MAHB Calls In Independent Assessor After Latest KLIA Aerotrain Glitch

Malaysia Airports Holdings Bhd (MAHB) will bring in an independent assessor to review the power supply design and installation quality of the Kuala Lumpur International Airport (KLIA) aerotrain system, following yet another service disruption on Wednesday night.
The airport operator described the latest incident as disappointing, especially since the aerotrain had already gone through extensive testing, commissioning, and certification before returning to service in July.
The breakdown, which happened around 8.30PM, temporarily halted both trains due to a power trip. By 9.27PM, one train was safely restored, and both resumed normal operations after several rounds of safety and operational tests.

"The incident occurred within the aerotrain’s defect liability period, meaning the contractors remain responsible for rectifying any issues", it said in a statement.
The company has since held an urgent meeting with project partners French train manufacturer Alstom and the IJM-Pestech Joint Venture (IPJV), which designed and installed the system’s power distribution network.
“The root cause of the disruption is still under investigation. The contractor will be issuing a separate statement to provide a detailed technical explanation,” MAHB stated.
-full_normal.jpg)
As a precaution, the firm has deployed thermographic scanning and other diagnostic checks to ensure the system’s safety while rectification work continues.
Transport Minister Anthony Loke Siew Fook said the Land Public Transport Agency (APAD) will take enforcement action against MAHB over the repeated disruptions since the aerotrain’s relaunch.
“As a licensed operator, MAHB could face fines if it fails to maintain satisfactory service standards,” he told Parliament.
.jpg)
The aerotrain, which connects KLIA’s main terminal and satellite building, had been suspended for over two years before resuming operations in July. Since then, it has logged 20 incidents, involving both technical and human-related factors.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQP2370
SELANGOR
BSM9662
JOHOR
JYS5705
PULAU PINANG
PSA3142
PERAK
APF6906
PAHANG
CFF5983
KEDAH
KGE6158
NEGERI SEMBILAN
NEJ6799
KOTA KINABALU
SJQ6358
KUCHING
QAB3739N
Last updated 07 Mar, 2026
Fuel Price
Petrol
RON 95
RM 2.59
+0.05
RON 97
RM 3.15
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.04
+0.05
EURO 5 B7
RM 3.24
+0.05
Last updated 26 Feb, 2026
Related News
KLIA Aerotrain Begins Trial Runs, Nightly Shutdown Remains
Malaysia Airports will start trial operations for the KLIA Aerotrain as part of a month-long plan to fix reliability issues.
17-12-2025
KLIA Aerotrain Problems Go Beyond Simple Technical Glitches - Analyst
Experts say aerotrain issues run far deeper than simple glitches as KLIA runs a month-long overhaul to address underlying problems.
01-12-2025
Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues
KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.
17-11-2025
KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance
KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.
10-11-2025
Loke Orders MAHB To Keep Shuttle Bus Amid KLIA Aerotrain Woes
Transport minister says shuttle buses must stay as investigations continue into repeated aerotrain breakdowns.
31-10-2025
Govt Won’t Suspend KLIA Aerotrain, MAHB Facing Action - Loke
Loke says the government won’t halt the KLIA Aerotrain, but MAHB is facing action.
30-10-2025
MACC Open To Probing KLIA Aerotrain
MACC says it will investigate the KLIA Aerotrain project if corruption is found, following months of repeated breakdowns.
29-10-2025
KLIA Aerotrain Breaks Down Again; MOT, APAD Step In
KLIA’s Aerotrain is down again and the Transport Minister has told APAD to step in and probe MAHB’s handling of the issue.
28-10-2025
Latest News
Prasarana to Reveal LRT3 Launch Date This April—Here’s Everything We Know So Far
The wait for the LRT3 Shah Alam Line is entering its final stretch. After months of "will they, won't they" speculation, Prasarana has officially pointed to April 2026 as the month of truth.
05-03-2026
EV King is Here: How Proton e.MAS 5 Dethroned Popular Petrol Cars in 60 Days
PRO-NET has announced that the Proton e.MAS 5 has officially surpassed the 5,000-unit delivery milestone in just two months.
05-03-2026
Wolfgang Egger’s Masterpiece: Denza Z9 GT Confirmed for Malaysia Launch in Q2 2026
BYD Malaysia has officially confirmed that the Denza Z9 GT is set to launch in the local market in early 2026 (expected Q2). As the flagship luxury "shooting brake" for the brand, the Z9 GT is designed to offer a tech-forward alternative to the Porsche Panamera and BMW 5 Series Touring.
03-03-2026
Kelana Jaya LRT trains “out of service” but line running normally - RapidRail
Rapid Rail clarified that temporary train withdrawals on the Kelana Jaya LRT line are part of standard safety procedures.
27-02-2026
Leapmotor C10 Plus Debuts In Malaysia - 299 hp, 510 km Range, From RM139k
The 2026 Leapmotor C10 PLUS and exclusive Night Edition arrive in Malaysia with longer range, faster charging, and upgraded performance.
27-02-2026
Chery Malaysia Teams Up with Lee Chong Wei for Youth Badminton Cup
Chery Malaysia joins forces with Lee Chong Wei to sponsor the inaugural national youth tournament with RM100,000 in prizes.
27-02-2026
Updated Fuel Prices From 26 February To 4 March
The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 26 February to 4 March, 2026, the rates are as such.
25-02-2026
APAD to Investigate Kelana Jaya LRT Breakdowns, Prasarana Ordered to Explain
Transport Minister has directed APAD to probe recent Kelana Jaya LRT disruptions and warned action may be taken against Prasarana.
25-02-2026
Show More
trending_flat