Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues
KLIA’s aerotrain system may require a full reset to ensure long-term reliability, according to transport expert Assoc Prof Dr Law Teik Hua from Universiti Putra Malaysia.
For the month-long action plan by Malaysia Airports Holdings Bhd (MAHB) to truly succeed, Law said, the airport operator should focus on resetting the system rather than patching existing components.
Otherwise, KLIA risks becoming technologically advanced but operationally sub-standard, he stressed.

“The aerotrain operators have already invested in a large-scale replacement programme of the system worth RM456 million, involving the adoption of Alstom Innovia APM trains and a communications-based train control (CBTC) system,” Law said in a The Star report.
The transport expert also noted that similar Innovia systems have been used successfully at Dubai, Heathrow, and Jeddah airports, where proper installation, integration, and maintenance have resulted in highly reliable operations.
But recurring disruptions at KLIA suggest deeper, systemic problems.

“People-mover systems tend to be complex and could experience catastrophic failures if issues related to signalling, power distribution, vehicles, software, and sensor alignment are not perfected,” he explained.
Law further mentioned that world-class systems like Frankfurt’s SkyLine, Changi Airport’s Skytrain, and Hong Kong’s APM demonstrate that technology can perform at high levels with uptimes exceeding 99% if managed and maintained properly.
“KLIA’s global ranking will ultimately depend on performance and maintenance. If the action plan is implemented successfully, KLIA can reach the level of reputable airports and people movers,” he added.
KLIA’s Aerotrain will be out of service nightly from 9PM to 7AM starting Nov 15 for about a month as Malaysia Airports Holdings Bhd (MAHB) carries out a major upgrade to fix recurring disruptions.

The move comes after four separate service interruptions since the system resumed in July. Chief airports officer Bryan John Thompson said the issues were “standard failures” that happened during real-world operations.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQM4683
SELANGOR
BSM5949
JOHOR
JYR7039
PULAU PINANG
PRY8159
PERAK
APF3812
PAHANG
CFF3908
KEDAH
KGE4262
NEGERI SEMBILAN
NEJ5627
KOTA KINABALU
SJQ3628
KUCHING
QAB2655N
Last updated 24 Feb, 2026
Fuel Price
Petrol
RON 95
RM 2.54
RON 97
RM 3.10
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.99
EURO 5 B7
RM 3.19
Last updated 19 Feb, 2026
Related News
KLIA Aerotrain Begins Trial Runs, Nightly Shutdown Remains
Malaysia Airports will start trial operations for the KLIA Aerotrain as part of a month-long plan to fix reliability issues.
17-12-2025
KLIA Aerotrain Problems Go Beyond Simple Technical Glitches - Analyst
Experts say aerotrain issues run far deeper than simple glitches as KLIA runs a month-long overhaul to address underlying problems.
01-12-2025
KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance
KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.
10-11-2025
Loke Orders MAHB To Keep Shuttle Bus Amid KLIA Aerotrain Woes
Transport minister says shuttle buses must stay as investigations continue into repeated aerotrain breakdowns.
31-10-2025
Govt Won’t Suspend KLIA Aerotrain, MAHB Facing Action - Loke
Loke says the government won’t halt the KLIA Aerotrain, but MAHB is facing action.
30-10-2025
MACC Open To Probing KLIA Aerotrain
MACC says it will investigate the KLIA Aerotrain project if corruption is found, following months of repeated breakdowns.
29-10-2025
KLIA Aerotrain Breaks Down Again; MOT, APAD Step In
KLIA’s Aerotrain is down again and the Transport Minister has told APAD to step in and probe MAHB’s handling of the issue.
28-10-2025
KLIA Aerotrain Under Review After Recent Service Disruption
Malaysia Airports and the Transport Ministry are reviewing recurring Aerotrain glitches at KLIA.
22-10-2025
Latest News
Johor–Singapore RTS Link Fare Expected at RM15 to RM22 Per Trip
Transport Minister Anthony Loke says the RTS Link could cost between RM15 and RM22 per journey, with fares to be announced in 2H2026.
23-02-2026
Public Review Opens for Revised Penang Mutiara LRT with Cross-Sea Link at Core
MRT Corp opens a three-month public review for the Penang Mutiara LRT, featuring a proposed six-kilometre cross-sea link to Penang Sentral.
23-02-2026
Ops Luxury: JPJ Seizes Sambung Bayar Camry, Owner in Legal Trouble
A Toyota Camry Hybrid was recently confiscated by JPJ in Kedah for being part of a sambung bayar scheme with no valid road tax or insurance.
20-02-2026
Fix Public Transport Reliability Before Limiting Car Ownership - Experts
Experts say improving speed, reliability and first-mile connectivity must come before any move to limit car ownership or introduce congestion charges.
19-02-2026
Updated Fuel Prices From 19 To 25 February
The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 12 to 18 February, 2026, the rates are as such.
19-02-2026
JPJ Removes Daily Limit Quota for Queue Numbers at All Offices
The Road Transport Department has announced the removal of the daily limit quota for queue numbers at all its offices.
19-02-2026
Top 5 Best Car Tint in Malaysia
We’ve rounded up the 5 best car tints to keep your cabin comfy, protect your skin, and maintain privacy.
16-02-2026
Tesla Malaysia Completes First Vehicle Delivery in East Malaysia
Tesla Malaysia has completed its first official vehicle delivery in East Malaysia at its pop-up experience centre in Kuching.
16-02-2026
Show More
trending_flat