RTS2 Proposal Gains Support to Ease Tuas Congestion
-full_normal-full_normal-full_normal.jpg)
Johor’s proposal for a second Rapid Transit System (RTS) Link between Tuas and Iskandar Puteri is gaining support among commuters in southwest Johor, according to a report by CNA.
Residents in Gelang Patah, Pontian and Kulai, many of whom travel daily to Singapore via the Tuas Second Link, told CNA the idea could be a real game changer, especially for those currently relying on buses.
On a recent weekday morning, the daily portal observed more than a hundred people already in line at the Gelang Patah bus terminal before 5am.
The first Causeway Link bus filled up immediately, leaving others to wait for the next one. Commuters said this is a common sight during peak hours.
One regular traveller from Gelang Patah, Kevin Foh, shared that buses often arrive full and passengers sometimes have to let two or three go before they can get a seat.
"I believe the proposed RTS2 could transform our daily journey with a short taxi ride to an RTS station in Iskandar Puteri, then a direct train to Singapore, without the long queues and waiting," he says in the report.

The proposal was announced on July 31 by Johor Menteri Besar Datuk Onn Hafiz Ghazi after a meeting with Singapore Prime Minister Lawrence Wong.
"The plan follows a decree from Johor Regent Tunku Ismail Sultan Ibrahim, although details such as station locations have yet to be confirmed," the minister stated.
The first RTS Link, connecting Bukit Chagar in Johor Bahru to Woodlands North in Singapore, is set to open in December 2026, with rail installation works already more than halfway done.
But for Gelang Patah residents, Bukit Chagar is about 25 kilometres away, and the trip can take up to two hours by bus during rush hour.

Analysts told CNA the proposed RTS2 could ease congestion, reduce travel time for western Johor commuters, and boost growth in Iskandar Puteri, part of the Johor-Singapore Special Economic Zone.
Still, they pointed out the challenge of limited last-mile connectivity in both Tuas and Iskandar Puteri, and questioned whether passenger numbers would justify the construction costs.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQH2354
SELANGOR
BSL5648
JOHOR
JYP5134
PULAU PINANG
PRX4918
PERAK
APE607
PAHANG
CFE7279
KEDAH
KGD7617
NEGERI SEMBILAN
NEJ2484
KOTA KINABALU
SJP6864
KUCHING
QAB129N
Last updated 12 Jan, 2026
Fuel Price
Petrol
RON 95
RM 2.54
-0.02
RON 97
RM 3.11
-0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.89
-0.05
EURO 5 B7
RM 3.09
-0.05
Last updated 08 Jan, 2026
Related News
Johor-Singapore RTS Completes First Test Run from Wadi Hana To Border
The RTS Link completes its first train test run from Wadi Hana Depot through Bukit Chagar to the Malaysia-Singapore border.
30-12-2025
Johor Questions Delay as Penang LRT Gets Federal Nod
Johor is urging Putrajaya to expedite approval for its long-awaited rail system to avoid RTS congestion.
21-11-2025
RTS Link: First Train Arrives In Johor, Testing Kicks Off At Wadi Hana Depot
Train Set 02 has arrived at Wadi Hana Depot, marking the start of critical testing and commissioning.
17-11-2025
RTS Link 65% Complete, First Train Arriving This Month
RTS Link connecting JB and SG is officially 65% complete, with the first train set expected to arrive this month.
03-11-2025
RTS Link On Track As Bukit Chagar Hub Completed
The Johor Bahru-Singapore RTS Link has completed its Bukit Chagar terminal and remains on track for launch by end-2026.
30-07-2025
Nightly Closure of Jalan Ismail Sultan for RTS Works Until July 16
Jalan Ismail Sultan (Stulang-bound) will be closed nightly from 10PM to 5AM for RTS Link construction until July 16.
04-07-2025
First RTS Link Train Set Delivered Ahead of 2026 Launch
The first train set for the Johor Bahru-Singapore RTS Link was unveiled today and will begin testing soon.
30-06-2025
KTM Shuttle Tebrau Ends 2027, Replaced By RTS Link
KTM Berhad’s Shuttle Tebrau service ends in 2027 and will be replaced by the RTS link.
25-06-2025
Latest News
Jaecoo J5 Poised To Galvanize O&J Malaysia In 2026
Fresh off a breakout 2025, O&J Malaysia is turning to the J5 to sustain its rapid growth into the new year.
12-01-2026
Rapid KL Set To Restructure Bus Routes Starting Jan 16
Rapid KL will restructure selected bus and MRT feeder routes starting Jan 16, shifting low-demand services to on-demand vans.
12-01-2026
PLUS Rolls Out ANPR Toll Pilot on Kedah–Penang Stretch
PLUS Malaysia’s ANPR toll pilot delivers lane freedom while laying the groundwork for Multi Lane Free Flow tolling.
12-01-2026
Dec 2025 Vehicle Sales: Petrol Up 24.5%, xEV Hits Record 12.4%
Dec 2025 registrations rose 24.5%, lifting Malaysia’s auto market past 800,000 units as xEV share hit 12.4%.
11-01-2026
BHPetrol Unveils Refreshed BHPetromart and eNak Concept
BHPetrol launches refreshed BHPetromart and eNak concepts, present more modern and customer-centric retail direction.
10-01-2026
Chery Kicks Off CNY With SUV Deals Starting RM88,800
Chery Malaysia launches Lunar New Year SUV deals, with top models discounted and extra perks for red cars.
09-01-2026
Jetour T2 Secures 5-Star ASEAN NCAP Rating
Jetour T2 secures 5-Star ASEAN NCAP rating, setting a strong safety benchmark ahead of its expected Malaysian launch.
09-01-2026
MyDigital ID Becomes Mandatory Login For MyNIISe From Jan 15
From Jan 15, Malaysians must use MyDigital ID as the single login to access the MyNIISe immigration app.
09-01-2026
Show More
trending_flat