Thaipusam 2024: Seven Road Closure Around Batu Caves Till 28 January
In preparation for the Thaipusam celebration, seven (7) roads in the Batu Caves area of Selangor will be closed from 10 PM, 22 January until Sunday, 28 January. This measure is implemented to alleviate traffic congestion as an estimated two million visitors are expected to gather at the Sri Subramaniar Swamy Temple in Batu Caves for the festival.
Selangor Police Chief Datuk Hussein Omar Khan announced the road closures to include:
- Routes from the intersection of Jalan Bunga Raya leading to Jalan Batu Caves
- Traffic light at Jalan Stesen (Batu Caves bypass)
- Slip road from Batu Caves roundabout (MRR2) heading to Batu Caves Temple
- Exit from Gombak (MRR2) heading to Batu Caves Temple
- Intersection at Jalan SBC8 / Jalan Lama Batu Caves
- Jalan Perusahaan heading to Batu Caves Temple
- Traffic light intersection at Sri Batu Caves heading to MRR2.
To manage the situation, motorists are advised to plan alternative routes and utilise designated parking areas. The public is encouraged to take advantage of free fares provided by Rapid KL and commuter trains on January 24 to 25, as announced by the government.
For security and coordination, a total of 1,600 policemen have been assigned to oversee the Thaipusam celebration. Static control centres have been established to provide services and facilitate police reports for visitors.
However, the use of drones in the Sri Subramaniar Swamy temple area at Batu Caves during the Thaipusam celebration is strictly prohibited. Police personnel will be stationed in the area to monitor and ensure compliance with this restriction.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPS2415
SELANGOR
BSH7411
JOHOR
JYG6315
PULAU PINANG
PRT9853
PERAK
APB2049
PAHANG
CFD4677
KEDAH
KGC2695
NEGERI SEMBILAN
NEH1085
KOTA KINABALU
SJM5851
KUCHING
QAB1588M
Last updated 15 Sep, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.18
+0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.90
+0.02
EURO 5 B7
RM 3.10
+0.02
Last updated 11 Sep, 2025
Related News
2025 PJ Half Marathon Road Closures Start Tomorrow – Aug 16
PJ Half Marathon will see multiple road closures from Saturday evening.
15-08-2025
NPE & Besraya Road Closure For IJM Allianz Duo Highway Challenge 2025
IJM Allianz Duo Highway Challenge 2025 returns with pre-dawn flag-offs and road diversions across NPE and Besraya.
30-07-2025
Tuas Second Link Closed For Chemical Spill Emergency Drill on July 23
All Malaysia-bound lanes will be shut for a cross-border chemical spill simulation from 5AM to 2PM.
22-07-2025
RTS Link: Key Road Closure in JB Until End of 2026
Jalan Johor Bahru–Endau closed for 18 months starting June 3 as RTS construction ramps up.
03-06-2025
PDRM Set For Two-Day Dry Run Ahead Of 46th ASEAN Summit
PDRM set to simulate convoy movements in KL ahead of next week’s high-level 46th ASEAN Summit meetings.
21-05-2025
Xi Jinping’s Official Visit: 17 Key Routes Affected
PDRM will enforce road closures and diversions in Klang Valley and Putrajaya from April 15 to April 17for Chinese President Xi Jinping’s official visit.
14-04-2025
14 Roads Closed in Phases for King's Installation Ceremony on Saturday - July 20
14 roads would be closed in phases to facilitate traffic flow during the King’s Installation Ceremony this Saturday, 20 July.
16-07-2024
Agong's Farewell Ceremony - 7 Roads Closed On January 30
Seven (7) routes in the nation's capital will be completely closed on Tuesday (January 30), while 13 routes will be closed gradually in conjunction with the Yang di-Pertuan Agong farewell ceremony.
29-01-2024
Latest News
GWM Wey 80 Teased Again, Now Renamed ‘Wey G9’ Instead
Upcoming GWM Wey 80 teased on social media, now bearing new ‘Wey G9’ nameplate too.
15-09-2025
Proton Iriz Production Ends – No Successor Planned, But Should There Be One?
Proton Iriz hatch production ends without a successor, leaving automaker without a new hatch model since 1994.
12-09-2025
West Ipoh Span Expressway Construction Will Begin After 2026
Construction of the West Ipoh Span Expressway is set to start after 2026, providing an alternative to the busy Menora Tunnel route.
12-09-2025
SSLR2 Highway Launched: RM7.6b Project Will Link Sarawak and Sabah
The 335km Sarawak–Sabah Link Road Phase 2 will connect key towns across northern Sarawak into Sabah.
12-09-2025
Proton: We Are Prepared To Serve New X50 After Sales In East Malaysia
Proton reassures it is more than capable of handling after sales coverage for face-lifted new X50 model in East Malaysia.
12-09-2025
PLUS: Up to 2.2 Million Vehicles Daily This Malaysia Day Weekend
PLUS expects traffic to hit 2.2 million vehicles per day on Sept 12, 13, 19 and 20,motorists urged to plan journeys with the MyPLUS-TTA app.
12-09-2025
Prasarana Rail Reliability Hits Record High, Disruptions Halved
Prasarana reports its best rail performance yet, with service reliability more than doubling since 2024.
12-09-2025
Caricarz Automall Sunday Car Market Returns Sept 21 After Strong Debut
Caricarz Automall Sunday Car Market returns Sept 21 to help owners beat lowball trade-ins with direct sales.
12-09-2025
Show More
trending_flat