Link Copiedcheck_circle
Auto News

Kulai-Sedenak Upgrade Begins, 4KM Stretch Opens By 2026

Anis

Share via

506594000_661238170267626_5774670279704758418_n.jpg Motorists using the North-South Expressway (PLUS) can look forward to a smoother drive soon, with a four-kilometre stretch from Kulai to Sedenak set to open in phases as early as next year.

This forms part of Phase 1, Package 1 of the highway widening project which is a 14-kilometre upgrade costing RM249 million, aimed at easing congestion along one of the country’s busiest routes.

“Construction began on June 28 last year and is scheduled to be completed by June 28, 2027

“Currently, progress stands at 16.44%, slightly behind the projected 20.02%, with a 3.58% delay,” said Johor’s Public Works, Transport, Infrastructure and Communications chairman, Mohamad Fazli Mohamad Salleh. He added that the state government has held discussions with LLM, PLUS Malaysia Berhad, and contractors to get the project back on track by September.

Meanwhile, Phase 1, Package 2 which is a seven-kilometre stretch from Sedenak to Simpang Renggam began on June 22 with a budget of RM160 million, and is currently in its early stages. Completion is expected by December 22, 2027.

521532502_661238203600956_7858669665951452851_n.jpg
Phase 2, which spans 16 kilometres from Simpang Renggam to Machap, officially kicks off July 27, following the appointment of the main contractor on July 1. With a cost of RM439 million, this phase is targeted for completion by July 27, 2029.

The multibillion-ringgit widening effort is part of the Maju Johor 2030 agenda, aimed at upgrading infrastructure and improving traffic flow along the southern corridor, a critical artery for both commuters and logistics.


Tagged:

PLUS Highway
PLUS Kulai-Sedenak
PLUS Kulai-Sedenak Upgrade
Malaysia drivers licence (LLM)
PLUS
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News
New Nilai Interchange To Be Built To Ease Senawang-KL Congestion

New Nilai Interchange To Be Built To Ease Senawang-KL Congestion

A new interchange linking the PLUS Highway and Nilai-Labu-Enstek route will be built next year.

06-11-2025
Auto News
PLUS Road Diversions at Kulai–Sedenak from Oct 27–30

PLUS Road Diversions at Kulai–Sedenak from Oct 27–30

PLUS diverting traffic at Kulai–Sedenak to facilitate bridge beam installation from Oct 27 to 30.

Auto News
PLUS Announces Partial Lane Closures On NKVE, 10-11 Sept

PLUS Announces Partial Lane Closures On NKVE, 10-11 Sept

Closures between Jalan Duta and Bukit Lanjan will take place from 11PM to 5AM for billboard gantry installation.

09-09-2025
EV
PLUS Surpasses 2025 Target with 112 EV Chargers

PLUS Surpasses 2025 Target with 112 EV Chargers

PLUS has rolled out 112 EV charging points across its highways, surpassing its 2025 target months ahead of schedule.

Auto News
Police Investigating Viral Video Of Cars Blocking Traffic On PLUS Highway

Police Investigating Viral Video Of Cars Blocking Traffic On PLUS Highway

Police are investigating a video showing three cars blocking traffic near Pedas-Linggi R&R on the southbound PLUS Highway.

03-07-2025
Auto News
PLUS Highway Anticipates Over Two Million Vehicles For Hari Raya

PLUS Highway Anticipates Over Two Million Vehicles For Hari Raya

PLUS Highway poised to see over two million cars using its highways during peak periods of upcoming Hari Raya Aidilfitri holiday travels.

19-03-2025
Auto News
PLUS Will Begin Trial Runs On MLFF In April

PLUS Will Begin Trial Runs On MLFF In April

PLUS aims to commence testing a prototype of its MLFF system by April of this year.

12-02-2025
Auto News
PLUS Begins Smartlane Trials on ELITE Lingkaran Putrajaya

PLUS Begins Smartlane Trials on ELITE Lingkaran Putrajaya

PLUS will begin trialling the Smartlane function on the ELITE Highway at Lingkaran Putrajaya, from KM P3.0 to KM P4.0.

14-01-2025

Latest News

Auto News
PLUS To Close Two Bangi Ramps Nightly Until Nov 28

PLUS To Close Two Bangi Ramps Nightly Until Nov 28

PLUS will close two ramps near Bangi nightly from 10PM to 5AM starting today until Nov 28.

10-11-2025
Auto News
KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance

KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance

KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.

10-11-2025
Auto News
4.4 Mil Old Vehicles Threaten Road Safety, Incentive Alone Insufficient

4.4 Mil Old Vehicles Threaten Road Safety, Incentive Alone Insufficient

JPJ data shows over 4.4 million old vehicles are still on the road making up about 17% of the country’s 25.7m active vehicles.

10-11-2025
Auto News
Proton Shifts 15,575 Units In Oct 2025, Outgoing Saga Still Leads

Proton Shifts 15,575 Units In Oct 2025, Outgoing Saga Still Leads

Proton closes Oct 2025 by shifting 15,575 units, outgoing Saga sales spikes to 12-year high ahead of successor’s debut.

10-11-2025
Auto News
JPJ Warns Public Against Fake “Free Driving Licence” TikTok Scams

JPJ Warns Public Against Fake “Free Driving Licence” TikTok Scams

JPJ has warned the public about fake TikTok posts claiming people can get free driving licences without any tests.

10-11-2025
Auto News
RM3b Juru–Sungai Dua Link Cuts Travel Time To Just  20 Minutes

RM3b Juru–Sungai Dua Link Cuts Travel Time To Just 20 Minutes

RM3 billion traffic dispersal project aims to slash travel time between Juru and Sungai Dua from an hour to just 20 minutes.

Auto News
Nanta: Barrier-Free ANPR Toll System Still at RFP Stage

Nanta: Barrier-Free ANPR Toll System Still at RFP Stage

The Works Ministry is inviting proposals for an ANPR-based barrier-free MLFF toll system.

Auto News
New Leapmotor 3S Showroom Opens In Ipoh, Perak

New Leapmotor 3S Showroom Opens In Ipoh, Perak

Perak state capital of Ipoh gains new Leapmotor brand 3S showroom and service outlet operated by dealers CST Auto.

07-11-2025