LTU Section 5A: Raub Bypass Opens On Friday
Photo: Bernama.
The Section 5A: Raub Bypass of the Lingkaran Tengah Utama (LTU) Expressway opened last night, Friday, at 12:01. The East Coast Expressway (LPT) to Kuala Lipis will take only 30 minutes to travel after this section opens, cutting down on the amount of time needed to pass through the towns of Bentong and Raub. The section's travel distance is 45.3 km.
When compared to using the current route, which goes through the Bentong and Raub, it can save two hours of travel time. Works Minister Datuk Seri Alexander Nanta Linggi stated, "We expect to reduce the risk of road accidents as well because the road junction that will be opened will be equipped with traffic lights."
“Additionally, this route is also expected to save the overall cost of travel, in addition to reducing traffic congestion on the existing Jalan Persekutuan, especially during peak hours, festive seasons and school holidays.” he added.
Photo: Bernama.
Section 5A: Raub Bypass is 9.6 km long overall. The entire length of the route that has been opened so far is 7 km, with the remaining 2.6 km expected to be completed in June of this year.
The LTU, formerly known as the Central Spine Road, connects Kuala Krai, Kelantan, to the LPT intersection and is 299.4 kilometers long and costs RM7.7 billion to build.
"The LTU is being implemented in stages involving five packages according to construction priorities based on areas that are prone to accidents and traffic congestion," Nanta said.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPM4876
SELANGOR
BSG7495
JOHOR
JYE4583
PULAU PINANG
PRT719
PERAK
ANY6825
PAHANG
CFD467
KEDAH
KGB6291
NEGERI SEMBILAN
NEG6315
KOTA KINABALU
SJL9999*
KUCHING
QAB8361L
Last updated 02 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
KKR Seeking RM20 Million To Build R&R Along LTU Highway
Works Ministry seeks RM20 million budget allocation to set-up R&R along LTU Highway.
11-10-2024
Central Spine Road Connecting Pahang To Kelantan 63.35% Complete
300 KM Central Spine Road is 63.35% complete with fourteen projects under construction.
25-07-2024
Pahang Govt. Identifies Two R&R Locations Along The LTU Expressway
Pahang govt. identifies two locations along the LTU Expressway to house new R&Rs.
12-04-2024
Gua Musang Main Routes Closed For A Month For Lingkaran Tengah Project
The main entrances to Gua Musang were closed for a month beginning yesterday for the installation of bridge piles for the Lingkaran Tengah Utama Project (LTU).
31-03-2023
Over 35,000 Accidents, 730 Fatalities On LPT1 Since 2004
35,551 accidents occurred on the LPT1 from 2004 to Dec 2024, resulting in 730 fatalities.
22-04-2025
AFA PRIME Bhd Issues TTA for KLK & LPT 1
AFA PRIME Bhd enhances traffic measures to ensure a smooth and safe Hari Raya Aidilfitri travel experience.
25-03-2025
TTA: 63% Traffic Surge On KLK and LPT1 Expected During CNY 2025
KLK and LPT1 expects traffic volume to increase by 63% and has issued Travel Time Advisory starting 25 Jan to 2 Feb, 2025.
23-01-2025
AFA Allocates RM2.1b For KL-Karak Highway Widening Project; Scheduled To Begin Jan 2025
AFA allocates RM2.1 billion for the KL-Karak highway widening project which is set to begin in Jan 2025.
29-11-2024
Latest News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized
JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.
02-08-2025
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score
The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?
02-08-2025
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted
New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.
01-08-2025
Govt Looking To Revive MEX II Highway With New Completion Plan
The government is working with bondholders to restart the long-delayed MEX II Highway.
01-08-2025
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days
2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.
01-08-2025
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready
Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.
01-08-2025
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas
With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.
01-08-2025
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout
PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.
01-08-2025
Show More
trending_flat