KLIA Aerotrain To Stop Nightly From Nov 15 For Reliability Upgrades

KLIA’s Aerotrain at Terminal 1 will be out of service nightly from 9PM to 7AM starting tomorrow for about a month while Malaysia Airports Holdings Bhd (MAHB) carries out a major technical upgrade.
“Our priority is to make sure the Aerotrain is safe and reliable, and this plan lets us tackle the root causes of past disruptions while keeping passengers protected,” said MAHB managing director Datuk Mohd Izani Ghani.
During the nightly suspension, buses will run between the main terminal and the satellite building, and more flights will operate from the main terminal to cut down transfers.

“We expect the work to take around a month, until Dec 15,” Izani added.
The upgrade will be carried out in three stages. The first stage focuses on inspections and fixing key faults. The second stage covers testing, software updates, and stress checks. The final stage involves trial operations to ensure everything runs smoothly before full service resumes.
Independent audits and a safety check by the Land Public Transport Agency (APAD) will provide extra assurance.

Since resuming service on July 1, the Aerotrain has carried over seven million passengers and completed more than 53,000 trips, with a 98.4% operational record.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQD7825
SELANGOR
BSK8756
JOHOR
JYM8964
PULAU PINANG
PRW6011
PERAK
APD4031
PAHANG
CFE4685
KEDAH
KGD4501
NEGERI SEMBILAN
NEH9159
KOTA KINABALU
SJP3024
KUCHING
QAB7469M
Last updated 17 Dec, 2025
Fuel Price
Petrol
RON 95
RM 2.64
-0.02
RON 97
RM 3.27
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.06
-0.02
EURO 5 B7
RM 3.26
-0.02
Last updated 11 Dec, 2025
Related News
KLIA's New Aerotrain Set To Be Operational in Q1 2025
KLIA’s new Aerotrain service is expected to be completed in January 2025.
17-07-2024
Anthony Loke: KLIA Shuttle Buses To Solve Aerotrain Operation Issues
YB Anthony Loke announced that the Kuala Lumpur International Airport (KLIA) shuttle buses between the main terminal and its satellite terminals would now operate around the clock.
09-01-2023
Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues
KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.
17-11-2025
KLIA Aerotrain Breaks Down Again; MOT, APAD Step In
KLIA’s Aerotrain is down again and the Transport Minister has told APAD to step in and probe MAHB’s handling of the issue.
28-10-2025
KLIA Aerotrain Breaks Down Hours After Back-in-Schedule Announcement
Fresh off nearly two weeks of “fine-tuning” maintenance to boost reliability, KLIA’s aerotrain stalled at 1.36PM, service only resumed at 5.38PM.
04-09-2025
Loke Reaffirms KLIA Aerotrain’s Safety After Tunnel Flooding, Door Incident
KLIA’s new Aerotrain is running safely, says Loke, with systems responding as designed during recent disruptions.
07-07-2025
KLIA Aerotrain Stalls After Downpour Causes Drainage Pump Malfunction
Just days after its grand relaunch, KLIA Aerotrain service was briefly halted when a faulty pump let rainwater flood its tunnel.
04-07-2025
KLIA Aerotrain Problems Go Beyond Simple Technical Glitches - Analyst
Experts say aerotrain issues run far deeper than simple glitches as KLIA runs a month-long overhaul to address underlying problems.
01-12-2025
Latest News
No More Heavy Vehicles On Kuala Terengganu Drawbridge From Jan 1
Heavy vehicles will no longer be allowed to use the Kuala Terengganu drawbridge from Jan 1.
16-12-2025
OMODA & JAECOO Wrap Up 2025 With Season of Rewards
OMODA & JAECOO 2025 Season of Rewards offers extended service packages and practical ownership benefits.
16-12-2025
Overloaded Trucks Crackdown Showing Results, Transport Rates Remain Stable
Strict enforcement against overloaded trucks is paying off, improving road safety and transport efficiency without hiking rates.
16-12-2025
Gemas-JB ETS Needs Better Access To Curb City Traffic - Expert
Experts urge improved first-mile access, feeder buses, and park-and-ride options for the Gemas- JB ETS.
16-12-2025
SCS Adopts Advanced European Testing Systems
SCS raises the bar for vehicle inspections with advanced European testing technology.
16-12-2025
Shah Alam LRT Launch Delayed To Avoid Another 2021 Kelana Jaya Crash
Prasarana delays the Shah Alam LRT opening, prioritising passenger safety and thorough testing after past LRT mishaps.
15-12-2025
Federal Highway Won’t Be Upgraded, Costs Deemed Too High
Despite worsening traffic conditions, the Federal Highway will not be upgraded, with the government citing high costs.
15-12-2025
Bollards Are There for Your Safety, Not Decoration - DBKL
DBKL is reminding the public that bollards play a crucial role in keeping pedestrians safe.
15-12-2025
Show More
trending_flat