Link Copiedcheck_circle
Auto News

Is Sarawak’s Hydrogen-Powered ART Project a Risky Gamble?

Kumeran Sagathevan

Share via

kch-080323-mt-metrochina-p3.jpg


As Sarawak prepares to welcome the first two hydrogen-powered Autonomous Rapid Transit (ART) vehicles for the Kuching Urban Transportation System (KUTS), alarming news has surfaced from China. The world’s first hydrogen tram demonstration line, located in Foshan, has been suspended as of Aug 6, citing low ridership over nearly five years of operation.

The future feasibility of Sarawak's RM6 billion investment in hydrogen-powered public transport is seriously called into question by this development. Particularly concerning is pending assemblywoman Violet Yong, who has been a fervent opponent of the ART project. Given the disturbing information from Foshan, she is right to question the state's determination to develop this technology.


thumb-(7).jpg


The hydrogen tram line, once hailed as a pioneering achievement, was showcased to Sarawak’s leadership by CRRC Corporation Limited (CRRC) as proof of concept. Now, with its suspension, Yong calls on Sarawak’s leaders to reassess their plans and question the confidence placed in hydrogen technology.


ART-system.jpg


Her worries are not without merit. There have been major obstacles for hydrogen-powered public transport systems all around the world. Many nations have questioned whether hydrogen is a viable and cost-effective sustainable fuel, and some have decided to stop their attempts. Why should Sarawak have faith in the success of hydrogen-fueled transportation if developed countries have found it difficult to achieve?

Yong has also highlighted a deeper issue: the practical challenges of producing enough hydrogen to fuel the ART and buses in the state. Given these hurdles, she urges the Sarawak government to refocus on essential infrastructure, such as roads, bridges, and schools—developments that will undoubtedly yield more tangible benefits for the people.


kch-111023-mtu-s_metro-p1.jpg


In a time of limited resources, pursuing projects that may fail could have severe consequences for the state. While innovation and progress are important, it is equally essential that public investments are made wisely, ensuring they truly serve the interests of the people and not political ambitions. The suspension of Foshan’s hydrogen tram serves as a cautionary tale. Sarawak cannot afford to ignore it.




Source: MalayMail

Tagged:

CRRC Corporation Limited (CRRC)
Hydrogen Fuel Technology
hydrogen-powered Autonomous Rapid Transit (ART) smart tram
ART Sarawak
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

International

GM, Hyundai Partners Up To Accelerate Innovation and Cost Efficiency

GM partners Hyundai to explore vehicle production and clean energy technologies.

Auto News

Sarawak H2 Hub Launched, Integrating Modular Hydrogen Production Units Planned

SEDC Energy & Gentari to jointly develop a global-scale hydrogen production facility.

Tech

JCB’s New ICE With Hydrogen Fuelled Technology

The British-based heavy machinery manufacturer, JCB, has recently revealed its Internal Combustion Engine (ICE) that utilises hydrogen fuel technology.

21-11-2022
Auto News

Govt Calls For Bids For Elevated ART In JB

Public-Private Partnership Unit (UKAS) will soon be initiating the process of soliciting proposals for ART in JB.

14-02-2025
Auto News

ART Smart Tram Prototype Will Begin Test Run In Kuching Next Month

The test run for the world's first prototype Autonomous Rapid Transit (ART) smart tram will begin at the Isthmus here on September 4.

22-08-2023

Latest News

Auto News

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.