Link Copiedcheck_circle
Auto News

Penang On Track And Well-Prepared For Large Scale Projects

Anis

Share via

3002819.jpeg
Penang Chief Minister Chow Kon Yeow revealed today that the state government plans to enact comprehensive traffic management solutions to lessen disturbances from upcoming large-scale construction.

Drawing on insights gained from a past visit to Gamuda in Kuala Lumpur, particularly their traffic management strategies during LRT construction, the government is well prepared, he says.

While acknowledging that projects like the Penang South Islands (PSI), Mutiara Line LRT, and the Juru–Sungai Dua Elevated Highway will likely lead to temporary traffic congestion, Chow affirmed that such disruptions are an expected element of development.
SRS_Penang-Island_img1.jpg

“I believe all contractors involved in these major projects in Penang will take traffic dispersal into account. The key consideration is to maintain the original number of lanes during construction

“Even if parts of the road need to be closed to vehicles, additional space must be created to ensure that the same number of lanes remains available,” he says, adding that proper state management could ease traffic and improve travel.

Chow also confirmed the Juru-Sungai Dua Elevated Highway construction would begin by year's end, and the Penang LRT project, starting in Q3, would be completed in six to seven years.

Untitled6-3-(2).jpg

In addition, significant progress has also been made on the Penang South Islands (PSI) project, with 60.71ha of land reclaimed over the last 18 months. Looking ahead, the state administration anticipates positive announcements from the federal government regarding incentives for industrial property buyers.

During the October 2024 budget announcement, Prime Minister Anwar Ibrahim announced several key Penang projects, including the Juru–Sungai Dua Elevated Highway, enhancements to Penang International Airport, and the new Batu Kawan Industrial Park 3.
juru-sungai-dua-elevated-highway.jpeg
Photo: Penang Property Talk.
Notably, the 29.5km Mutiara Line LRT, featuring 21 stops, aims to significantly improve transportation links between Penang island and the mainland, addressing both general accessibility and road congestion issues.


Tagged:

Penang traffic management
Penang South Islands (PSI)
Mutiara Line LRT
Juru–Sungai Dua Elevated Highway
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

Penang Traffic Woes Persist Despite PTMP - Penang Gerakan

Penang Gerakan urges an independent review of the PTMP, saying poor planning has worsened traffic instead of easing it.

29-09-2025
Auto News

Flyovers Won’t Fix Penang’s Traffic - Analysts

Analysts warn Penang’s congestion can’t be solved by endless flyovers, urging better management.

08-09-2025
Auto News

Penang LRT: Major Road Diversions in Bayan Lepas from Jan 2026

Traffic along Jalan Sultan Azlan Shah will be cut from three lanes to two for Penang LRT construction, with works stretching until 2028.

Auto News

Anwar: 13MP Pushes for Improved Connectivity – Better Buses, Trains and Roads

The 13th Malaysia Plan focuses on better connectivity through buses, trains, roads, and smarter planning.

Auto News

Mutiara Line LRT: Penang’s RM8.3 Billion Connectivity Investment

Penang’s RM8.31 billion Mutiara Line LRT project begins with the first phase contract signing.

Auto News

Penang Mutiara Line LRT Won’t Be Like Kelana Jaya LRT

Penang’s Mutiara Line LRT would run only 2-car train when it begins and would scale up if required.

Auto News

Penang Mutiara Line LRT Project Set to Complete in 2030

The cabinet has approved the construction of the Penang Mutiara Line LRT Project, with completion expected by 2023.

Auto News

New Juru-Sungai Dua Highway Project - Q4 2025 Start, 2030 Completion

Juru-Sungai Dua Elevated Highway construction set to begin in Q4 2025 and complete by 2030.

Latest News

Auto News

Updated Fuel Prices From 13 To 19 November

The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 13 to 19 November, 2025, the rates are as such.

12-11-2025
Auto News

RM1.7b NPE2 Extension To Ease KL Congestion By 2029 - Nanta

The NPE2 will connect Pantai Dalam to Jalan Istana, cutting travel time by up to 25 minutes and improving traffic flow across KL.

12-11-2025
Auto News

BYD Shark PHEV Pick-Up Truck Teased by BYD Cars Malaysia – Coming Soon?

BYD Cars Malaysia has dropped a teaser for the BYD Shark PHEV pick-up truck. Coming to Malaysia soon?

12-11-2025
Auto News

Malaysia Scraps Rule of 78, Car Loan Savings Ahead - Analysts

Malaysia ends the Rule of 78, letting car loan borrowers save more with fairer interest.

12-11-2025
Auto News

Govt Not Forcing Aeroline To TBS, Corus KLCC Stop Unsuitable

Express bus operators aren’t forced to use TBS or TBG but must run from safe, licensed terminals.

12-11-2025
Auto News

Oct 2025 Vehicle Sales Up 30%, xEV Share at 8.7%

Malaysia’s car market surged in Oct 2025 with 81,413 new registrations, up 30% from Sept’s 62,598 units.

Auto News

LATAR Interchange Opens, Direct Access To Eco Grandeur

The Eco Grandeur Interchange and Toll Plaza has officially opened, offering direct access through Exit 2502 to Eco Grandeur.

11-11-2025
Auto News

Penang Sentral Set to Become Mainland’s Integrated Transport Hub

The Butterworth KTM station, Mutiara Line LRT, and airport expansions will turn Penang Sentral into key transport and logistics hub.