Akleh, Suke Closure For AS International Half Marathon

Projek Lintasan Kota Holdings Sdn Bhd (Prolintas) announced today that the Ampang-Kuala Lumpur Elevated Highway (Akleh) and the Sungai Besi-Ulu Kelang Elevated Expressway (Suke) will be closed today (February 3) to allow for the AS International Half Marathon.
All entry and exit points of Suke, from Exit 1907 (Persimpangan Tasik Tambahan) to Exit 1914 (Persimpangan Bukit Antarabangsa), will be closed in both directions during the same period. Prolintas stated that Akleh will be completely closed to traffic from 5 p.m. tomorrow until 2 a.m. on February 4.
“Road users are advised to obey the traffic signages and follow the instructions of the traffic police at the location,” it said in a statement.
It added that road users can contact Prolintas Hotline at 1-800-22-8888 or email to [email protected] for further details.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPY1046
SELANGOR
BSJ9038
JOHOR
JYK5801
PULAU PINANG
PRV4463
PERAK
APC3184
PAHANG
CFD9713
KEDAH
KGC8517
NEGERI SEMBILAN
NEH5267
KOTA KINABALU
SJN5357
KUCHING
QAB4754M
Last updated 04 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
+0.06
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.95
+0.06
EURO 5 B7
RM 3.15
+0.06
Last updated 30 Oct, 2025
Related News
PNB Weighs RM3 Billion Sale of PROLINTAS
PNB is said to be considering a sale of its toll road operator, PROLINTAS, in a deal potentially worth RM3 billion.
16-07-2025
PROLINTAS Get RM2.7 Billion Financing For Restructuring Effort
Prolintas secures RM2.7 billion financing from Bank Pembangunan’s Tawarruq Asset Financing to aid its restructuring effort.
13-01-2024
Mercedes A-Class Lady Driver Caught For 45 Unpaid Toll At AKLEH
A Mercedes A-Class was caught for 45 accounts of unpaid toll totaling RM275.65
10-01-2023
SUKE Expressway - Alam Damai Elevated Interchange Now Open!
The Alam Damai Elevated Interchange along the Sungai Besi-Ulu Kelang Elevated Motorway (SUKE) is now open
20-10-2023
SUKE Expressway Interchange Closure - Rain Water Drain Pipe Works, 24 & 25 July
Temporary closure of the Shell Bandar Tasik Selatan interchange on MRR2 towards Sungai Besi would take place on 24 and 25 July from 11PM to 5AM during the off-peak hours for scheduled repair works of the Rain Water Drain Pipe (RWDP)
25-07-2023
SUKE Expressway Phase 2 Toll Collection Starts Today - RM2.30 For Cars
SUKE Expressway Phase 2 Toll Collection Starts Today, 30 June 2023 - RM2.30 For Cars
30-06-2023
Phase 2 Of SUKE Highway Opens At Midnight
SUKE highway Phase 2 will open to the public at midnight tonight.
15-06-2023
SUKE Route Will Be Closed From Thursday To Friday Due To Road Paving Work
The Sungai Besi - Ulu Kelang Elevated Expressway Privatization Project (SUKE) will have temporary closures from 10 p.m. to 5 a.m. on April 6th (Thursday) and 7th (Friday).
05-04-2023
Latest News
RTS Link 65% Complete, First Train Arriving This Month
RTS Link connecting JB and SG is officially 65% complete, with the first train set expected to arrive this month.
03-11-2025
Toyota Skill Contest 2025 Winners Announced
Winners for the Toyota Skill Contest 2025 organised by UMW Toyota Motor have been announced.
03-11-2025
Budi95: Only 0.6% Max Out Quota, Govt Flags Unusual Purchase Near Border
Only 0.6% hit the 300L limit under BUDI95 programme with most recipients using only about 98 litres in Oct.
03-11-2025
RM600 Million Super Magnet Plant Set to Power Malaysia’s EV Ambitions
RM600 million JS Link–Lynas investment drives Malaysia’s push in downstream REE processing for EV and clean energy sectors.
03-11-2025
Datuk Abdul Rashid Musa Returns To Proton As Deputy CEO
Datuk Abdul Rashid Musa returns to Proton as Deputy CEO, succeeding Roslan Abdullah.
03-11-2025
ETS3 To Johor Bahru Set To Roll Out by Mid-December
The ETS3 line is set to launch by mid-Dec, extending the Electric Train Service from Gemas to JB.
03-11-2025
Selangor Govt Will Decide Fate Of 19 WCE-Affected Residents
The Selangor govt is set to decide soon on the fate of 19 Kampung Jawa residents affected by the West Coast Expressway project.
03-11-2025
APAD Orders Aeroline To Halt Services Over Repeated Non-Compliance
Aeroline was directed to halt trips from Nov 6 to Dec 5 after failing to relocate to approved terminals as required by APAD.
03-11-2025
Show More
trending_flat