ENZHMS
Link Copiedcheck_circle
Auto News

Johor-Singapore RTS Link On Track For Completion In 2026 - Loke

Anis

29-3-2023

Share via

According to Transport Minister Anthony Loke, the Johor Baru-Singapore Rapid Transit System (RTS) Link will be completed by the end of 2026. "There have been some delays previously, but MRT Corp is correcting them, and we will do everything possible to ensure it is completed on time." "It's going well, and we're on track." I am being briefed on the progress on a regular basis, and I have also given them strict instructions to stick to the schedule. "We are fully committed to that bilateral agreement," Loke added.




Singapore Transport Minister S. Iswaran stated on Friday that the RTS Link construction was progressing well, with 45% of the work on its side completed. He called the new link "an important addition" to the existing road connectivity between Singapore and Malaysia, and said construction is on schedule to be completed by the end of 2026. Once the 4km-RTS Link is completed, passengers will be able to travel in about five minutes from the Bukit Chagar station in Johor Baru to the Woodlands North station, and vice versa. In each direction, the train service can carry up to 10,000 passengers per hour. Meanwhile, Loke stated that the Federal Government has no intention of increasing the RM20 Road Charge (RC) imposed on foreign-registered vehicles entering Malaysia through Johor.


"Any charges we impose will be reciprocated by the Singapore government; if we raise the RC, they will raise the entry fee for Malaysian-registered vehicles as well." "This is something we have to think about, but there are no such plans right now," he said, adding that the government encourages Singaporeans to visit Malaysia, particularly Johor. He was asked to comment on the matter after Kota Iskandar assemblyman Datuk Pandak Ahmad suggested in the state assembly on March 21 that the RM20 fee be increased because it was "too low" after conversion.


Gallery

Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

JPJ Running Numbers

KUALA LUMPUR

VPC2400

SELANGOR

BSE4712

JOHOR

JXW5646

PULAU PINANG

PRQ3764

PERAK

ANV3840

PAHANG

CFB6725

KEDAH

KGA4353

NEGERI SEMBILAN

NEF7297

KOTA KINABALU

SJK7527

KUCHING

QAB3146L

Last updated 04 May, 2025

Fuel Price

Petrol

RON 95

RM 2.05

RON 97

RM 3.18

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.88

EURO 5 B7

RM 3.08

Last updated 01 May, 2025

Related News

Auto News
Johor On Track To Become Major Rail Hub In Malaysia

Johor On Track To Become Major Rail Hub In Malaysia

Johor is set to become a major rail hub in Malaysia underpinned by ongoing rail developments.

24-03-2025
Auto News
QR Codes Coming for Drivers at Johor Checkpoints

QR Codes Coming for Drivers at Johor Checkpoints

Malaysia plans to expand QR code immigration clearance to car drivers, aiming to ease congestion at border checkpoints.

04-03-2025
Auto News
JB-SG RTS Link Fares Will Consider Currency Exchange

JB-SG RTS Link Fares Will Consider Currency Exchange

RTS Link ticket fares will be finalized by January 2027, considering factors like Malaysia-Singapore exchange rates.

27-02-2025
Auto News
Govt Calls For Bids For Elevated ART In JB

Govt Calls For Bids For Elevated ART In JB

Public-Private Partnership Unit (UKAS) will soon be initiating the process of soliciting proposals for ART in JB.

14-02-2025
Auto News
RTS Link 95% Complete, Service Operation Dec 2026

RTS Link 95% Complete, Service Operation Dec 2026

The Johor Bahru-Singapore RTS is 95% complete as of last November.

13-12-2024
Auto News
Loke: RTS Link 83% Complete & On Schedule For 2027 Operation

Loke: RTS Link 83% Complete & On Schedule For 2027 Operation

Loke recently announced that the RTS Link is 83% complete, with ongoing efforts to mitigate traffic congestion in the surrounding area.

22-08-2024
Auto News
Faizal: Johor ART Necessary To Minimise RTS Station Congestion

Faizal: Johor ART Necessary To Minimise RTS Station Congestion

The ART system in Johor Bahru can be an immediate solution to manage RTS Link congestion before completion of the LRT line.

13-05-2024
Auto News
MOT Mulls Adding Komuter Train Alongside RTS Link In Johor

MOT Mulls Adding Komuter Train Alongside RTS Link In Johor

MOT expresses intention to develop Komuter service in Johor alongside the RTS Link which will begin operation in 2027.

26-04-2024

Latest News

Auto News
Massive Blaze Destroys 20 Cars, Three Motorcycles At Puchong Jaya Workshop

Massive Blaze Destroys 20 Cars, Three Motorcycles At Puchong Jaya Workshop

A Saturday morning fire at a Bukit Jalil Highway workshop in Bandar Puchong Jaya destroyed three motorcycles and 20 cars.

05-05-2025
Auto News
Melaka JPJ Warns Against E-Scooters on Public Roads

Melaka JPJ Warns Against E-Scooters on Public Roads

Melaka state JPJ reaffirms e-scooters ban, will act upon and punish offenders in recent viral clip.

05-05-2025
Auto News
Direct KL-Bangkok Train Service To Return By Year-End

Direct KL-Bangkok Train Service To Return By Year-End

Malaysia and Thailand plan to bring back the direct train line from Kuala Lumpur to Bangkok by the end of 2025.

05-05-2025
Auto News
InDrive Set To Terminate Operations In Malaysia?

InDrive Set To Terminate Operations In Malaysia?

e-hailing firm InDrive reportedly sees Malaysia operations face termination by APAD for allegedly flouting its guidelines.

02-05-2025
Auto News
Continental Alor Setar Tyre Plant Closure Not Driven By Politics - Kedah MB

Continental Alor Setar Tyre Plant Closure Not Driven By Politics - Kedah MB

The closing of Continental's Alor Setar factory was solely business-driven, not political, says Kedah MB.

02-05-2025
Auto News
KTMB Reacts After Elderly Spotted Crossing KTM Tracks In Kelantan

KTMB Reacts After Elderly Spotted Crossing KTM Tracks In Kelantan

Following an incident in Kelantan where an elderly was seen crossing KTM tracks, KTMB has issued a response.

02-05-2025
Auto News
LKSA, SUKE, SILK, DASH Now Accepts Credit/Debit Cards

LKSA, SUKE, SILK, DASH Now Accepts Credit/Debit Cards

Prolintas has expanded debit and credit card payment options to four more highways: LKSA, SILK, DASH, and SUKE.

02-05-2025
Auto News
Works Minister: Tapah Smoother Now, WISE to Offer Alternative to Menora

Works Minister: Tapah Smoother Now, WISE to Offer Alternative to Menora

With the Tapah traffic project now complete, the Works Ministry eyes the upcoming WISE highway - a new alternative to the Menora Tunnel route. o

02-05-2025

Show More

trending_flat
Carz Automedia Malaysia Logo
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2024 CariCarz.com. All Rights Reserved.