Faizal: Johor ART Necessary To Minimise RTS Station Congestion
-full_normal.webp)
Transport, Infrastructure, and Communications state executive councillor Mohamad Fazli Mohamad Salleh disclosed that the estimated cost for implementing Light Rail Transit (LRT) infrastructure in Johor stands at RM16.7 billion. This contrasts greatly against the RM7 billion quoted to develop the Autonomous Rapid Transit (ART) infrastructure.
This valuation stemmed from a meticulous analysis comparing the two systems, prompted by presentations from two consortiums advocating for their respective LRT and ART public transport proposals.
-full_normal.webp)
Mohamad Fazli highlighted specific requirements for the LRT system, including the need for a new design for its elevated segments and approval for the railway scheme. Moreover, he noted the infrastructure demands for depots and LRT stations, which entail acquiring land for the Desa Jaya depot and five acres for track switching/shunting.
Mohamad Fazli also went on to mention that a special committee convened twice since Dec 2023 to assess analysis outcomes and recommendations, including presentations from consortia proposing LRT and ART systems.
-full_normal.webp)
-full_normal.webp)
This committee consists of representatives from the Ministry of Economy, Ministry of Transport (MOT), Ministry of Finance (MoF), Public Private Partnership Unit (UKAS), and Johor State Economic Planning Division (BPENJ).
He also went on to emphasise that the government’s priority is to have a transport system completed by the end of Dec 2026, coinciding with the commencement of Rapid Transit System (RTS) operations linking Bukit Chagar to Woodlands, Singapore.
Additionally, he also warned of potential congestion at Bukit Chagar RTS Station if the ART/LRT passenger dispersal service isn't operational in sync with RTS operations as the previous Bus Rapid Transit (BRT) system had been cancelled by the federal government.
Source: BERNAMA
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPY1794
SELANGOR
BSJ9264
JOHOR
JYK6086
PULAU PINANG
PRV4604
PERAK
APC3364
PAHANG
CFD9785
KEDAH
KGC8584
NEGERI SEMBILAN
NEH5316
KOTA KINABALU
SJN5462
KUCHING
QAB4781M
Last updated 04 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
+0.06
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.95
+0.06
EURO 5 B7
RM 3.15
+0.06
Last updated 30 Oct, 2025
Related News
Kuching Urban Transportation System Anticipated To Commence In 2028
Full operation of the Kuching Urban Transport System (KUTS) project is expected to commence in 2028.
21-05-2025
ART Trackless Trams Trial Run In Putrajaya Till 31 July - Free Rides Offered
PPj and MOT begin ART Trackless Tram trail run till July 31, and free rides are offered to gauge public reception.
23-05-2024
Johor State Govt Mulls ART System Alongside RTS Link
The Johor state government proposes the implementation of the ART system to combat congestion alongside the RTS Link.
10-05-2024
Sarawak Set To Become Asia's First Hydrogen-Powered Economy!
Sarawak to begin large-scale commercial production of green hydrogen by 2027 to promote renewable energy and minimise the region's carbon footprint.
13-06-2023
Sarawak State Govt. To Endorse Hydrogen-Powered ART Vehicles Including Buses
Sarawak state government has announced its plans to promote hydrogen-powered public vehicles among locals.
23-03-2023
Johor State Govt Mulls ART System Alongside RTS Link
The Johor state government proposes the implementation of the ART system to combat congestion alongside the RTS Link.
10-05-2024
RTS Link 65% Complete, First Train Arriving This Month
RTS Link connecting JB and SG is officially 65% complete, with the first train set expected to arrive this month.
03-11-2025
Second RTS Link Train To Arrive At Wadi Hana Depot By End-September
The second RTS train set is heading to Johor Bahru for on-site testing, keeping the rail project on track for 2027 launch.
17-09-2025
Latest News
Touch ‘n Go Announces Titan Flow Multi-Lane Fast Flow Platform
In conjunction with MyARTTE 2025, Touch ‘n Go introduces its own multi-lane fast flow platform known as Titan Flow.
04-11-2025
BUDI95: Fuel Quota For E-Hailing Drivers Raised To 800 Litres
The govt has approved an 800-litre monthly RON95 quota for full-time e-hailing drivers under BUDI95.
04-11-2025
Zeekr X, MG MGS5 EV Earn 5-Star ASEAN NCAP Ratings
Zeekr X tops ASEAN NCAP with 94.64 points, while MG MGS5 EV trails closely at 92.39 points.
04-11-2025
New Audit Move To Keep Highway Concessionaires In Check
Works Ministry will introduce independent audits for highway concessionaires in early 2026.
04-11-2025
BAS.MY Pass Now At RM30 Monthly for Unlimited Bus Rides
BAS.MY services now cost just RM1 a day as the government reduces the 30-day Unlimited Travel Pass from RM50 to RM30.
04-11-2025
RTS Link 65% Complete, First Train Arriving This Month
RTS Link connecting JB and SG is officially 65% complete, with the first train set expected to arrive this month.
03-11-2025
Toyota Skill Contest 2025 Winners Announced
Winners for the Toyota Skill Contest 2025 organised by UMW Toyota Motor have been announced.
03-11-2025
Budi95: Only 0.6% Max Out Quota, Govt Flags Unusual Purchase Near Border
Only 0.6% hit the 300L limit under BUDI95 programme with most recipients using only about 98 litres in Oct.
03-11-2025
Show More
trending_flat