No Plans To Abolish Karak, Gombak Tolls To Alleviate Traffic - Nanta Linggi

Earlier this week, PAS deputy president Datuk Seri Tuan Ibrahim Tuan Man proposed that the government close the Gombak and Karak toll plazas on the Kuala Lumpur-Karak Expressway (KLK) and East Coast Expressway (ECE) to alleviate highway congestion.
The opposition lawmaker suggested two strategies to lessen the load on drivers; entry/exit system, a system that only requires drivers to pay tolls when they enter and leave the highway.
However, works minister Datuk Seri Alexander Nanta Linggi has rejected the proposal, according to the New Straits Times.
Speaking at the opening of section 5 of the Raub bypass on the Central Spine Road (CSR) yesterday, Nanta Linggi stated that abolishing tolls on the Karak and ECE highways would result in higher road maintenance costs, which the government would bear.
“At the moment, we have no plans to abolish the tolls,” he said. “We need the [toll] funds for highway maintenance and to ensure the safety of road users. If the tolls are abolished, the government will have to secure funds to maintain the highway and plan maintenance works. A lack of funds will jeopardise [maintaining the highways].”
Apart from confirming that the government does not intend to shut down the previously mentioned toll plazas, Nanta Linggi added that there have been no conversations about putting in place an open payment toll collection system on the Karak highway.
“Open payment has not been discussed. Open payment on the KLK needs to be studied, and if there is a need, it has to be fine-tuned," he added.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPY1081
SELANGOR
BSJ9047
JOHOR
JYK5822
PULAU PINANG
PRV4467
PERAK
APC3190
PAHANG
CFD9715
KEDAH
KGC8518
NEGERI SEMBILAN
NEH5271
KOTA KINABALU
SJN5372
KUCHING
QAB4760M
Last updated 04 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
+0.06
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.95
+0.06
EURO 5 B7
RM 3.15
+0.06
Last updated 30 Oct, 2025
Related News
Kuantan-Bound KL-Karak Lanes Diverted For ECRL Work Until Aug 31
Kuantan-bound lanes (KM25.75–KM26.39) are being diverted for ECRL works until Aug 31.
10-07-2025
KL-Karak Highway Expansion Project Set to Begin in Q2 2025
AFA Prime Berhad announces that the KL-Karak highway expansion project is set to commence in Q2 2025.
20-05-2025
TTA: 63% Traffic Surge On KLK and LPT1 Expected During CNY 2025
KLK and LPT1 expects traffic volume to increase by 63% and has issued Travel Time Advisory starting 25 Jan to 2 Feb, 2025.
23-01-2025
KL-Karak Highway Tolls Now Accept Debit and Credit Cards
KL-Karak Highway tolls now accept debit and credit card payments at its Gombak and Bentong Plazas.
03-01-2025
AFA Allocates RM2.1b For KL-Karak Highway Widening Project; Scheduled To Begin Jan 2025
AFA allocates RM2.1 billion for the KL-Karak highway widening project which is set to begin in Jan 2025.
29-11-2024
KL-Karak Highway Road Widening Set to Begin in Jan 2025
KL-Karak Highway road widening exercise to begin in Jan 2025 at the cost of RM2.1 Billion.
04-11-2024
Smart Lane Not Implemented on KLK Due to Hilly Conditions – KKR
Works Minister says that Smart Lanes cannot be implemented on the KL-Karak highway due to its hilly conditions.
30-07-2024
KL-Karak Highway Widening Project Starts This Year
The federal government has approved a project to widen the Kuala Lumpur-Karak Expressway as a means of reducing traffic congestion.
02-02-2024
Latest News
BUDI95: Fuel Quota For E-Hailing Drivers Raised To 800 Litres
The govt has approved an 800-litre monthly RON95 quota for full-time e-hailing drivers under BUDI95.
04-11-2025
Zeekr X, MG MGS5 EV Earn 5-Star ASEAN NCAP Ratings
Zeekr X tops ASEAN NCAP with 94.64 points, while MG MGS5 EV trails closely at 92.39 points.
04-11-2025
New Audit Move To Keep Highway Concessionaires In Check
Works Ministry will introduce independent audits for highway concessionaires in early 2026.
04-11-2025
BAS.MY Pass Now At RM30 Monthly for Unlimited Bus Rides
BAS.MY services now cost just RM1 a day as the government reduces the 30-day Unlimited Travel Pass from RM50 to RM30.
04-11-2025
RTS Link 65% Complete, First Train Arriving This Month
RTS Link connecting JB and SG is officially 65% complete, with the first train set expected to arrive this month.
03-11-2025
Toyota Skill Contest 2025 Winners Announced
Winners for the Toyota Skill Contest 2025 organised by UMW Toyota Motor have been announced.
03-11-2025
Budi95: Only 0.6% Max Out Quota, Govt Flags Unusual Purchase Near Border
Only 0.6% hit the 300L limit under BUDI95 programme with most recipients using only about 98 litres in Oct.
03-11-2025
RM600 Million Super Magnet Plant Set to Power Malaysia’s EV Ambitions
RM600 million JS Link–Lynas investment drives Malaysia’s push in downstream REE processing for EV and clean energy sectors.
03-11-2025
Show More
trending_flat