EVCB Guideline - Will EVB Requirement Hamper EV Charger Growth?
-full_normal.jpg)
PLANMalaysia just released the long-awaited Electric Vehicle Charging Bay (EVCB) rules with approval from The Fire and Rescue Department of Malaysia (FRDM). The 74 page document outlines in detail every last criterion that CPOs and building owners, both new and old, must follow. You can view the document in detail HERE.
As the title reads, all EVCB must now be equipped with Vehicle Fire Blanket (VFB), which is one of the mandated standards. According to the table below, the quantity of VFB would vary depending on how many EVCB were made available, ranging from 1 VFB for 1 EVCB to up to 3 VFB for 11 to 15 EVCB.
-full_normal.jpg)
Now let's pause here for a bit, as simple as the VFB might sound, it is surely not a cheap investment. Say a proper Bridgehill single use VFB would set you back RM10,600 per piece. The more economical option would be the Bridgehill reusable VFB that cost RM24,000 but is reusable for up to 30 EV fires.
-full.jpg)
-full.jpg)
The question is who is to bear this cost? From the PLANMalaysia Guidelines it would seem this responsibility falls on the CPO’s. Are the CPO’s ready to pump in more funding to meet these guidelines after already invested into setting up the EVCB? Having spoken to a few in the space, what we can tell is that not many are prepared for this as profits from all their EV charging station investment would only be realised “hopefully” in a decade as the EV space flourishes.
Now the next question, what about existing private residential building parking bays which are not operated by CPOs. There are quite a few residential buildings where its owners have managed to install personal AC chargers at their multistory parking lots. These chargers are not operated by any CPOs and are not mentioned in PLANMalaysia EVCB Guidelines.
-full.jpg)
-full.jpg)
Even though the management had granted the go-ahead for this private EV charger installation, we're not sure who will foot the bill for the VFB purchase, which we're sure will be necessary. Given that this EV charging installation is not for public use, it is obvious that it cannot come from the management fund. Are EV owners therefore forced to buy their own VFB?
Hopefully the relevant departments would step forward and address this matter swiftly to ensure the already slow progress of EV Charger deployment does not suffer a setback, 10,000 EV charger by 2025 is still high in the radar and the “rakyat” is watching.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQR1673
SELANGOR
BSN4672
JOHOR
JYT4623
PULAU PINANG
PSA6564
PERAK
APG1321
PAHANG
CFF8472
KEDAH
KGE8312
NEGERI SEMBILAN
NEJ8142
KOTA KINABALU
SJQ8650
KUCHING
QAB4273N
Last updated 19 Mar, 2026
Fuel Price
Petrol
RON 95
RM 2.59
+0.05
RON 97
RM 3.15
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.04
+0.05
EURO 5 B7
RM 3.24
+0.05
Last updated 26 Feb, 2026
Related News
EV Stakeholders to Govt: Focus on Chargers, Not App
Rushing EV charging app unification could raise costs and stall innovation says EV owners, especially as 2026 sales remain unpredictable.
27-03-2025
Unified EV Charging App: Will CPOs Raise EV Charging Prices?
Will Malaysia’s push for a single EV charging app lead to higher costs for operators and drivers?
26-03-2025
Johor’s Green Vision: 15,840 EVs and 1,245 Stations by 2030
Johor sets its sights on a greener future, aiming to have 15,840 EVs, 1,245 charging stations and expanded renewable energy by 2030.
13-02-2025
EV Ownership Insight By BMW Malaysia & MyZEVA
BMW Malaysia and MyZEVA have shared data on EV adoption in Malaysia, highlighting the critical role of charging infrastructure growth in accelerating this shift.
19-09-2024
Local Council & Other Rules Hinder EV Adoption Amongst High-Rise Dwellers!
CPOs and high-rise residents are shying away from EV Charging Station installation due to unfair rules from local councils amongst others.
02-04-2024
1,430 EVCB Now Online - MEVnet Dashboard Now Open To Public!
MGTC, PLANMalaysia, and the Ministry of Local Government Development launches the Malaysia Electric Vehicle Charging Network (MEVnet) dashboard to the general public
02-11-2023
CPOs Given Two-Years To Registration All Functioning EV Charging Bay!
Minister of Local Government Development, has established a two-year window for charger point operators (CPO) to submit requests to local authorities for already-installed, fully functional electric vehicle charging bays (EVCBs)
13-10-2023
Low Cost Housing Dwellers, Where Do They Stand In The EV Movement Context!
Low cost flats and PPR housing projects, has anyone even looked at the situation there in the context of EV adoption?
24-02-2023
Latest News
1,800 Owners Later: The 'Built-to-Play' Formula Behind iCaur’s Success
With 1,800 units on Malaysian roads, iCaur is a 2026 breakout. We audit the iCaur 03 & V23 technical architecture, off-road geometry, and the V2L advantage.
19-03-2026
Proton e.MAS Owner’s Checklist for a Cheaper Raya Journey
Save 25% on EV charging this Raya! Check out the Proton e.MAS Balik Kampung checklist, including free inspections, RM50 vouchers, and 4,300+ charging points.
18-03-2026
Forget Dealerships: Why BYD’s New Heritage Mansion in Penang is the Future of Car Shopping
Is this the end of the glass-box dealership? Explore BYD Mansion Macalister in Penang, Malaysia’s first heritage-concept EV showroom. DC charging, boutique lounges, and 100 years of history.
17-03-2026
Updated 2026: Top 10 CPOs In Malaysia
Who is really winning the EV race? Our 2026 Malaysia EV Power Rankings reveal how private CPOs like ChargeSini and ChargeEV are out-scaling energy giants. Discover the Top 10 operators, growth data, and the rise of DC fast charging.
12-03-2026
From Zeekr 7X to GWM WEY G9: Inside Siti Nurhaliza’s Growing Collection of High-Tech ‘New Energy’ Vehicles
GWM Malaysia officially handed over the first locally assembled GWM WEY G9 Hi4 PHEV to national icon Dato’ Sri Siti Nurhaliza.
11-03-2026
Get 6-8 Months of Free 'Fuel' with the Proton e.MAS 5 Raya Rebate
If you have been eyeing Malaysia’s best-selling electric vehicle, your window for a "festive bonus" is closing. PRO-NET has officially announced a RM500 Raya Rebate for the Proton e.MAS 5.
10-03-2026
5 Reasons Why the New Penchala Link Charging Hub is a Win for Damansara EV Owners
If you’re an EV owner living in Damansara or commuting via the Kerinchi Link, your daily drive just got a major upgrade.
06-03-2026
Polestar Plans to Launch Four New Models by 2028, Polestar 4 Estate Teased
Polestar is planning to launch four new models by 2028, including the teased estate version of the Polestar 4.
19-02-2026
Show More
trending_flat

