Link Copiedcheck_circle
Auto News

RTS2 Proposal Gains Support to Ease Tuas Congestion

Anis

Share via

jb-singapore-rts-link-02-(1)-full_normal-full_normal.jpg

Johor’s proposal for a second Rapid Transit System (RTS) Link between Tuas and Iskandar Puteri is gaining support among commuters in southwest Johor, according to a report by CNA.

Residents in Gelang Patah, Pontian and Kulai, many of whom travel daily to Singapore via the Tuas Second Link, told CNA the idea could be a real game changer, especially for those currently relying on buses. On a recent weekday morning, the daily portal observed more than a hundred people already in line at the Gelang Patah bus terminal before 5am.  RTS-Link-Alignment-Map-August-2023-BM-1536x891-full_normal.jpg

The first Causeway Link bus filled up immediately, leaving others to wait for the next one. Commuters said this is a common sight during peak hours.

One regular traveller from Gelang Patah, Kevin Foh, shared that buses often arrive full and passengers sometimes have to let two or three go before they can get a seat. 

"I believe the proposed RTS2 could transform our daily journey with a short taxi ride to an RTS station in Iskandar Puteri, then a direct train to Singapore, without the long queues and waiting," he says in the report. tuas-6-full_normal.jpg
The proposal was announced on July 31 by Johor Menteri Besar Datuk Onn Hafiz Ghazi after a meeting with Singapore Prime Minister Lawrence Wong. 

"The plan follows a decree from Johor Regent Tunku Ismail Sultan Ibrahim, although details such as station locations have yet to be confirmed," the minister stated.

The first RTS Link, connecting Bukit Chagar in Johor Bahru to Woodlands North in Singapore, is set to open in December 2026, with rail installation works already more than halfway done. 

But for Gelang Patah residents, Bukit Chagar is about 25 kilometres away, and the trip can take up to two hours by bus during rush hour. JB-CIQ-Immigration-Queue.jpg
Analysts told CNA the proposed RTS2 could ease congestion, reduce travel time for western Johor commuters, and boost growth in Iskandar Puteri, part of the Johor-Singapore Special Economic Zone. 

Still, they pointed out the challenge of limited last-mile connectivity in both Tuas and Iskandar Puteri, and questioned whether passenger numbers would justify the construction costs.

Tagged:

Rapid Transit System Link (RTS Link)
RTS2 Link proposal
RTS2 Link
Johor-Singapore Special Economic Zone
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News
RTS Link 65% Complete, First Train Arriving This Month

RTS Link 65% Complete, First Train Arriving This Month

RTS Link connecting JB and SG is officially 65% complete, with the first train set expected to arrive this month.

03-11-2025
Auto News
RTS Link On Track As Bukit Chagar Hub Completed

RTS Link On Track As Bukit Chagar Hub Completed

The Johor Bahru-Singapore RTS Link has completed its Bukit Chagar terminal and remains on track for launch by end-2026.

30-07-2025
Auto News
Nightly Closure of Jalan Ismail Sultan for RTS Works Until July 16

Nightly Closure of Jalan Ismail Sultan for RTS Works Until July 16

Jalan Ismail Sultan (Stulang-bound) will be closed nightly from 10PM to 5AM for RTS Link construction until July 16.

Auto News
First RTS Link Train Set Delivered Ahead of 2026 Launch

First RTS Link Train Set Delivered Ahead of 2026 Launch

The first train set for the Johor Bahru-Singapore RTS Link was unveiled today and will begin testing soon.

30-06-2025
Auto News
KTM Shuttle Tebrau Ends 2027, Replaced By RTS Link

KTM Shuttle Tebrau Ends 2027, Replaced By RTS Link

KTM Berhad’s Shuttle Tebrau service ends in 2027 and will be replaced by the RTS link.

25-06-2025
Auto News
RTS Link: Key Road Closure in JB Until End of 2026

RTS Link: Key Road Closure in JB Until End of 2026

Jalan Johor Bahru–Endau closed for 18 months starting June 3 as RTS construction ramps up.

Auto News
Gov't Considering LRT Or Tram-Bus For RTS Link To Ease Congestion In JB

Gov't Considering LRT Or Tram-Bus For RTS Link To Ease Congestion In JB

Putrajaya is considering either a LRT or a tram-bus system in JB to alleviate congestion once the RTS system is completed.

05-02-2025
Auto News
JB Motorists Face Increased Congestion Due To RTS Link Construction

JB Motorists Face Increased Congestion Due To RTS Link Construction

Johor Bahru mayor warns motorists of increased congestion as RTS Link construction ramps up.

Latest News

Auto News
WCE Road Closure on Nov 9 For Klang Royal City Marathon 2025

WCE Road Closure on Nov 9 For Klang Royal City Marathon 2025

Parts of West Coast Expressway (WCE) will temporarily close for Klang Royal City Marathon on Sunday, Nov 9 2025.

Auto News
New Nilai Interchange To Be Built To Ease Senawang-KL Congestion

New Nilai Interchange To Be Built To Ease Senawang-KL Congestion

A new interchange linking the PLUS Highway and Nilai-Labu-Enstek route will be built next year.

06-11-2025
Auto News
Malaysia, China In Talks To Form SPV For Passenger Train Leasing

Malaysia, China In Talks To Form SPV For Passenger Train Leasing

Malaysia and China are planning to set up a joint company to lease passenger trains to boost rail services.

06-11-2025
Auto News
Aeroline Suspension Shows Outdated Transport Rules - Experts

Aeroline Suspension Shows Outdated Transport Rules - Experts

Experts and tourism groups warn the aeroline suspension exposes outdated transport rules and derail VM2026 plans.

06-11-2025
Auto News
Third-Gen Mazda CX-5 Set to Debut in Malaysia in Q3 2026 – CBU First, 2.5L Only

Third-Gen Mazda CX-5 Set to Debut in Malaysia in Q3 2026 – CBU First, 2.5L Only

Bermaz Auto Berhad confirms plans to introduce the third-gen Mazda CX-5 next year as a fully imported offering from Japan.

06-11-2025
Auto News
Bateri Madani Launched - New Low-Cost MF Car Battery Option

Bateri Madani Launched - New Low-Cost MF Car Battery Option

Sejamas World rolled out Bateri Madani - a maintenance-free car battery range priced from RM130.

Auto News
UMWT Shifted 9,141 Units in Oct 2025, YTD Now at 79,559 Units

UMWT Shifted 9,141 Units in Oct 2025, YTD Now at 79,559 Units

UMW Toyota Motor closes October 2025 on a high note by shifting 9,141 units, bringing its YTD sales to 79,559 units.

05-11-2025
Auto News
Updated Fuel Prices From 6 To 12 November

Updated Fuel Prices From 6 To 12 November

The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 6 to 12 November, 2025, the rates are as such.

05-11-2025