Pedas RSA Build Reaches 43% Ahead Of Rescheduled Q1 2026 Opening

Following up on our earlier coverage, the Pedas RSA at KM 241 (Southbound) on the PLUS North-South Expressway continues to take shape as Malaysia’s first privately-operated Rest Service Area (RSA).
Developed by Levn Capital with the approval of the Malaysian Highway Authority (LLM), the project is set to deliver a new and elevated experience for southbound travellers.

Located just 84 KM south of Kuala Lumpur, the RSA enjoys dual access from both the expressway and nearby local roads. It is designed to serve highway users as well as the surrounding Kampung Pedas Hilir community, including students from nearby institutions.
As of the end of March 2025, construction progress remains strong at 43% completion. Approximately 70% of the 1st-floor slab casting for the main complex has been completed, marking a major structural milestone.
-(1)-full_normal.jpg)
In parallel, all three drive-thru satellite buildings have successfully completed concrete roof casting. These outlets will provide quick, convenient services to meet the needs of today’s on-the-go travellers.

To recap, the Pedas RSA will feature Malaysia’s first Electric Vehicle Charging Corridor (EVCC), offering 350 kW DC fast chargers developed in partnership with Gentari and Tesla. This positions the RSA as a key node in the nation’s emerging EV infrastructure.
The site will also house Petronas and Shell refuelling stations, creating a comprehensive hub for both electric and traditional vehicles.
With sustainability as a core design principle, the Pedas RSA is being developed as a Platinum-rated Green Building. It will include energy-efficient lighting, rainwater harvesting, and naturally lit communal areas. Travellers can also look forward to well-known F&B brands such as McDonald’s, Coffee Bean, and Tealive.


Strategically positioned along the high-traffic corridor between Kuala Lumpur and Singapore, the RSA is well-placed to serve commuters, long-distance travellers, and the local community.
According to Levn Capital, the project originally slated for a Q4 2025 opening, has been rescheduled to Q1 2026 to ensure the highest standards of delivery. We will continue to provide updates as the project progresses, as this facility is set to become a vital connection point for the growing needs of long-distance highway commuters.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQD7825
SELANGOR
BSK8756
JOHOR
JYM8964
PULAU PINANG
PRW6011
PERAK
APD4031
PAHANG
CFE4685
KEDAH
KGD4501
NEGERI SEMBILAN
NEH9159
KOTA KINABALU
SJP3024
KUCHING
QAB7469M
Last updated 17 Dec, 2025
Fuel Price
Petrol
RON 95
RM 2.64
-0.02
RON 97
RM 3.27
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.06
-0.02
EURO 5 B7
RM 3.26
-0.02
Last updated 11 Dec, 2025
Related News
Yinson GreenTech, PLUS Ink JV for Integrated EV Charging Hubs
Yinson GreenTech and PLUS join forces to develop full-service EV charging hubs along North-South Expressway.
12-06-2025
Pedas RSA: Nation's First 350 kW EV Charging Corridor Powered by Gentari & Tesla
PEDAS RSA - First privately-operated rest area with 350 kW Electric Vehicle Charging Corridor.
07-11-2024
Petron Malaysia Opens Milestone 800th Service Station
Petron Malaysia officially opens milestone 800th service station at PLUS Pedas-Linggi Layby Southbound.
14-01-2025
Pedas RSA: Nation's First 350 kW EV Charging Corridor Powered by Gentari & Tesla
PEDAS RSA - First privately-operated rest area with 350 kW Electric Vehicle Charging Corridor.
07-11-2024
Pedas RSA: Nation's First 350 kW EV Charging Corridor Powered by Gentari & Tesla
PEDAS RSA - First privately-operated rest area with 350 kW Electric Vehicle Charging Corridor.
07-11-2024
Authorities Investigating Viral DASH Highway ‘Drifters’
Authorities investigating viral DASH Highway ‘Drifters’ for reckless driving acts at the Denai Alam Toll Plaza of the DASH Highway.
27-02-2023
Temporary Closure Of PLUS Rest Areas
Rest and Service areas (RSAs) and lay-bys would be temporarily closed to the public for maintenance.
15-12-2022
Latest News
Denza Malaysia Surpasses 1,000-unit Sales Milestone
Denza Malaysia reveal it has shifted 1,002 units of its D9 luxury EV MPV locally in less than a year.
16-12-2025
smart #2 EV Begins Testing Ahead of 2026 Debut
The long-awaited smart ForTwo’s successor, the smart #2, begins testing ahead of its planned debut later in 2026.
16-12-2025
EV Ambitions: Cheap Petrol, Costly Bottlenecks
With one charger for every 13.5 EVs, Malaysia’s EV ambitions face both a numerical and regulatory gap in its ecosystem.
16-12-2025
BYD Advances EV Efficiency with Variable-Flux Motor Patents
BYD reveal patents for variable-flux e-motors, aims to improve EV efficiency further through torque and driving range.
15-12-2025
XPeng Names EPMB as Assembly Partner in Malaysia
XPeng in talks with EPMB to begin local production in 2026, positioning Malaysia as a RHD hub for ASEAN.
13-12-2025
TotalEnergies Exits Singapore’s EV Charging Scene
TotalEnergies Exits Singapore’s EV Charging Scene as its 1,400 HDB chargers shift to new operators.
13-12-2025
Report: Ford & Renault Teaming Up For Two Small EVs
Ford and Renault are set to team up to develop two new small EVs based on latter’s Ampr EV base.
10-12-2025
EU Plans New Compact EV Class to Undercut Chinese Rivals – Report
The European is reportedly planning to create a new compact electric vehicle class in a bid to undercut rivals from China.
10-12-2025
Show More
trending_flat

