ENZHMS
Link Copiedcheck_circle
Auto News

LTU Section 5A: Raub Bypass Opens On Friday

Anis

Share via

Lingkaran-Tengah-Utama-LTU-Expressway.jpg
Photo: Bernama. The Section 5A: Raub Bypass of the Lingkaran Tengah Utama (LTU) Expressway opened last night, Friday, at 12:01. The East Coast Expressway (LPT) to Kuala Lipis will take only 30 minutes to travel after this section opens, cutting down on the amount of time needed to pass through the towns of Bentong and Raub. The section's travel distance is 45.3 km.


When compared to using the current route, which goes through the Bentong and Raub, it can save two hours of travel time. Works Minister Datuk Seri Alexander Nanta Linggi stated, "We expect to reduce the risk of road accidents as well because the road junction that will be opened will be equipped with traffic lights."

“Additionally, this route is also expected to save the overall cost of travel, in addition to reducing traffic congestion on the existing Jalan Persekutuan, especially during peak hours, festive seasons and school holidays.” he added. 51f398038ab87be2911c5d711d05070765e97caca1e97.webp
Photo: Bernama.
Section 5A: Raub Bypass is 9.6 km long overall. The entire length of the route that has been opened so far is 7 km, with the remaining 2.6 km expected to be completed in June of this year.
The LTU, formerly known as the Central Spine Road, connects Kuala Krai, Kelantan, to the LPT intersection and is 299.4 kilometers long and costs RM7.7 billion to build.

"The LTU is being implemented in stages involving five packages according to construction priorities based on areas that are prone to accidents and traffic congestion," Nanta said.

Untitled-design---2024-03-08T100027.492.png

Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

JPJ Running Numbers

KUALA LUMPUR

VPM4876

SELANGOR

BSG7495

JOHOR

JYE4583

PULAU PINANG

PRT719

PERAK

ANY6825

PAHANG

CFD467

KEDAH

KGB6291

NEGERI SEMBILAN

NEG6315

KOTA KINABALU

SJL9999*

KUCHING

QAB8361L

Last updated 02 Aug, 2025

Fuel Price

Petrol

RON 95

RM 2.05

RON 97

RM 3.17

-0.04

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.91

EURO 5 B7

RM 3.11

Last updated 31 Jul, 2025

Related News

Auto News
KKR Seeking RM20 Million To Build R&R Along LTU Highway

KKR Seeking RM20 Million To Build R&R Along LTU Highway

Works Ministry seeks RM20 million budget allocation to set-up R&R along LTU Highway.

Auto News
Central Spine Road Connecting Pahang To Kelantan 63.35% Complete

Central Spine Road Connecting Pahang To Kelantan 63.35% Complete

300 KM Central Spine Road is 63.35% complete with fourteen projects under construction.

Auto News
Pahang Govt. Identifies Two R&R Locations Along The LTU Expressway

Pahang Govt. Identifies Two R&R Locations Along The LTU Expressway

Pahang govt. identifies two locations along the LTU Expressway to house new R&Rs.

Auto News
Gua Musang Main Routes Closed For A Month For Lingkaran Tengah Project

Gua Musang Main Routes Closed For A Month For Lingkaran Tengah Project

The main entrances to Gua Musang were closed for a month beginning yesterday for the installation of bridge piles for the Lingkaran Tengah Utama Project (LTU).

31-03-2023
Auto News
Over 35,000 Accidents, 730 Fatalities On LPT1 Since 2004

Over 35,000 Accidents, 730 Fatalities On LPT1 Since 2004

35,551 accidents occurred on the LPT1 from 2004 to Dec 2024, resulting in 730 fatalities.

22-04-2025
Auto News
AFA PRIME Bhd Issues TTA for KLK & LPT 1

AFA PRIME Bhd Issues TTA for KLK & LPT 1

AFA PRIME Bhd enhances traffic measures to ensure a smooth and safe Hari Raya Aidilfitri travel experience.

Auto News
TTA: 63% Traffic Surge On KLK and LPT1 Expected During CNY 2025

TTA: 63% Traffic Surge On KLK and LPT1 Expected During CNY 2025

KLK and LPT1 expects traffic volume to increase by 63% and has issued Travel Time Advisory starting 25 Jan to 2 Feb, 2025.

Auto News
AFA Allocates RM2.1b For KL-Karak Highway Widening Project; Scheduled To Begin Jan 2025

AFA Allocates RM2.1b For KL-Karak Highway Widening Project; Scheduled To Begin Jan 2025

AFA allocates RM2.1 billion for the KL-Karak highway widening project which is set to begin in Jan 2025.

29-11-2024

Latest News

Auto News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized

JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized

JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.

Auto News
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score

Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score

The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?

02-08-2025
Auto News
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.

01-08-2025
Auto News
Govt Looking To Revive MEX II Highway With New Completion Plan

Govt Looking To Revive MEX II Highway With New Completion Plan

The government is working with bondholders to restart the long-delayed MEX II Highway.

01-08-2025
Auto News
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.

01-08-2025
Auto News
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.

01-08-2025
Auto News
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.

Auto News
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.

Show More

trending_flat
Carz Automedia Malaysia Logo
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.