RapidKL Is Upgrading The LRT, MRT & Monorail Audio System

Heads up, RapidKL users. RapidKL has announced that the upgrading work for the audio system of the LRT, MRT and Monorail is currently underway in phases. This upgrading work is part of the firm’s preparation before the official opening of the MRT Putrajaya Line Phase 2, taking place later this month.
Passengers are advised not to heed or give attention to any announcements made pertaining to the new MRT Line. “For your information, the interchange stations to the MRT Putrajaya Line Phase 2 are yet to open,” Rapid KL says.
-full.jpg)
-full.jpg)
The Phase 2 of the current MRT Putrajaya Line covers a total of 15 elevated stations and nine underground stations, which starts from the Kampung Batu, nearby Jalan Ipoh in the heart of Kuala Lumpur. Once opened, the MRT Putrajaya Line will start from Kwasa Damansara to Putrajaya Sentral, with up to nine interchange stations along the line.

-full.jpg)
The MRT Putrajaya Line Phase 2 is set to commence its service beginning on March 16, 2023, from 3 PM onwards.

Gallery
Written By
Mukhlis Azman
An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman
JPJ Running Numbers
KUALA LUMPUR
VPX9572
SELANGOR
BSJ8763
JOHOR
JYK5491
PULAU PINANG
PRV4299
PERAK
APC3020
PAHANG
CFD9637
KEDAH
KGC8424
NEGERI SEMBILAN
NEH5209
KOTA KINABALU
SJN5243
KUCHING
QAB4734M
Last updated 03 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
+0.06
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.95
+0.06
EURO 5 B7
RM 3.15
+0.06
Last updated 30 Oct, 2025
Related News
Raya 2023, Rapid Rail Extends Service To Selected Stations On April 15
Rapid Rail extended its operation hours on selected train stations until 1.30AM this Saturday (April 15).
13-04-2023
Rapid Rail Suspends LRT Operations At Six Stations, Starting April 2
Rapid KL has announced six stations on the Ampang – Sri Petaling LRT line will be suspended starting April 2.
31-03-2023
MRT Putrajaya Line Free Ride Ends Tomorrow March 31
MRT Putrajaya Line free ride ends tomorrow on March 31.
30-03-2023
"Need To Optimise Space On Short Commuter Trains Greater Than Need For Special Women's Coaches" - Loke
There are no special coaches for women on the public transportations because space on such trains must be maximized, says Loke.
23-03-2023
Rapid Rail & Bus Peak Hour Recalibration For Ramadan Month
Rapid KL has announced its recalibration of peak operational hours throughout the month of Ramadan this year.
23-03-2023
LOKE : Public Transport To Have Open Payment Solution Soon - Credit & Debit Card
Commuters would eventually be able to use their credit or debit cards on top of the current Touch 'n Go cards for public transports.
21-03-2023
PM Announces Free MRT Putrajaya Line Fares Until End Of March
PM inaugurated the full launch of MRT Putrajaya Line plus announced free fares starting March 16 to 31, 2023.
16-03-2023
MRT Putrajaya Line Phase Two Expected To Lessen Traffic Congestion Heading To KL
MRT Putrajaya Line Phase Two is expected to reduce traffic congestion to the city centre.
13-03-2023
Latest News
Datuk Abdul Rashid Musa Returns To Proton As Deputy CEO
Datuk Abdul Rashid Musa returns to Proton as Deputy CEO, succeeding Roslan Abdullah.
03-11-2025
ETS3 To Johor Bahru Set To Roll Out by Mid-December
The ETS3 line is set to launch by mid-Dec, extending the Electric Train Service from Gemas to JB.
03-11-2025
Selangor Govt Will Decide Fate Of 19 WCE-Affected Residents
The Selangor govt is set to decide soon on the fate of 19 Kampung Jawa residents affected by the West Coast Expressway project.
03-11-2025
APAD Orders Aeroline To Halt Services Over Repeated Non-Compliance
Aeroline was directed to halt trips from Nov 6 to Dec 5 after failing to relocate to approved terminals as required by APAD.
03-11-2025
VEP: No Exit Without Permit, Crackdown Begins Nov 15
Foreign vehicles, particularly from Singapore, cannot leave Malaysia without an active VEP and fines fully settled.
01-11-2025
BUDI95 Fuel Shortfall Claims Untrue - KPDN
KPDN says claims of fuel shortfalls under the BUDI95 are unfounded after inspections found all petrol pumps accurate.
31-10-2025
Suzuki Fronx Secures 5-Star ASEAN NCAP Rating
The new Suzuki Fronx achieves full 5-star ASEAN NCAP rating, scoring 77.70 points under latest 2021–2025 protocol.
31-10-2025
LPT3 Will Proceed Under Public-Private Partnership Model - Ahmad Maslan
RM9.8b East Coast Expressway 3 (LPT3) will be developed via public-private partnership at no cost to the government.
31-10-2025
Show More
trending_flat