MiTRANS: ECRL-Sungai Golok Link Key to Regional Rail
Extending the East Coast Rail Link (ECRL) from Kota Bharu to Sungai Golok would complete the eastern corridor of the Singapore–Kunming Rail Link (SKRL) and boost Malaysia’s regional logistics role, said Dr Wan Mazlina Wan Mohamed of MiTRANS.
She noted the extension would link with Thailand’s planned rail upgrades from Hat Yai to Sungai Kolok and create an alternative land bridge between Port Klang, Kuantan Port and Kunming in China through southern Thailand.
Currently, only the western side of the SKRL runs through Padang Besar and Hat Yai. The eastern route, through Kelantan, is still disconnected.
Wan Mazlina was responding to a recent suggestion by Thailand's ambassador to Malaysia, Lada Phumas. The ambassador proposed extending the ECRL to the Sungai Golok border to improve rail links between the two countries.
She said the project would strengthen regional rail networks and support the ASEAN Master Plan on Connectivity 2025. Border facilities would also need upgrades, including immigration and customs posts, to make cross-border movement easier.
Better rail links would help Kelantan attract investment. It would support the state’s goals under the Tanah Merah-Tumpat Corridor and help draw in RM9.5 billion in private investments by 2025.
Wan Mazlina added that the extension fits well with Malaysia’s National Logistics Policy 2030. The policy aims to boost the share of freight moved by rail and improve the East Coast’s role in regional trade.
From a cost perspective, she said rail transport is about 30 percent cheaper than road for bulk goods. Travel time between Kota Bharu and Bangkok could be cut in half, from 24 hours to just 12.
However, she warned that the extension could cost over RM2 billion due to the need for new construction and border facilities. The government must weigh this against other major projects, like ECRL Phase 2 to Penang and the Sabah-Sarawak link.
There are also challenges like land acquisition in flood-prone areas, building a bridge over the Golok River, and protecting wetlands in Tumpat.
Given all that, she still believes that if done right, the project could turn Malaysia’s East Coast into a key trade and logistics hub for ASEAN and the wider Indo-Pacific region.
Source: BERNAMA
Written By
KS
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well! https://www.linkedin.com/in/kumeran-sagathevan/
JPJ Running Numbers
KUALA LUMPUR
VPJ9448
SELANGOR
BSG2125
JOHOR
JYD431
PULAU PINANG
PRS3240
PERAK
ANX5825
PAHANG
CFC5384
KEDAH
KGB3411
NEGERI SEMBILAN
NEG4359
KOTA KINABALU
SJL6477
KUCHING
QAB6604L
Last updated 12 Jul, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.18
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.88
+0.03
EURO 5 B7
RM 3.08
+0.03
Last updated 10 Jul, 2025
Related News
KL-Karak Lane Closure Until Aug 31 For ECRL Works
All Kuantan-bound lanes on the KL-Karak Highway (KM25.75–KM26.39) are closed until Aug 31 for ECRL works.
10-07-2025
ECRL Project 85% Completed
The ECRL is 85% complete and on track to start operations by early 2027, says Chief Secretary.
09-07-2025
RM300K Lost To Cable Thefts At Terengganu ECRL Sites
Police recorded 22 theft-related cases at Terengganu ECRL sites, costing an estimated RM300,000 in losses.
25-06-2025
ECRL Could Extend to Sungai Golok After KTMB Revival – MRL CEO
MRL is not discontinuing the proposal to extend the ECRL line from its current final station in Kota Bharu to Sungai Golok.
24-06-2025
Cable Thefts Put ECRL Timeline At Risk - MRL Chief
Spike in cable and equipment thefts threatens ECRL completion timeline, says MRL CEO
23-06-2025
ECRL: KotaSAS Station System Installation Completed
KotaSAS Station becomes first along ECRL route to complete installation of critical systems.
30-05-2025
Thai Ambassador Proposes ECRL Extension To Sungai Golok
Thai Ambassador Lada Phumas suggested extending the ECRL to Sungai Golok for better rail links.
16-05-2025
ECRL Hits 82% Completion, Promises 1,800 Jobs - 80% For Locals
ECRL, Malaysia’s largest rail project is nearing completion, with passenger service set to begin by Jan 2027.
06-05-2025
Latest News
June 2025 Auto Sales Fall Across the Board - 20.9%
June sees overall vehicle sales fall 20.9%, with hybrids down over 23% marking the segment's first major dip in months.
12-07-2025
Govt Approves Additional 10,000 MyLesen B2 Free Motorcycle Licence Slots
Govt approves additional10,000 MyLesen B2 free motorcycle licence slots for B40 students this year.
11-07-2025
PDRM: Bicycle Use on Highways is Illegal
PDRM reminds cyclists that highways are strictly for motor vehicles, cycling there is both dangerous and illegal.
11-07-2025
PDRM: Private Traffic Escorts for Motorcycle Convoys Prohibited
PDRM reminds riders that private convoy escorts are not allowed, all group rides must follow the law.
11-07-2025
Tyre Company Charged for Misusing Sirim Labels
Cerico Retread Sdn Bhd and its director charged for using fake Sirim logos on 80 retreaded tyres.
11-07-2025
CROSSing Over: Chery Tiggo Cross Garners 1,000 Bookings
Chery’s latest SUV offering, the new Tiggo Cross, sees 1,000 bookings quickly placed since launch.
11-07-2025
New Concessionaire Set to Manage Parking Collection in Selangor from Aug 1
From Aug 1 onwards, a new concessionaire will manage the parking fee collection for MBPJ, MBSJ, MBSA, and MPS.
10-07-2025
KL-Karak Lane Closure Until Aug 31 For ECRL Works
All Kuantan-bound lanes on the KL-Karak Highway (KM25.75–KM26.39) are closed until Aug 31 for ECRL works.
10-07-2025
Show More
trending_flat