Johor State Govt Mulls ART System Alongside RTS Link
-full_normal.jpg)
The Johor state government is keen to implement an Autonomous Rapid Transit (ART) system in Johor Bahru. According to the state executive councillor (EXCO) Lee Ting Han, this new ART system will run alongside the new Rapid Transit System Link (RTS Link) to help reduce traffic congestion in the state capital.
However, Lee stated that the idea for an elevated ART system, which is set to go live in Sarawak, will first need to be evaluated by the Johor executive council during its weekly meeting before being tabled to the federal government.
-full_normal.jpg)
The urgency for improved transportation solutions in Johor is increasing, particularly when the RTS Link that connects Johor with Singapore begins operation.
With its construction going on at a rapid pace, the upcoming RTS link is expected to handle 10,000 passengers per hour in each direction hence potentially causing severe congestion in the city centre. The elevated ART system would help manage and distribute the influx of daily commuters effectively to better manage these congestion.
Lee also detailed that the proposed ART routes would align with the existing Iskandar Malaysia Bus Rapid Transit (IMBRT) project corridors. On its own, the IMBRT system, which includes dedicated busways that connect key locations around the JB area, could face competition from other road users, possibly affecting its success.
-full_normal.jpg)
-full_normal.jpg)
By proposing an elevated ART along these alignments, the state aims to partially utilise the lands that have already been acquired, facilitating a quicker commencement of construction once federal approval is secured.
Earlier this year, Transport Minister Anthony Loke indicated that the ministry would review Johor Bahru's need for an integrated public transport system to tackle its central congestion issues.
Source: MalayMail
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQD7634
SELANGOR
BSK8736
JOHOR
JYM8796
PULAU PINANG
PRW5975
PERAK
APD4008
PAHANG
CFE4672
KEDAH
KGD4480
NEGERI SEMBILAN
NEH9144
KOTA KINABALU
SJP3020
KUCHING
QAB7465M
Last updated 16 Dec, 2025
Fuel Price
Petrol
RON 95
RM 2.64
-0.02
RON 97
RM 3.27
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.06
-0.02
EURO 5 B7
RM 3.26
-0.02
Last updated 11 Dec, 2025
Related News
Johor Questions Delay as Penang LRT Gets Federal Nod
Johor is urging Putrajaya to expedite approval for its long-awaited rail system to avoid RTS congestion.
21-11-2025
Kuching Urban Transportation System Anticipated To Commence In 2028
Full operation of the Kuching Urban Transport System (KUTS) project is expected to commence in 2028.
21-05-2025
ART Trackless Trams Trial Run In Putrajaya Till 31 July - Free Rides Offered
PPj and MOT begin ART Trackless Tram trail run till July 31, and free rides are offered to gauge public reception.
23-05-2024
Faizal: Johor ART Necessary To Minimise RTS Station Congestion
The ART system in Johor Bahru can be an immediate solution to manage RTS Link congestion before completion of the LRT line.
13-05-2024
Sarawak Set To Become Asia's First Hydrogen-Powered Economy!
Sarawak to begin large-scale commercial production of green hydrogen by 2027 to promote renewable energy and minimise the region's carbon footprint.
13-06-2023
Sarawak State Govt. To Endorse Hydrogen-Powered ART Vehicles Including Buses
Sarawak state government has announced its plans to promote hydrogen-powered public vehicles among locals.
23-03-2023
Johor Questions Delay as Penang LRT Gets Federal Nod
Johor is urging Putrajaya to expedite approval for its long-awaited rail system to avoid RTS congestion.
21-11-2025
Faizal: Johor ART Necessary To Minimise RTS Station Congestion
The ART system in Johor Bahru can be an immediate solution to manage RTS Link congestion before completion of the LRT line.
13-05-2024
Latest News
No More Heavy Vehicles On Kuala Terengganu Drawbridge From Jan 1
Heavy vehicles will no longer be allowed to use the Kuala Terengganu drawbridge from Jan 1.
16-12-2025
OMODA & JAECOO Wrap Up 2025 With Season of Rewards
OMODA & JAECOO 2025 Season of Rewards offers extended service packages and practical ownership benefits.
16-12-2025
Overloaded Trucks Crackdown Showing Results, Transport Rates Remain Stable
Strict enforcement against overloaded trucks is paying off, improving road safety and transport efficiency without hiking rates.
16-12-2025
Gemas-JB ETS Needs Better Access To Curb City Traffic - Expert
Experts urge improved first-mile access, feeder buses, and park-and-ride options for the Gemas- JB ETS.
16-12-2025
SCS Adopts Advanced European Testing Systems
SCS raises the bar for vehicle inspections with advanced European testing technology.
16-12-2025
Shah Alam LRT Launch Delayed To Avoid Another 2021 Kelana Jaya Crash
Prasarana delays the Shah Alam LRT opening, prioritising passenger safety and thorough testing after past LRT mishaps.
15-12-2025
Federal Highway Won’t Be Upgraded, Costs Deemed Too High
Despite worsening traffic conditions, the Federal Highway will not be upgraded, with the government citing high costs.
15-12-2025
Bollards Are There for Your Safety, Not Decoration - DBKL
DBKL is reminding the public that bollards play a crucial role in keeping pedestrians safe.
15-12-2025
Show More
trending_flat