Careplus Launches ESG Programme, Starting with Communities in Negeri Sembilan
Careplus has launched the Careplus Group ESG program in conjunction with the development of Careplus Mall.
Careplus Group Berhad today launched the Careplus Group ESG program in conjunction with the development of Careplus Mall. This launch marks the group’s commitment to sustainability and social responsibility as part of its core values as it ventures into the manufacturing of electric vehicles (EVs).
Today’s launch was held across two separate venues in the state of Negeri Sembilan, with the first one taking place at the Careplus Mall in Seremban and the second one at the NevX manufacturing facility site in Chembong.
Officiating the launch was Negeri Sembilan State Tourism, Arts, and Culture Committee chairperson, YB Nicole Tan Lee Koon, alongside the Minister of Transport, YB Anthony Loke, who is also the Member of Parliament for Seremban. To mark the commencement of its ESG programme, a 30-year-old tree from the Careplus Mall has been planted next to the NevX plant in Chembong.
With the launch of its ESG programme today, the firm’s new NevX EV production facility will be operated with ESG strategies in mind. Once operational, the new plant is expected to reduce its carbon footprint through several eco-friendly solutions, including zero wastewater discharge and zero noise pollution, while solid waste will be processed through recycling centres within the facility.
More importantly, a significant portion of the facility’s energy will be powered by solar panels that are planned to be installed on the roof of the plant.
Minister of Transport & Seremban MP YB Anthony Loke (centre)
Applauding Careplus’ efforts in establishing its own ESG programme, Loke said that the firm’s plan to set up a dedicated EV production facility is part of efforts to promote clean technology and reduce the country's carbon footprint, as well as reduce dependence on diminishing fossil fuels. He further spoke on the government's efforts to incentivise and facilitate efforts to achieve the goals of the project and to ensure all safety measures and environmental standards are followed during the construction and operation of the plant.
"It is clear that the adoption of EVs is also another effective way to uphold ESG principles. Thus, for me, the choice to develop the EV industry is a right choice in line with the automotive industry while upholding EG," Loke said.
Set to be fully operational later in 2025, the Phase 1 construction of the NevX EV production facility has been well underway since November last year, with Careplus stating that the plant has reached 30% of its completion earlier in April 2024. The first phase of the project will have an expected annual capacity of 50,000, while at the same time bringing more than 600 career opportunities to the local community.
Meanwhile, Phase 2 and Phase 3 of this project are set to commence later in 2026 and 2028, respectively. Once fully completed, this will further expand the complex’s annual production capacity to over 100,000 units, with a total investment of RM600 million being channelled to the whole project.
Gallery


























Written By
Mukhlis Azman
An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman
JPJ Running Numbers
KUALA LUMPUR
VPP7023
SELANGOR
BSH3092
JOHOR
JYF4986
PULAU PINANG
PRT4572
PERAK
APA4723
PAHANG
CFD2778
KEDAH
KGB9074
NEGERI SEMBILAN
NEG7938
KOTA KINABALU
SJM2534
KUCHING
QAB9715L
Last updated 23 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.13
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.85
-0.05
EURO 5 B7
RM 3.05
-0.05
Last updated 21 Aug, 2025
Related News
Langkawi LRT ‘Unrealistic’, Focus Stays on Penang LRT and ECRL - Loke
The government is pushing ahead with the Penang LRT and ECRL, but dismissed talk of a Langkawi LRT as unrealistic.
19-08-2025
Malaysian Transport Safety Board Proposal Back on Table – MOT
The Ministry of Transport is drafting a policy to establish the Malaysian Transport Safety Board (MTSB).
13-08-2025
Loke: Accessibility, Safety Upgrades Coming To LRT Stations
Prasarana studying plans to install barriers at older LRT stations for enhanced passenger safety.
08-08-2025
Aerotrain Disruption A Minor Glitch, ETS3 Project On Track - Loke
KLIA’s Aerotrain glitch was a minor software bug, not a breakdown, while ETS3 to Johor Bahru is on track, says Transport Minister.
07-08-2025
ETS Segamat–Johor Bahru Extension is On Track, No Delays – MoT
Transport Minister Anthony Loke says the ETS extension project from Segamat to Johor Bahru is on track with no delays.
06-08-2025
LRT3 Hits 99% Completion - Loke
LRT3, which will connect Bandar Utama to Johan Setia, is 99% complete and on track for launch, says Transport Minister.
30-07-2025
Bas.My Launched with Focus on Accessibility and Affordability
Loke: 48 brand-new buses and 13 routes, Bas.My is setting a new standards for stage buses in Kedah.
29-07-2025
Turun Anwar Rally: Loke Urges Train Use, PDRM May Divert 16 Roads
Transport Minister and PDRM urges public to plan ahead and use public transportation to ease congestion caused by Turun Anwar rally.
25-07-2025
Latest News
CAP Warns of Rising Dangers from Bright Digital Billboards
CAP says overly bright and fast-changing roadside billboards are endangering drivers and calls for tighter controls.
22-08-2025
Man Jailed 5 Years For Burning Tow Truck After Axia Was Towed
A man set fire to an MBJB tow truck after his Axia was impounded, earning him five years in jail and a RM6,000 fine.
22-08-2025
Expert Raises Red Flags Over KLIA Aerotrain
Expert says KLIA’s aerotrain, though new, still runs on ageing systems that risk future breakdowns.
22-08-2025
JPJ Backs RXZ Members 7.0 With Road Safety Push
JPJ is backing the RXZ Members 7.0 ride in Terengganu with safety campaigns, helmet giveaways and a push for unity on the road.
22-08-2025
JPJ Seizes Three Buses Running On Expired Road Tax, Permits
Three stage buses were seized in KL after JPJ found them operating with expired road tax, inspection certificates, and permits.
22-08-2025
Omoda | Jaecoo Carnival Kicks Off at Desa ParkCity Aug 21–24
Omoda | Jaecoo Carnival runs at Desa ParkCity from Aug 21–24, featuring car showcases, tech highlights and test drives.
22-08-2025
KKR Details RM5M Road Works in Kapar, Mulls Special Road Maintenance Fund
KKR has set short and long-term plans for Kapar’s roads while considering a special fund for industrial maintenance.
21-08-2025
MRT Corp Justifies RM16.8b Penang LRT Budget
MRT Corp says the RM16.8 billion ceiling for Penang LRT reflects market realities, but MCA wants clearer answers on taxpayers’ money.
21-08-2025
Show More
trending_flat