ENZHMS
Link Copiedcheck_circle
Auto News

No Plans To Abolish Karak, Gombak Tolls To Alleviate Traffic - Nanta Linggi

Anis

Share via

Untitled-design---2024-03-11T104031.381.png

Earlier this week, PAS deputy president Datuk Seri Tuan Ibrahim Tuan Man proposed that the government close the Gombak and Karak toll plazas on the Kuala Lumpur-Karak Expressway (KLK) and East Coast Expressway (ECE) to alleviate highway congestion.

The opposition lawmaker suggested two strategies to lessen the load on drivers; entry/exit system, a system that only requires drivers to pay tolls when they enter and leave the highway.

However, works minister Datuk Seri Alexander Nanta Linggi has rejected the proposal, according to the New Straits Times.

Speaking at the opening of section 5 of the Raub bypass on the Central Spine Road (CSR) yesterday, Nanta Linggi stated that abolishing tolls on the Karak and ECE highways would result in higher road maintenance costs, which the government would bear. FW1047361_KL18_16052020_TINJAUAN-lpr.jpg


“At the moment, we have no plans to abolish the tolls,” he said. “We need the [toll] funds for highway maintenance and to ensure the safety of road users. If the tolls are abolished, the government will have to secure funds to maintain the highway and plan maintenance works. A lack of funds will jeopardise [maintaining the highways].”

Apart from confirming that the government does not intend to shut down the previously mentioned toll plazas, Nanta Linggi added that there have been no conversations about putting in place an open payment toll collection system on the Karak highway.

“Open payment has not been discussed. Open payment on the KLK needs to be studied, and if there is a need, it has to be fine-tuned," he added.

Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

JPJ Running Numbers

KUALA LUMPUR

VPM4921

SELANGOR

BSG7503

JOHOR

JYE4625

PULAU PINANG

PRT785

PERAK

ANY6891

PAHANG

CFD485

KEDAH

KGB6356

NEGERI SEMBILAN

NEG6323

KOTA KINABALU

SJL9999*

KUCHING

QAB8364L

Last updated 04 Aug, 2025

Fuel Price

Petrol

RON 95

RM 2.05

RON 97

RM 3.17

-0.04

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.91

EURO 5 B7

RM 3.11

Last updated 31 Jul, 2025

Related News

Auto News
Kuantan-Bound KL-Karak Lanes Diverted For ECRL Work Until Aug 31

Kuantan-Bound KL-Karak Lanes Diverted For ECRL Work Until Aug 31

Kuantan-bound lanes (KM25.75–KM26.39) are being diverted for ECRL works until Aug 31.

10-07-2025
Auto News
KL-Karak Highway Expansion Project Set to Begin in Q2 2025

KL-Karak Highway Expansion Project Set to Begin in Q2 2025

AFA Prime Berhad announces that the KL-Karak highway expansion project is set to commence in Q2 2025.

20-05-2025
Auto News
TTA: 63% Traffic Surge On KLK and LPT1 Expected During CNY 2025

TTA: 63% Traffic Surge On KLK and LPT1 Expected During CNY 2025

KLK and LPT1 expects traffic volume to increase by 63% and has issued Travel Time Advisory starting 25 Jan to 2 Feb, 2025.

Auto News
KL-Karak Highway Tolls Now Accept Debit and Credit Cards

KL-Karak Highway Tolls Now Accept Debit and Credit Cards

KL-Karak Highway tolls now accept debit and credit card payments at its Gombak and Bentong Plazas.

Auto News
AFA Allocates RM2.1b For KL-Karak Highway Widening Project; Scheduled To Begin Jan 2025

AFA Allocates RM2.1b For KL-Karak Highway Widening Project; Scheduled To Begin Jan 2025

AFA allocates RM2.1 billion for the KL-Karak highway widening project which is set to begin in Jan 2025.

29-11-2024
Auto News
KL-Karak Highway Road Widening Set to Begin in Jan 2025

KL-Karak Highway Road Widening Set to Begin in Jan 2025

KL-Karak Highway road widening exercise to begin in Jan 2025 at the cost of RM2.1 Billion.

Auto News
Smart Lane Not Implemented on KLK Due to Hilly Conditions – KKR

Smart Lane Not Implemented on KLK Due to Hilly Conditions – KKR

Works Minister says that Smart Lanes cannot be implemented on the KL-Karak highway due to its hilly conditions.

30-07-2024
Auto News
KL-Karak Highway Widening Project Starts This Year

KL-Karak Highway Widening Project Starts This Year

The federal government has approved a project to widen the Kuala Lumpur-Karak Expressway as a means of reducing traffic congestion.

02-02-2024

Latest News

Auto News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized

JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized

JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.

Auto News
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score

Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score

The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?

02-08-2025
Auto News
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.

01-08-2025
Auto News
Govt Looking To Revive MEX II Highway With New Completion Plan

Govt Looking To Revive MEX II Highway With New Completion Plan

The government is working with bondholders to restart the long-delayed MEX II Highway.

01-08-2025
Auto News
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.

01-08-2025
Auto News
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.

01-08-2025
Auto News
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.

Auto News
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.

Show More

trending_flat
Carz Automedia Malaysia Logo
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.