KL, JB & George Town Identified To Possibly Adopt Congestion Charges

It seems the idea of adopting and practising ‘Congestion Charges’ scheme in major local cities to ease traffic congestion is still being mulled by the government. In fact, the subject was amongst the highlight discussions in Dewan Rakyat earlier today.
As a result, George Town in Penang, Kuala Lumpur and Johor Bahru are the three cities identified for the initial rollout of proposed Congestion Charges scheme, the Dewan Rakyat reportedly heard.
Minister in the Prime Minister’s Department (Federal Territories) Dr Zaliha Mustafa explained that the proposed charges are still being studied by the Malaysian Institute of Road Safety Research (MIROS) and the Malaysian Green Technology and Climate Change Corporation (MGTC).

Aspects being studied include the scheme’s implementation mechanism, potential reduction of traffic volume, as well as the projected uptake of public transportation if the scheme is practiced. The study is expected to be completed by this year, adds Dr Zaliha.
“If we implement Congestion Charges, it can reduce traffic volume by up to 20% in Kuala Lumpur. The charge cannot be too low but should discourage motorists from using certain roads. We also do not want the charge to be too high, which can burden consumers,” argued Dr Zaliha.
Citing early findings from the study, Dr Zaliha also noted that other similar measures used abroad are also being considered. Amongst them is the electronic licence plate reader used in New York City where charges are automatically imposed once a vehicle number plate is detected.

Another measure under consideration is the electronic road pricing mechanism practiced in neighbouring Singapore. This method sees congestion charges imposed based on both zone and time instead to control traffic flow. A similar practiced is used in the city of London too.
“I agree with the Transport Minister’s stance that it is not appropriate to impose a congestion charge without a complete and integrated public transport system,” added Dr Zaliha further.
She also noted that approximately 1.5 million vehicles enter and exit Kuala Lumpur over 24 hours, but public transport ridership in the nation’s capital was estimated to be at just 25%.
Source: Bernama / The Star / NST
Written By
Thoriq Azmi
Former DJ turned driver, rider and story-teller. I drive, I ride, and I string words together about it all. [#FuelledByThoriq] IG: https://www.instagram.com/fuelledbythoriq/
JPJ Running Numbers
KUALA LUMPUR
VQE7954
SELANGOR
BSL1692
JOHOR
JYN4296
PULAU PINANG
PRW8416
PERAK
APD5532
PAHANG
CFE5298
KEDAH
KGD5374
NEGERI SEMBILAN
NEJ289
KOTA KINABALU
SJP4280
KUCHING
QAB8102M
Last updated 24 Dec, 2025
Fuel Price
Petrol
RON 95
RM 2.64
-0.02
RON 97
RM 3.27
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.06
-0.02
EURO 5 B7
RM 3.26
-0.02
Last updated 11 Dec, 2025
Related News
Malaysian Transport Safety Board Proposal Back on Table – MOT
The Ministry of Transport is drafting a policy to establish the Malaysian Transport Safety Board (MTSB).
13-08-2025
Govt’s Initiative To Lessen Traffic Jams Through Barrier-Free System
The Malaysian government will implement a new toll system to prevent traffic congestion due to outdated toll technology currently in use in the nation.
21-03-2023
PMX: No Congestion Charges Yet, Public Transport Must Improve First
Prime Minister says congestion charges may only be considered once public transport system is more efficient.
30-09-2025
Loke: KL Congestion Charge Not On The Table
Govt has no plans to implement congestion charge in Kuala Lumpur says Minister Loke.
26-03-2025
Loke: Congestion Charges Must Come With Reliable Transit
Transport Minister Anthony Loke stresses that congestion charges are not feasible without first improving public transport networks.
20-02-2025
Public Transport Upgrades, Congestion Charges Help Ease Traffic Jams
Government should invest more in improving public transportation and implementing congestion charges to reduce traffic jams.
09-01-2024
Congestion Charges Necessary To Ensure City’s Sustainability
The government needs to consider imposing congestion charges in Kuala Lumpur to reach sustainable city goals in Klang Valley.
21-12-2023
Latest PDRM Ops Sees Over 9,400 Summonses Issued Since Tuesday
PDRM’s latest mass operation, called Ops Hormat Undang-Undang Jalan Raya, saw over 9,400 summonses issued across three days.
07-06-2024
Latest News
RM20 Million Allocated To Ipoh City Council For Road Resurfacing
Ipoh City Council (MBI) granted with RM20 million funding from federal government for road resurfacing.
23-12-2025
Christmas Traffic Advisory Issued For KL-Karak, LPT1
AFA Prime has released Christmas traffic advisory for Dec 25 and 28 along the KLK and LPT1.
23-12-2025
JPJ Flags 2,685 Luxury Cars for Expired Road Tax, Porsche Tops The List
JPJ enforcement found 2,685 luxury vehicles without valid road tax this year, with Porsche topping the list.
23-12-2025
Zeekr Malaysia Celebrates 2,000th Unit Delivery Milestone
Zeekr Intelligent Technology Malaysia celebrates its 2,000th unit delivery milestone just one year after its official launch.
22-12-2025
UMW Toyota Casts Spotlight On Multi-Pathway Ethos At CETA Summit
UMW Toyota Motor (UMWT) champions multi-pathway decarbonisationan ethos at recent CETA summit.
22-12-2025
BUDI95 Saves Govt RM800 Million, Benefits Malaysians Through Cash Contributions - PMX
The BUDI95 fuel subsidy programme saves RM800 million with savings redirected to cash aid, healthcare, infrastructure.
22-12-2025
Selangor JPJ: Body Cams Will Boost Transparency
Selangor JPJ rolls out body cameras for its enforcement officers as part of efforts to improve transparency.
22-12-2025
Perodua Reportedly Eyes RM500m Tan Chong Rawang Plant
Perodua is reportedly eyeing to acquire Tan Chong’s Rawang plant to ease mounting production pressure.
22-12-2025
Show More
trending_flat