Link Copiedcheck_circle
Auto News

Loke: RTS Link 83% Complete & On Schedule For 2027 Operation

Kumeran Sagathevan

Share via

RTS-Link-Alignment-Map-August-2023-EN-1536x891.png


The Rapid Transit System (RTS) Link connecting Johor Bahru, Malaysia, and Singapore is at 83% completion stage and is on schedule to begin operations on Jan 1, 2027, says Minister of Transport, YB Anthony Loke.

Loke also confirmed that system installation by RTS Operations Systems Sdn Bhd (RTSO) is expected to commence by the end of this year.

According to him further, "The completion of the rail infrastructure will pave the way for RTSO to start installing critical system components, including trackwork, rolling stock, signalling systems, and power supply and distribution."


RTS-(3).jpeg


The announcement was made during a signing ceremony for the parking space sale and purchase agreement between Malaysia Rapid Transit System Sdn Bhd (MRTS) and Coronade Properties Sdn Bhd.

Furthermore, Loke also stated that the Customs, Immigration and Quarantine (CIQ) complex building at Bukit Chagar is at the superstructure building stage after which agencies should be able to start installing systems and equipment at the CIQ complex from Aug 2025.

On the matter of mitigating traffic congestion, Loke announced that the Ministry of Transport (MPT) is developing a traffic distribution plan for the Iskandar Malaysia region in collaboration with local authorities.


Screenshot-2024-08-22-082754.jpg


All the initiative aims to complement the ongoing infrastructure development in Johor Bahru and improve the overall traffic situation in the city and surrounding areas.

Loke also added that the access to the CIQ complex for vehicles would be through Jalan Tun Abdul Razak, Jalan Tebrau, Jalan Jim Quee, and Jalan Tunku Azizah therefore to address traffic issues, the government is prioritising an investment of over RM200 million in public transport infrastructure around Bukit Chagar.


Komuter-RTS-Link-(3).jpg


It is expected that the investment on public transportation at the area is to cover current and future needs taking into account the potential growing number of daily RTS Link passengers.

Additionally, public support facilities, particularly parking spaces, are also being looked at with the construction of a new multi-storey Park 'N Ride facility at Bukit Chagar, offering 1,500 parking lots for RTS Link users on top of 781 extra parking spaces provided at Coronation Square.



Source: BERNAMA 

Tagged:

RTS LIink
Johor Bahru-Singapore Rapid Transit System (RTS)
Minister of Transport YB Anthony Loke
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.

Auto News
RTS Link Fare Study Underway to Ensure Affordable Cross-Border Travel

RTS Link Fare Study Underway to Ensure Affordable Cross-Border Travel

RTS Link operators are finalising fare strategies to encourage more commuters to switch from private vehicles to public transport.

Auto News
Johor On Track To Become Major Rail Hub In Malaysia

Johor On Track To Become Major Rail Hub In Malaysia

Johor is set to become a major rail hub in Malaysia underpinned by ongoing rail developments.

24-03-2025
Auto News
QR Codes Coming for Drivers at Johor Checkpoints

QR Codes Coming for Drivers at Johor Checkpoints

Malaysia plans to expand QR code immigration clearance to car drivers, aiming to ease congestion at border checkpoints.

Auto News
JB-SG RTS Link Fares Will Consider Currency Exchange

JB-SG RTS Link Fares Will Consider Currency Exchange

RTS Link ticket fares will be finalized by January 2027, considering factors like Malaysia-Singapore exchange rates.

27-02-2025
Auto News
Govt Calls For Bids For Elevated ART In JB

Govt Calls For Bids For Elevated ART In JB

Public-Private Partnership Unit (UKAS) will soon be initiating the process of soliciting proposals for ART in JB.

14-02-2025
Auto News
RTS Link 95% Complete, Service Operation Dec 2026

RTS Link 95% Complete, Service Operation Dec 2026

The Johor Bahru-Singapore RTS is 95% complete as of last November.

Auto News
Faizal: Johor ART Necessary To Minimise RTS Station Congestion

Faizal: Johor ART Necessary To Minimise RTS Station Congestion

The ART system in Johor Bahru can be an immediate solution to manage RTS Link congestion before completion of the LRT line.

Latest News

Auto News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized

JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized

JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.

Auto News
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score

Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score

The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?

02-08-2025
Auto News
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.

01-08-2025
Auto News
Govt Looking To Revive MEX II Highway With New Completion Plan

Govt Looking To Revive MEX II Highway With New Completion Plan

The government is working with bondholders to restart the long-delayed MEX II Highway.

01-08-2025
Auto News
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.

01-08-2025
Auto News
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.

01-08-2025
Auto News
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.

Auto News
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.