ART Trackless Trams Trial Run In Putrajaya Till 31 July - Free Rides Offered
Putrajaya Corporation (PPj), in partnership with the Ministry of Transport (MOT), is running a free trial of the Automated Rapid Transit (ART) trackless tram till July 31. If successful, the ART tram service, which uses CRRC technology from China, will begin operations permanently by end of this year.
Muhammad Masrizal Saad, an engineer from the PPj Engineering and Maintenance Department (Traffic and Public Transport Division), indicated that the tram will travel on two routes throughout the testing. Route 1 will run Monday through Friday, while Route 2 will operate on Saturdays and Sundays.
"Route 1 starts at the Putrajaya Sentral MRT station and runs through the government administrative areas of Precincts 2, 3, and 4. Meanwhile, Route 2 begins at Putrajaya Sentral MRT Station and continues to IOI City Mall," he stated at a recent media event.
Masrizal further stated that the electric tram can handle up to 307 passengers at once, and that rides are free during the testing period. However, passengers must scan the QR codes provided at the pick-up points.
Source: BERNAMA
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPM4900
SELANGOR
BSG7498
JOHOR
JYE4605
PULAU PINANG
PRT744
PERAK
ANY6854
PAHANG
CFD479
KEDAH
KGB6308
NEGERI SEMBILAN
NEG6323
KOTA KINABALU
SJL9999*
KUCHING
QAB8364L
Last updated 03 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
Kuching Urban Transportation System Anticipated To Commence In 2028
Full operation of the Kuching Urban Transport System (KUTS) project is expected to commence in 2028.
21-05-2025
Faizal: Johor ART Necessary To Minimise RTS Station Congestion
The ART system in Johor Bahru can be an immediate solution to manage RTS Link congestion before completion of the LRT line.
13-05-2024
Johor State Govt Mulls ART System Alongside RTS Link
The Johor state government proposes the implementation of the ART system to combat congestion alongside the RTS Link.
10-05-2024
Sarawak Set To Become Asia's First Hydrogen-Powered Economy!
Sarawak to begin large-scale commercial production of green hydrogen by 2027 to promote renewable energy and minimise the region's carbon footprint.
13-06-2023
Sarawak State Govt. To Endorse Hydrogen-Powered ART Vehicles Including Buses
Sarawak state government has announced its plans to promote hydrogen-powered public vehicles among locals.
23-03-2023
Latest News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized
JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.
02-08-2025
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score
The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?
02-08-2025
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted
New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.
01-08-2025
Govt Looking To Revive MEX II Highway With New Completion Plan
The government is working with bondholders to restart the long-delayed MEX II Highway.
01-08-2025
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days
2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.
01-08-2025
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready
Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.
01-08-2025
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas
With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.
01-08-2025
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout
PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.
01-08-2025
Show More
trending_flat