We simply cannot rest on our laurels and must not be left behind, as our regional peers such as Thailand and Indonesia, which are prioritising mega transport infrastructure projects, are closing the gap to Malaysia," he stated.

Transport Minister Anthony Loke Siew stated in November last year that the proposed revived high-speed rail (HSR) project will initially focus on the Kuala Lumpur-Singapore route.
“As for the Kuala Lumpur to Bangkok (route), it might be done in the second phase, which would incur a much higher capital expenditure than the one required for (the route heading to) Singapore,” he added.

Untitled-design---2024-01-08T144824.844.png

He was responding to former Prime Minister Muhyiddin Yassin (PN-Pagoh), who asked about the government's future plans for the KL-Singapore HSR project, stating that it would be viable to extend the project to Bangkok and that Thailand was developing its own HSR that could reach Peninsular Malaysia.


Tagged:

KL-Singapore rail
bullet train
Kuala Lumpur-Singapore high-speed rail (HSR)
HSR
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

Govt Still Weighing Options For KL–Singapore HSR Project - Loke

Malaysia is still reviewing options for the KL–Singapore HSR, with a final model yet to be determined.

08-10-2025
Auto News

Govt Finalising Key Parameters For KL-SG HSR Project - MOT

MOT announced that the government is in the process of finalizing key parameters for the KL-SG HSR project.

18-02-2025
Auto News

Govt Open To Reviving KL-SG HSR With Private Sector Involvement - PM Anwar

The government has decided that the KL-SG HSR project can be resurrected with full private sector participation.

08-01-2025
Auto News

KL-SG HSR Project: MRCB Withdraws from MyHSR Corp

Berjaya led MyHSR consortium now better aligned with project target following MRCB’s exit.

Auto News

KL-SG HSR Project Will Cost 30% Less Than Projected RM110 Billion

The KL-SG HSR project will cost roughly RM70 billion, roughly 30% lesser than the initial projected RM110 Billion.

Auto News

HSR Project Receives 7 Concept Proposal, Govt Needs Two Months To Review

The Transport Ministry announced on parliament’s website that the HSR Project has received 7 Concept Proposals.

Auto News

Why Japanese Companies Not Interested On Malaysia's Bullet Train Project

Japanese companies are not keen on Malaysia’s HSR project due to worries about the Malaysian government's lack of funding.

26-01-2024
Auto News

KL-Singapore High Speed Rail Project Is Back On

yHSR Corp, has called for concept proposals for the long-shelved HSR project.

13-07-2023

Latest News

Auto News

MAA: Nov 2025 Vehicle Sales Dip 4.6% from Oct, BEV Rush Keeps Market Strong

MAA reported solid vehicle sales in Nov 2025, with 72,509 units sold, slightly lower than Oct’s 75,992 units.

19-12-2025
Auto News

Perodua QV-E Sales Outlets Now Expanded to 34 Locations

Perodua has expanded the number of sales outlets for its QV-E EV to 34 locations from the original 9 outlets.

19-12-2025
Auto News

E-Hailing Drivers Must Hit 2,000KM To Unlock BUDI95 Extra Quota

E-hailing drivers must now clock at least 2,000km a month to qualify for higher BUDI95 petrol quotas.

19-12-2025
Auto News

Honda Malaysia’s 25th Anniversary Campaign – November Winners Announced

Honda Malaysia has announced the November winners of its 25th anniversary “Because of You” campaign.

19-12-2025
Auto News

Cable Theft Paralyzes Rail Services, Prasarana Urges Action From Govt

Prasarana urges urgent nationwide measures to tackle rampant cable theft as RM20.6 million of lost has been reported.

19-12-2025
Auto News

Govt Announces 50% Christmas Toll Discount On Dec 23-24

Private car users will enjoy a 50% toll discount nationwide on Dec 23, 24 as the government rolls out festive travel relief for Christmas.

19-12-2025
Auto News

No Toll Hikes in 2026 As Govt Commits To Absorb Costs

No toll hikes in 2026 as the government steps in and commits to absorb costs for which.

Auto News

O&J Highlights J7 PHEV Capabilities Through Customer Drive

O&J's nationwide drive brings customers together showcasing the J7 PHEV's efficiency in everyday conditions.