Link Copiedcheck_circle
Auto News

Four Temporary R&R Stops will be Built on LTU Highway

Mukhlis Azman

Share via

LTU-Highway-Pahang-4.jpg

The Pahang state government is planning to build four temporary R&R stops along the Central Spine Road (LTU).

The Pahang state government is planning to build four temporary R&R stops along the Central Spine Road, or the Lingkaran Tengah Utama (LTU). As reported by NST, these temporary stops will help to cater to drivers using the LTU highway to return to their hometowns this upcoming Hari Raya Aidilfitri.

Pahang Chief Minister YAB Datuk Seri Wan Rosdy Wan Ismail said the four temporary R&R stops will be built next week between Bentong and Kampung Relong, Lipis, in anticipation of increased traffic volume on the LTU during the festive season. Construction of these stops is scheduled to be completed next week, where it will be in operation five days before Aidilfitri.

LTU-Highway-Pahang-1.jpgLTU-Highway-Pahang-3.jpg

Two of them will be located in Bentong in both directions, while one will be in Raub and the last one will be near Kechau Tui in Lipis district. Pahang MB also said these four temporary stops will cost the state government about RM2.5 million to build, where they will be equipped with mobile toilets, washrooms, garbage bins, and dedicated parking areas.

Pahang-MB-YAB-Datuk-Seri-Wan-Rosdy-Wan-Ismail.jpg

Pahang Chief Minister YAB Datuk Seri Wan Rosdy Wan Ismail

“We have requested immediate assistance from the federal government with the construction of the four rest areas. If there are delays, the Pahang government will start work using our funds before claiming the allocation from the federal government,” he added.

Wan Rosdy also said that although temporary, the four R&R stops will help enhance the comfort and safety of road users.

“Something is better than nothing, so we will soon have temporary rest stops along the LTU, and road users can utilise them until the construction of the permanent stops is completed by the works ministry,” he said.

“I hope the previous episodes involving reports of littering along the expressway will not happen this year and road users will adhere to the rules. I hope the new facilities along the LTU will ensure a smoother journey for those using the stretch during the Aidilfitri festive season,” the Pahang MB added.

Source: New Straits Times


Gallery

Tagged:

R&R
LTU
Lingkaran Tengah Utama (LTU) Highway
Central Spine Road
Pahang State Government
Share This Article

Written By

Mukhlis Azman

An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman

Share via

Related News

Auto News
Temporary Closure Of PLUS Rest Areas

Temporary Closure Of PLUS Rest Areas

Rest and Service areas (RSAs) and lay-bys would be temporarily closed to the public for maintenance.

15-12-2022
Auto News
Gua Musang Main Routes Closed For A Month For Lingkaran Tengah Project

Gua Musang Main Routes Closed For A Month For Lingkaran Tengah Project

The main entrances to Gua Musang were closed for a month beginning yesterday for the installation of bridge piles for the Lingkaran Tengah Utama Project (LTU).

31-03-2023
Auto News
Two Million Road Users Set To Enjoy Toll-Free LTU

Two Million Road Users Set To Enjoy Toll-Free LTU

A total of two million road users are expected to enjoy the toll-free Lingkaran Tengah Utama (LTU) Expressway.

27-01-2023
Auto News
LTU Expressway Not Opening For Aidilfitri - Works Minister

LTU Expressway Not Opening For Aidilfitri - Works Minister

The Works Minister denied claims that the LTU Expressway would be open for Aidilfitri.

24-03-2025
Auto News
KKR Seeking RM20 Million To Build R&R Along LTU Highway

KKR Seeking RM20 Million To Build R&R Along LTU Highway

Works Ministry seeks RM20 million budget allocation to set-up R&R along LTU Highway.

Latest News

Auto News
BYD Shark PHEV Pick-Up Truck Teased by BYD Cars Malaysia – Coming Soon?

BYD Shark PHEV Pick-Up Truck Teased by BYD Cars Malaysia – Coming Soon?

BYD Cars Malaysia has dropped a teaser for the BYD Shark PHEV pick-up truck. Coming to Malaysia soon?

12-11-2025
Auto News
Malaysia Scraps Rule of 78, Car Loan Savings Ahead - Analysts

Malaysia Scraps Rule of 78, Car Loan Savings Ahead - Analysts

Malaysia ends the Rule of 78, letting car loan borrowers save more with fairer interest.

12-11-2025
Auto News
Govt Not Forcing Aeroline To TBS, Corus KLCC Stop Unsuitable

Govt Not Forcing Aeroline To TBS, Corus KLCC Stop Unsuitable

Express bus operators aren’t forced to use TBS or TBG but must run from safe, licensed terminals.

12-11-2025
Auto News
Oct 2025 Vehicle Sales Up 30%, xEV Share at 8.7%

Oct 2025 Vehicle Sales Up 30%, xEV Share at 8.7%

Malaysia’s car market surged in Oct 2025 with 81,413 new registrations, up 30% from Sept’s 62,598 units.

Auto News
LATAR Interchange Opens, Direct Access To Eco Grandeur

LATAR Interchange Opens, Direct Access To Eco Grandeur

The Eco Grandeur Interchange and Toll Plaza has officially opened, offering direct access through Exit 2502 to Eco Grandeur.

11-11-2025
Auto News
Penang Sentral Set to Become Mainland’s Integrated Transport Hub

Penang Sentral Set to Become Mainland’s Integrated Transport Hub

The Butterworth KTM station, Mutiara Line LRT, and airport expansions will turn Penang Sentral into key transport and logistics hub.

Auto News
Six Bidders Eye Barrier-Free MLFF Toll System - Report

Six Bidders Eye Barrier-Free MLFF Toll System - Report

Six consortiums are reportedly competing to roll out Malaysia’s long-awaited MLFF toll system.

11-11-2025
Auto News
EV Ownership Risky, Battery Leasing Could Ease Depreciation Risks - Analysts

EV Ownership Risky, Battery Leasing Could Ease Depreciation Risks - Analysts

EVs can lose nearly half their value in five years, while high battery costs and limited infrastructure keep ownership risky.

11-11-2025