KTMB Train Schedule Upgrades Hit Speed Bumps
Plans to improve KTM Berhad’s passenger train services are running into a few roadblocks, says Transport Minister Anthony Loke.
In a written reply to Kampar MP Chong Zhemin, Loke explained that the current service constraints are caused by three key issues which are a shortage of trainsets, limited track access, and speed restrictions due to ongoing upgrades.
“Speed limits are especially tight in areas with active infrastructure and signalling works like the Klang Valley, Gemas-Johor Bahru, and the East Coast line,” he said.
The minister noted that KTMB’s ability to roll out better schedules depends on the condition of its rail infrastructure and the availability of trains.
“To increase frequency, we need enough functioning trainsets, and the tracks must be in optimal condition to allow trains to run at full speed,” Loke added.
To address the shortage, the government awarded a contract to CRRC Rolling Stock Center (Malaysia) Sdn Bhd on March 20 to supply 12 new three-car electric train sets for the Northern Komuter line.
These trains are aimed at easing growing demand in the northern sector, where daily ridership has jumped by 29% from 12,668 in 2023 to over 16,300 this year.
The ministry is also exploring trainset leasing to speed up the improvements.
“For now, service upgrades will be rolled out in stages depending on how quickly new trains arrive and infrastructure work wraps up,” Loke concluded.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPM7292
SELANGOR
BSG8294
JOHOR
JYE5934
PULAU PINANG
PRT1522
PERAK
ANY8048
PAHANG
CFD1142
KEDAH
KGB6714
NEGERI SEMBILAN
NEG6533
KOTA KINABALU
SJL9999*
KUCHING
QAB8643L
Last updated 07 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.94
+0.03
EURO 5 B7
RM 3.14
+0.03
Last updated 07 Aug, 2025
Related News
ETS to JB Sentral ‘On Track’, But Not Quite There Yet
KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.
04-08-2025
KTMB Adds 11,340 Extra ETS Seats for Aug - Sept Holidays
KTMB is adding 630 ETS seats daily from Aug 28 to Sept 21, totalling 11,340 extra seats across popular holiday period.
30-07-2025
KTMB Focuses On Service Over Profit - Loke
KTMB remains unprofitable due to subsidised fares, but profit isn’t the priority for now, says Transport Minister.
16-07-2025
Loke: No ETS For East Coast
Transport Minister Loke confirms ETS will not be extended to the east coast due to single-track, unelectrified rail lines.
15-07-2025
KTMB Launches KITS Style SuperApp
KTMB has launched the KITS Style SuperApp, a revamped platform to establish a more efficient transport system.
14-07-2025
KTM Shuttle Tebrau Ends 2027, Replaced By RTS Link
KTM Berhad’s Shuttle Tebrau service ends in 2027 and will be replaced by the RTS link.
25-06-2025
KTMB Train Services Face Major Delays Due To Cable Theft
Recent cable thefts targeting KTMB have disrupted three northern routes, causing delays exceeding an hour yesterday.
10-06-2025
Two Of 10 New ETS Train Sets Delivered To KTMB
Two of 10 new ETS sets, valued at RM400 million, have already been delivered to KTMB.
06-06-2025
Latest News
Updated Fuel Prices From 07 To 13 August
The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 07 to 13 August, 2025, the rates are as such.
06-08-2025
BYD Zengzhou Carrier Vessel Made Maiden Voyage to Malaysia
BYD’s own Zengzhou carrier vessel just made its maiden voyage to Malaysia, capable of carrying up to 7,000 vehicles.
06-08-2025
JPJ Warns Against ‘Kopi-O’ Licences As Fake Driving School Goes Viral
JPJ warns Malaysians against fake “kopi-o licences” offering driving permits without tests or training.
06-08-2025
2025 Proton Saga Details Leaked – New 1.5 4-cyl Engine, No MT, Dual-Screens
Alleged details plus snapshots of new 2025 Proton Saga leaks online, new 1.5 4-cyl engine, no MT option, and dual-screens touted.
06-08-2025
KKR: MLFF Will Be Privately Funded Under B2B Model
The MLFF toll system will be delivered through a B2B model, with private firms striking direct deals with highway concessionaires.
06-08-2025
ETS Segamat–Johor Bahru Extension is On Track, No Delays – MoT
Transport Minister Anthony Loke says the ETS extension project from Segamat to Johor Bahru is on track with no delays.
06-08-2025
Report: Malaysia Takes Lead in Southeast Asia’s Auto Market
Malaysia for the first time has surpassed Indonesia in quarterly car sales driven by strong local demand.
06-08-2025
Zero Tolerance Ahead For Untaxed Luxury Cars - Experts
Road safety experts are urging tougher penalties for luxury car owners who skip road tax and insurance.
06-08-2025
Show More
trending_flat