ChargeSini: Key Challenges in EV Adoption, Insights from CEO James Goh

The New Industrial Master Plan 2030 (NIMP2030) aims to propel the nation's EV industry forward. It targets substantial EV investments to achieve a 15% total industry volume (TIV) for electric and hybrid vehicles by 2030, escalating to 38% TIV by 2040.
The plan also sets an ambitious goal of establishing 10,000 public charging stations by 2025, ultimately striving for carbon neutrality by 2050. However, as the country works towards these goals and sees growing interest and investment in electric vehicles (EVs), their widespread adoption remains sluggish.

To get a better picture of the scene from the eyes of a charge point operator (CPO), CariCarz.com spoke with James Goh, CEO of ChargeSini, to shed light on the underlying factors affecting EV uptake and the company's strategic efforts to address these challenges.
The Real Roadblocks to EV Adoption
One of the critical obstacles hindering EV adoption is the insufficient availability of charging facilities. While the high cost of EVs and low petrol prices are often cited as barriers, James emphasised that the primary issue is the lack of convenient and accessible charging infrastructure. Even if EV prices drop and petrol prices rise, adoption will remain slow unless charging stations are widespread and easily accessible.

The Five Essential Charging Locations
EV adoption to accelerate, James highlighted five key areas where CPOs need to focus their EV charging facilities roll-out:
1. Residential Areas (Landed, Condo, and Apartment)
2. Workplaces
3. Leisure and Recreational Locations
4. Travel Routes (Highways and B Roads)
5. Public Spaces (Religious Venues, Parks, Streets)

Focus on High-Rise Buildings
With a population of 9 million in Selangor and Kuala Lumpur and about 5.8 million high-rise units, approximately 75% of residents live in high-rise buildings. Many of these residents face challenges convincing building management to install EV chargers. ChargeSini, according to James, is focusing its efforts on rolling out chargers in these high-rise buildings to support potential EV adopters.
Currently, most EV owners who are also landed property residents do not rely heavily on public charging facilities, resulting in low revenue for Charge Point Operators (CPOs). This scenario creates a vicious cycle where low public charger usage discourages further investment from CPOs in charging infrastructure roll-out, thus slowing overall EV adoption.

Overcoming Building Management Resistance
Many condos that are willing to install EV chargers only allow a maximum of four bays. This limitation leads to significant problems, especially since most Chinese EVs come equipped with around 60 kWh battery capacity but only accept 7kW AC charging. This results in each car taking 5 to 8 hours to charge, reducing the availability of chargers for other users as EV numbers grow.
Strategic Roll-Out for Enhanced EV Adoption
The key to overcoming these challenges is ensuring a balanced rollout of charging facilities across the five essential areas mentioned. This approach will boost consumer confidence and drive EV sales.


ChargeSini aims to address this matter by offering cost-free, zero-capex charging solutions with profit-sharing models to incentivize property managers and local authorities to allocate the space needed to install EV chargers at no cost to them.
Policy and Regulatory Support
Additionally, relaxing the stringent regulations and reducing the costs imposed by government bodies and local councils on CPOs are crucial steps. These measures will help create a more favourable environment for the expansion of EV charging infrastructure.
The Importance of AC Chargers in Urban Areas
Despite the allure of DC fast chargers, data shows that most urban charging occurs at AC locations due to lower costs, battery preservation, and the lack of urgency in charging. DC chargers are most beneficial for quick turnaround needs, such as for e-hailing services in city areas and for interstate travels at highway laybys.

ChargeSini's Strategic Focus
ChargeSini, says James, is prioritising the installation of AC and low-power DC chargers in high-rise buildings and public spaces. This strategy aligns with the practical charging needs of most EV users and will help accelerate the overall adoption of EVs in major cities.
Presently, ChargeSini has installed chargers in 151 condos and high-rise buildings, with more slated in the pipeline. This focused effort is expected to play a significant role in overcoming the current hurdles and driving the transition towards a more electric future.

By addressing these critical infrastructure challenges and supporting regulatory changes, ChargeSini aims to make EV adoption a more viable and attractive option for residents in Selangor, Kuala Lumpur, and beyond.
Gallery
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQH394
SELANGOR
BSL5310
JOHOR
JYP4504
PULAU PINANG
PRX4547
PERAK
APD9636
PAHANG
CFE7094
KEDAH
KGD7389
NEGERI SEMBILAN
NEJ2367
KOTA KINABALU
SJP6731
KUCHING
QAB9843M
Last updated 09 Jan, 2026
Fuel Price
Petrol
RON 95
RM 2.54
-0.02
RON 97
RM 3.11
-0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.89
-0.05
EURO 5 B7
RM 3.09
-0.05
Last updated 08 Jan, 2026
Related News
No Rush, ChargeSini Extends Idle Grace Period to 30 Minutes
ChargeSini now gives EV users up to 30 minutes after charging ends before idle fees apply, offering more flexibility in busy areas.
04-11-2025
Meta Bright, ChargeSini JV to Fast-Track EV Charger Rollout
Meta Bright teams up with ChargeSini to scale EV charging infrastructure nationwide.
12-07-2025
Meta Bright Aligns with ChargeHere in Green Energy Push
Meta Bright and ChargeHere teams up, jointly seeking to accelerate EV charging infrastructure in Malaysia.
23-05-2025
PRO-NET Partners ChargeSini,Other CPOs, For EV Charging At Condos
PRO-NET partners ChargeSini and other leading CPOs to bring affordable, convenient EV charging to over 1,000 high-rises across Malaysia.
07-05-2025
Penang Eyes 600 EVCBs This Year, Includes New ChargeSini DCFC
Penang state government targets to establish 600 EV charging bays by this year, includes new ChargeSini DCFC too.
13-03-2025
ChargeSini Partners UNITEN & Kevin Lab - Public EV Charger Usage Data Sharing
ChargeSini Inks MoU with UNITEN and Kevin Lab for joint data sharing and research to improve energy efficiency.
20-11-2024
ChargeSini To Set Up EV Chargers At KEB Properties New Developments
ChargeSini inks MOU with KEB Properties to develop new charging facilities in selected new developments.
31-10-2024
ChargeSini NU Empire Mall Subang DCFC Coming Soon - 2 x 60kW @ RM1.39/kWh
ChargeSini launches latest 60kW DCFC station at NU Empire Mall, Subang Jaya, offering a charging rate of RM1.39 per kWh.
27-09-2024
Latest News
CIMB: EV Demand Will Be Resilient Despite End of Tax Holiday
CIMB says EV demand in Malaysia remains resilient thanks to front-loaded inventories and delayed OMV.
09-01-2026
First C&C Standalone Leapmotor Outlet Opens In Pavilion Bukit Jalil
Cycle & Carriage (C&C) opens first standalone Leapmotor brand showroom outlet in Pavilion Bukit Jalil.
08-01-2026
Grab Set To Adopt GAC EVs Across ASEAN
E-hailing giant Grab inks strategic partnership with automaker GAC, will fleet 20,000 EVs across ASEAN.
08-01-2026
Report: Rapid Bus Experimenting With Diesel-To-EV Bus Conversions
Rapid Bus reportedly experimenting with novel diesel-to-EV bus conversions through proof-of-concept (POC) pilot.
07-01-2026
Refreshed 2026 Xiaomi SU7 Unveiled – Up to 902 km Range, New V6S Plus Motor
Xiaomi has given its SU7 EV sedan an update for 2026, featuring minor design tweaks, an updated powertrain, and more.
07-01-2026
CES 2026: Afeela Prototype 2026 Previews Brand’s Future EV SUV
Sony Honda Mobility’s second model will be a sleek EV SUV crossover based on the new Afeela Prototype 2026.
07-01-2026
Tesla Stuns Market — No Price Hike for 2026!
Tesla stuns market - no 2026 price hike, sparking questions about incentives and EV adoption.
07-01-2026
Donut Lab Solid-State Battery Set To Power EVs From Q1 2026
Donut Lab touts its solid-state batteries will be cheaper than lithium-ion, with adoption in production EVs hitting the road from Q1 2026 onwards.
06-01-2026
Show More
trending_flat