178,148 KTMB Tickets Snapped Up For Aidilfitri

178,148 tickets have been sold for the electric train service (ETS), KTM Intercity, and Shuttle Tebrau for Aidilfitri travel between March 28 and April 6, BH has reported.
Transport Minister Anthony Loke reported that ETS tickets were the most popular, with only 10,958 remaining, and overall only 9% of tickets are still available.
āFor the KTM Intercity service, a total of 43,920 tickets are on sale, involving 22 trips which cover Shuttle Timur, Ekspres Selatan and Ekspres Rakyat Timuran.
āMeanwhile, the Shuttle Tebrau is offering 99,200 tickets for the Johor Bahru Sentral ā Woodlands route,ā he said at a press conference yesterday (March 23).

Starting March 28th and running through April 6th, KTMB will add four extra ETS services to their schedule. These additional services include two trips between KL Sentral and Padang Besar and two more between KL Sentral and Butterworth.
KTMB is also offering special Ekspres Lambaian Aidilfitri train services for the East and North Coast editions, the transport minister said. These special trains offer 312 tickets per trip, for a total of 1,248 tickets. Tickets went on sale March 12th, with prices ranging from RM90 to RM95 for a one-way trip.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQD4931
SELANGOR
BSK8056
JOHOR
JYM7319
PULAU PINANG
PRW5345
PERAK
APD3484
PAHANG
CFE4453
KEDAH
KGD4234
NEGERI SEMBILAN
NEH8793
KOTA KINABALU
SJP2721
KUCHING
QAB7387M
Last updated 15 Dec, 2025
Fuel Price
Petrol
RON 95
RM 2.64
-0.02
RON 97
RM 3.27
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.06
-0.02
EURO 5 B7
RM 3.26
-0.02
Last updated 11 Dec, 2025
Related News
Gemas-JB Electrified Train Cuts KL-Johor Travel To 4 Hours
The new electrified Gemas-Johor Bahru train line slashes travel time from KL to Johor to just 4 hours 20 minutes.
12-12-2025
KTMBās ETS3 To JB Sentral Launches Dec 12 with 30% Discount
KTMB will start operating its ETS3 to JB Sentral on 12 Dec 202 with a 30% discount for travel on this route.
09-12-2025
KTMB Halts Klang-KL Sentral Route This Sunday for Track Upgrades
KTMB will temporarily suspend the Klang-KL Sentral service this Sunday (Dec 7) to allow for track and upgrade works.
04-12-2025
KTMB Set To Launch Komuter Selatan in Feb with Fares Under RM3
Starting Feb, the 25 km Komuter Selatan line will slash Johor peak-hour travel to 30 minutes with fares under RM3.
02-12-2025
KTMB Diverts Passengers From Arau Station As Floods Worsen In Perlis
Flooded roads have forced KTMB to temporarily shift ETS boarding and alighting from Arau to Kodiang Station.
25-11-2025
ETS JB to KL Service Starts Dec 12, Royal Launch Set For Dec 11
ETS JB-KL service finally set to begin operations on Dec 12, official launch graced by the Sultan Ibrahim set for Dec 11.
24-11-2025
Over 1,300 hours Of Train Delays This Year Due To Cable Theft - Loke
Cable theft has caused major disruptions to KTM Komuter and ETS services this year, resulting in over 1,300 hours of delays.
21-11-2025
KTMB Adds Extra ETS Trains For Christmas, School Holiday Rush
KTMB is rolling out additional ETS services to handle holiday demand and ease congestion on its northern routes.
21-11-2025
Latest News
Govt Rules Out Tiered RON95 Pricing After 300 litres
Government rules out tiered RON95 prices under BUDI95, keeps RM1.99 for first 300 litres
12-12-2025
Hyundai Partners EON, Expands Local Network
Hyundai and EON have signed a LOI to open two new dealerships in Klang Valley and Penang.
12-12-2025
Perodua Traz/Nexis D66B Set to Debut on December 17
The long-awaited Perodua Traz/Nexis D66B SUV is set to make its official debut later on December 17, 2025.
12-12-2025
Gemas-JB Electrified Train Cuts KL-Johor Travel To 4 Hours
The new electrified Gemas-Johor Bahru train line slashes travel time from KL to Johor to just 4 hours 20 minutes.
12-12-2025
PLUS and KEC Ink MoU to Advance Smart Mobility
PLUS and KEC Smart Mobility signs agreement to develop smarter, greener and more connected expressway operations.
12-12-2025
LRT3 Wonāt Launch This Year As Glitches Persist, No New Date Set
The LRT3 faces another delay after 33 software glitches were discovered during fault-free tests and no new opening date has been fixed yet.
12-12-2025
CKD GWM WEY G9 Rolls Out at New EPMB Plant
CKD GWM WEY G9 rolls out from EPMBās new Phase 2 plant, strengthening Malaysiaās NEV localisation ecosystem.
12-12-2025
Proton Shifts 13,451 Units Throughout Nov 2025
Proton closes Nov 2025 by shifting 13,451 units, touts to be āon targetā for record exports growth too.
11-12-2025
Show More
trending_flat