ART Trackless Trams Trial Run In Putrajaya Till 31 July - Free Rides Offered
-full_normal.jpg)
Putrajaya Corporation (PPj), in partnership with the Ministry of Transport (MOT), is running a free trial of the Automated Rapid Transit (ART) trackless tram till July 31. If successful, the ART tram service, which uses CRRC technology from China, will begin operations permanently by end of this year.
-full_normal.jpg)
Muhammad Masrizal Saad, an engineer from the PPj Engineering and Maintenance Department (Traffic and Public Transport Division), indicated that the tram will travel on two routes throughout the testing. Route 1 will run Monday through Friday, while Route 2 will operate on Saturdays and Sundays.
"Route 1 starts at the Putrajaya Sentral MRT station and runs through the government administrative areas of Precincts 2, 3, and 4. Meanwhile, Route 2 begins at Putrajaya Sentral MRT Station and continues to IOI City Mall," he stated at a recent media event.
-full_normal.jpg)
Masrizal further stated that the electric tram can handle up to 307 passengers at once, and that rides are free during the testing period. However, passengers must scan the QR codes provided at the pick-up points.
Source: BERNAMA
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPY1794
SELANGOR
BSJ9264
JOHOR
JYK6086
PULAU PINANG
PRV4604
PERAK
APC3364
PAHANG
CFD9785
KEDAH
KGC8584
NEGERI SEMBILAN
NEH5316
KOTA KINABALU
SJN5462
KUCHING
QAB4781M
Last updated 04 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
+0.06
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.95
+0.06
EURO 5 B7
RM 3.15
+0.06
Last updated 30 Oct, 2025
Related News
Kuching Urban Transportation System Anticipated To Commence In 2028
Full operation of the Kuching Urban Transport System (KUTS) project is expected to commence in 2028.
21-05-2025
Faizal: Johor ART Necessary To Minimise RTS Station Congestion
The ART system in Johor Bahru can be an immediate solution to manage RTS Link congestion before completion of the LRT line.
13-05-2024
Johor State Govt Mulls ART System Alongside RTS Link
The Johor state government proposes the implementation of the ART system to combat congestion alongside the RTS Link.
10-05-2024
Sarawak Set To Become Asia's First Hydrogen-Powered Economy!
Sarawak to begin large-scale commercial production of green hydrogen by 2027 to promote renewable energy and minimise the region's carbon footprint.
13-06-2023
Sarawak State Govt. To Endorse Hydrogen-Powered ART Vehicles Including Buses
Sarawak state government has announced its plans to promote hydrogen-powered public vehicles among locals.
23-03-2023
Latest News
Touch ‘n Go Announces Titan Flow Multi-Lane Fast Flow Platform
In conjunction with MyARTTE 2025, Touch ‘n Go introduces its own multi-lane fast flow platform known as Titan Flow.
04-11-2025
BUDI95: Fuel Quota For E-Hailing Drivers Raised To 800 Litres
The govt has approved an 800-litre monthly RON95 quota for full-time e-hailing drivers under BUDI95.
04-11-2025
Zeekr X, MG MGS5 EV Earn 5-Star ASEAN NCAP Ratings
Zeekr X tops ASEAN NCAP with 94.64 points, while MG MGS5 EV trails closely at 92.39 points.
04-11-2025
New Audit Move To Keep Highway Concessionaires In Check
Works Ministry will introduce independent audits for highway concessionaires in early 2026.
04-11-2025
BAS.MY Pass Now At RM30 Monthly for Unlimited Bus Rides
BAS.MY services now cost just RM1 a day as the government reduces the 30-day Unlimited Travel Pass from RM50 to RM30.
04-11-2025
RTS Link 65% Complete, First Train Arriving This Month
RTS Link connecting JB and SG is officially 65% complete, with the first train set expected to arrive this month.
03-11-2025
Toyota Skill Contest 2025 Winners Announced
Winners for the Toyota Skill Contest 2025 organised by UMW Toyota Motor have been announced.
03-11-2025
Budi95: Only 0.6% Max Out Quota, Govt Flags Unusual Purchase Near Border
Only 0.6% hit the 300L limit under BUDI95 programme with most recipients using only about 98 litres in Oct.
03-11-2025
Show More
trending_flat