ECRL Railway Construction Along Kota Bharu-Selangor Over 80% Complete
The East Coast Rail Link (ECRL) project, spanning 665 kilometers from Kota Bharu, Kelantan to Selangor, has achieved over 81% completion. Malaysia Rail Link Sdn Bhd (MRL) CEO Datuk Seri Darwis Abdul Razak confirmed the project's progress, stating it remains on track for its December 2026 completion date.
According to Darwis, the 81% completion figure follows a recent inspection of the Pasir Puteh ECRL Station site.
“The work progress of the 43-kilometre alignment in Kelantan has reached 88.86 per cent, contributing significantly to the overall advancement of the project,” he said, adding that testing and commissioning activities are expected to begin in June 2026.
The CEO of MRL stated that construction on the two ECRL stations in Pasir Puteh and Tunjong, Kelantan, are 69 and 68 percent complete, respectively. Both stations should be finished by May 2025.
Furthermore, Darwis said that the 400-kilometer section connecting Kelantan, Terengganu, and portions of Pahang is doing well, with 90 percent of the work completed in Terengganu and 86 percent in Pahang.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPG3497
SELANGOR
BSF4838
JOHOR
JYA4553
PULAU PINANG
PRR4758
PERAK
ANW6434
PAHANG
CFC1277
KEDAH
KGA9315
NEGERI SEMBILAN
NEG2297
KOTA KINABALU
SJL2913
KUCHING
QAB5083L
Last updated 17 Jun, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.07
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.74
EURO 5 B7
RM 2.94
Last updated 12 Jun, 2025
Related News
ECRL: KotaSAS Station System Installation Completed
KotaSAS Station becomes first along ECRL route to complete installation of critical systems.
30-05-2025
MiTRANS: ECRL-Sungai Golok Link Key to Regional Rail
MiTRANS: Extending the ECRL to Sungai Golok would complete a key missing link in the ASEAN rail network.
22-05-2025
Thai Ambassador Proposes ECRL Extension To Sungai Golok
Thai Ambassador Lada Phumas suggested extending the ECRL to Sungai Golok for better rail links.
16-05-2025
ECRL Hits 82% Completion, Promises 1,800 Jobs - 80% For Locals
ECRL, Malaysia’s largest rail project is nearing completion, with passenger service set to begin by Jan 2027.
06-05-2025
ECRL to Boost East Coast Growth, Strengthen Malaysia-China Ties
The ECRL project is set to unlock new growth for Malaysia’s east coast and strengthen links with China.
29-04-2025
ECRL Concludes 38 Tunnel Excavations Ahead Of Schedule
MRL announces the completion of excavation work for 38 tunnels along the ECRL rail line.
09-04-2025
ECRL 80% Complete, Shifting To Above-Ground Work
The ECRL project, which is nearing 80% completion, is transitioning from the underground construction phase to above-ground work.
27-03-2025
MOT Developing Policy To Encourage Cargo Companies To Use ECRL
MOT will implement a policy to incentivize the industry to use the ECRL service.
06-03-2025
Latest News
Gerik Crash: PSV Licence Suspended, RM1.7M Aid Raised
JPJ suspends Gerik crash bus driver’s PSV licence as investigations rule out technical failure.
17-06-2025
PLUS Opens Three New Lanes At Rawang Selatan Toll Plaza
PLUS has announced the addition of three new lanes at the Rawang Selatan toll plaza (Exit 115).
16-06-2025
RON95 Petrol Subsidy Rationalisation Will Proceed – PMX
The government will proceed with the RON95 fuel subsidy rationalisation, says Prime Minister Anwar Ibrahim.
16-06-2025
Car Wash Worker Severely Injured After Vehicle Plunges From 3rd Floor
A car wash worker driving a customer’s Toyota Camry crashed through the wall of a building in Old Klang Road on Sunday.
16-06-2025
Roslan Abdullah Joins GWM Malaysia As New COO
Former deputy CEO of Proton Roslan Abdullah appointed as new COO at GWM Malaysia.
16-06-2025
Mustang, BMW Owners Caught With Expired Road Tax, Citing Financial Issues
Financial issues cited by Mustang and BMW X5 owners caught with expired road tax during JPJ operation.
16-06-2025
Nanta: Damaged Road Surface Linked to Cyclist’s Death
Road damage blamed on heavy lorry traffic; urgent repairs ordered following fatal crash.
16-06-2025
Gerik Crash: No signs Of Brake, Steering Failure
Preliminary investigations into the fatal June 9 bus crash in Gerik, have not revealed any technical malfunctions.
15-06-2025
Show More
trending_flat