Link Copiedcheck_circle
Auto News

RM4b Needed, Critical Road Repairs Come First

Anis

Share via

f-jln-1.jpg
Due to budget constraints, road repairs in high-risk areas nationwide will be carried out in stages, prioritising the most severely damaged sections, said Works Minister Datuk Seri Alexander Nanta Linggi.

Speaking at the Works Ministry’s Gawai Open House, he revealed that nearly RM4 billion is needed to fix all identified hazardous roads, far beyond the current available funding.
WhatsApp-Image-2022-04-28-at-8.31.45-AM.jpeg

“We already have complete data on dangerous roads and the financial requirements. To fix everything would cost RM4 billion, but we don’t have that much allocation, so we will proceed in stages,” he says in a Bernama report.

He was addressing the ministry's response following the June 9 incident that claimed 15 UPSI student lives on the East-West Highway (JRTB) between Gerik and Jeli.

This year, according to the minister, RM55 million has been allocated specifically for upgrades to the JRTB, including the installation of 385 street lights and improved road markings.
pothole_theStar-full_normal.jpg

Nanta added that the ministry is prioritising repairs based on its database, focusing first on roads in the worst condition.


“We focus on the critical ones first. Those that are damaged but not too badly will be delayed slightly,” he said, adding that road assessments follow the Pavement Condition Assessment (PCA) method using MLP and FWD technologies, with the JRTB assessment conducted from March 13 to May 13.
JALAN-GERIK.jpeg

Commenting on calls to install guardrails at high-risk areas, Nanta said the Works Ministry is open to public feedback, including suggestions shared online.

"We take into account all views, from the public, netizens and relevant stakeholders. We will evaluate every suggestion carefully,” he further added.




Tagged:

Road repairs
damaged roads
pothole repair
Public Works Minister Datuk Seri Alexander Nanta Linggi
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News
Nanta: Damaged Road Surface Linked to Cyclist’s Death

Nanta: Damaged Road Surface Linked to Cyclist’s Death

Road damage blamed on heavy lorry traffic; urgent repairs ordered following fatal crash.

Auto News
AI and Drones: The Future of Road Safety?

AI and Drones: The Future of Road Safety?

AI, drones, and public feedback could soon help fix potholes before they claim more lives.

Auto News
Report: Over RM1.9 billion Spent To Maintain Pen. Malaysia Roads In 2024

Report: Over RM1.9 billion Spent To Maintain Pen. Malaysia Roads In 2024

Works Minister revealed over RM1.9 billion was spent to maintain roads in 11 states across Peninsular Malaysia in 2024.

26-02-2025
Auto News
Authorities Must Follow 24h Road Repair SOP - Works Ministry

Authorities Must Follow 24h Road Repair SOP - Works Ministry

Authorities must follow the SOP set by KKR to repair damaged federal roads within 24 hours.

27-11-2024
Auto News
Works Minister: RM4 Billion Needed To Repair Federal Roads

Works Minister: RM4 Billion Needed To Repair Federal Roads

Works Minister Datuk Seri Alexander Nanta Linggi revealed up to RM4 billion is needed to repair federal roads.

30-07-2024
Auto News
Works Minister Demands Urgent Report On Kluang Pothole Crash

Works Minister Demands Urgent Report On Kluang Pothole Crash

Works Minister demanded a swift report on the poor maintenance of Jalan Sengkang-Felda Inas-Bandar Tenggara road.

28-03-2025
Auto News
Works Minister Scheduled To Meet Concessionaire Over Fatal Johor Pothole Accident

Works Minister Scheduled To Meet Concessionaire Over Fatal Johor Pothole Accident

Works minister has scheduled an urgent meeting with concessionaire after the fatal Johor pothole accident.

26-03-2025
Auto News
Potholes Must Be Fixed Within 24 Hours - Works Minister

Potholes Must Be Fixed Within 24 Hours - Works Minister

The Works Minister urged the Federal road concessionaires to temporarily patch damaged roads within 24 hours.

24-03-2025

Latest News

Auto News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News
1,489 Summonses Issued in VEP Enforcement Operation – JPJ

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News
RM110 Million Collected from Special Plate Sales Since 2023 – MoT

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News
ETS to JB Sentral ‘On Track’, But Not Quite There Yet

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.