Link Copiedcheck_circle
Auto News

Johor State Govt Mulls ART System Alongside RTS Link

Kumeran Sagathevan

Share via

Untitled-design-(2).jpg


The Johor state government is keen to implement an Autonomous Rapid Transit (ART) system in Johor Bahru. According to the state executive councillor (EXCO) Lee Ting Han, this new ART system will run alongside the new Rapid Transit System Link (RTS Link) to help reduce traffic congestion in the state capital.

However, Lee stated that the idea for an elevated ART system, which is set to go live in Sarawak, will first need to be evaluated by the Johor executive council during its weekly meeting before being tabled to the federal government.


Johor-ART-(2).jpeg


The urgency for improved transportation solutions in Johor is increasing, particularly when the RTS Link that connects Johor with Singapore begins operation.

With its construction going on at a rapid pace, the upcoming RTS link is expected to handle 10,000 passengers per hour in each direction hence potentially causing severe congestion in the city centre. The elevated ART system would help manage and distribute the influx of daily commuters effectively to better manage these congestion.

Lee also detailed that the proposed ART routes would align with the existing Iskandar Malaysia Bus Rapid Transit (IMBRT) project corridors. On its own, the IMBRT system, which  includes dedicated busways that connect key locations around the JB area, could face competition from other road users, possibly affecting its success.


Johor-ART-(1).jpgJohor-ART-(3).jpg


By proposing an elevated ART along these alignments, the state aims to partially utilise the lands that have already been acquired, facilitating a quicker commencement of construction once federal approval is secured.

Earlier this year, Transport Minister Anthony Loke indicated that the ministry would review Johor Bahru's need for an integrated public transport system to tackle its central congestion issues.


Source: MalayMail

Tagged:

autonomous rapid transit (ART)
ART Johor Bahru
Rapid Transit System (RTS) Link
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News

Kuching Urban Transportation System Anticipated To Commence In 2028

Full operation of the Kuching Urban Transport System (KUTS) project is expected to commence in 2028.

21-05-2025
Auto News

ART Trackless Trams Trial Run In Putrajaya Till 31 July - Free Rides Offered

PPj and MOT begin ART Trackless Tram trail run till July 31, and free rides are offered to gauge public reception.

Auto News

Faizal: Johor ART Necessary To Minimise RTS Station Congestion

The ART system in Johor Bahru can be an immediate solution to manage RTS Link congestion before completion of the LRT line.

Auto News

Sarawak Set To Become Asia's First Hydrogen-Powered Economy!

Sarawak to begin large-scale commercial production of green hydrogen by 2027 to promote renewable energy and minimise the region's carbon footprint.

Auto News

Sarawak State Govt. To Endorse Hydrogen-Powered ART Vehicles Including Buses

Sarawak state government has announced its plans to promote hydrogen-powered public vehicles among locals.

23-03-2023
Auto News

Faizal: Johor ART Necessary To Minimise RTS Station Congestion

The ART system in Johor Bahru can be an immediate solution to manage RTS Link congestion before completion of the LRT line.

Auto News

Cabinet Committee Set To Tackle Road Congestion and Safety in 2025

JK-MKKJR outlines major infrastructure and enforcement plans to reduce traffic issues and accidents.

Auto News

Five LRT3 Stations Set To Be Operational In 2027

Five Light Rail Transit Line 3 (LRT3) stations that were previously cancelled should be operational by 2027, says Loke.

11-01-2024

Latest News

Auto News

LATAR Interchange Opens, Direct Access To Eco Grandeur

The Eco Grandeur Interchange and Toll Plaza has officially opened, offering direct access through Exit 2502 to Eco Grandeur.

11-11-2025
Auto News

Penang Sentral Set to Become Mainland’s Integrated Transport Hub

The Butterworth KTM station, Mutiara Line LRT, and airport expansions will turn Penang Sentral into key transport and logistics hub.

Auto News

Six Bidders Eye Barrier-Free MLFF Toll System - Report

Six consortiums are reportedly competing to roll out Malaysia’s long-awaited MLFF toll system.

11-11-2025
Auto News

EV Ownership Risky, Battery Leasing Could Ease Depreciation Risks - Analysts

EVs can lose nearly half their value in five years, while high battery costs and limited infrastructure keep ownership risky.

11-11-2025
Auto News

PLUS To Close Two Bangi Ramps Nightly Until Nov 28

PLUS will close two ramps near Bangi nightly from 10PM to 5AM starting today until Nov 28.

10-11-2025
Auto News

KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance

KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.

10-11-2025
Auto News

4.4 Mil Old Vehicles Threaten Road Safety, Incentive Alone Insufficient

JPJ data shows over 4.4 million old vehicles are still on the road making up about 17% of the country’s 25.7m active vehicles.

10-11-2025
Auto News

JPJ Warns Public Against Fake “Free Driving Licence” TikTok Scams

JPJ has warned the public about fake TikTok posts claiming people can get free driving licences without any tests.

10-11-2025