Abolish Gombak, Karak Toll Plazas To Alleviate Traffic Woes - Kubang Kerian MP
The government has been urged by Kubang Kerian MP Datuk Seri Tuan Ibrahim Tuan Man to think about eliminating the Gombak and Karak Toll Plazas in order to reduce traffic, especially on the East Coast Highway.
The suggestion from the opposition MP drew attention to the nation's deteriorating traffic conditions, particularly in the vicinity of toll plazas.
He stated during royal address debate in the Dewan Rakyat, "The East Coast Highway, for example, has four toll plazas that force drivers to stop: Gombak, Bentong, Karak, and the exit plazas."
Tuan Ibrahim suggested two strategies to lessen the load on drivers; entry/exit system, a system that only requires drivers to pay tolls when they enter and leave the highway.
The other strategy is to eliminate toll plazas; because the Gombak and Karak toll plazas exacerbate traffic congestion and delays, they should be completely removed.
He also urged authorities to reconsider the timing of road repairs to reduce user inconvenience.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPM4876
SELANGOR
BSG7495
JOHOR
JYE4583
PULAU PINANG
PRT719
PERAK
ANY6825
PAHANG
CFD467
KEDAH
KGB6291
NEGERI SEMBILAN
NEG6315
KOTA KINABALU
SJL9999*
KUCHING
QAB8361L
Last updated 02 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
No Plans To Abolish Karak, Gombak Tolls To Alleviate Traffic - Nanta Linggi
Works minister Datuk Seri Alexander Nanta Linggi has confirmed that the government has no plan to abolish Gombak and Karak tolls.
11-03-2024
No Plans To Abolish Karak, Gombak Tolls To Alleviate Traffic - Nanta Linggi
Works minister Datuk Seri Alexander Nanta Linggi has confirmed that the government has no plan to abolish Gombak and Karak tolls.
11-03-2024
Over 35,000 Accidents, 730 Fatalities On LPT1 Since 2004
35,551 accidents occurred on the LPT1 from 2004 to Dec 2024, resulting in 730 fatalities.
22-04-2025
AFA PRIME Bhd Issues TTA for KLK & LPT 1
AFA PRIME Bhd enhances traffic measures to ensure a smooth and safe Hari Raya Aidilfitri travel experience.
25-03-2025
TTA: 63% Traffic Surge On KLK and LPT1 Expected During CNY 2025
KLK and LPT1 expects traffic volume to increase by 63% and has issued Travel Time Advisory starting 25 Jan to 2 Feb, 2025.
23-01-2025
AFA Allocates RM2.1b For KL-Karak Highway Widening Project; Scheduled To Begin Jan 2025
AFA allocates RM2.1 billion for the KL-Karak highway widening project which is set to begin in Jan 2025.
29-11-2024
LPT3 Construction Cost Rises Three-Fold To RM9.8 Billion
LPT3 Highway Construction Cost Rises to RM9.8 Billion, Awaiting Cabinet Approval.
20-11-2024
LTU Section 5A: Raub Bypass Opens On Friday
The Section 5A: Raub Bypass of the Lingkaran Tengah Utama (LTU) Expressway opened last night, Friday, at 12:01
08-03-2024
Latest News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized
JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.
02-08-2025
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score
The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?
02-08-2025
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted
New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.
01-08-2025
Govt Looking To Revive MEX II Highway With New Completion Plan
The government is working with bondholders to restart the long-delayed MEX II Highway.
01-08-2025
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days
2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.
01-08-2025
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready
Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.
01-08-2025
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas
With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.
01-08-2025
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout
PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.
01-08-2025
Show More
trending_flat