Link Copiedcheck_circle
EV

Penang Eyes 600 EVCBs This Year, Includes New ChargeSini DCFC

Thoriq Azmi

Share via

web_ChargeSini_Lebuh-Gat-Cina-DCFC-60_Penang_-3.jpg

The Penang state government revealed today that it targets to establish 600 EV charging bays (EVCBs) by end of this year.


The Penang state government has targeted to establish up to 600 EV charging bays (EVCBs) by end of this year (2025). This was revealed during a ceremony held earlier today to officially launch the newest ChargeSini DC fast-charger (DCFC) in Penang.

Said target aligns with the federal government’s aim of establishing 10,000 EVCBs nationwide by end of this year too, explained YB H’ng Mooi Lye, Penang State EXCO member, who was present during the launch of the new ChargeSini DCFC facility mentioned.


web_ChargeSini_Lebuh-Gat-Cina-DCFC-60_Penang_-4.jpg

Said target was revealed by YB H’ng Mooi Lye, Penang State EXCO member (far right) earlier today whilst officially launching a new ChargeSini DCFC facility.


He adds that the Penang Island City Council (MBPP) have assessed the viability of establishing EVCBs across Penang island as part of this plan’s first phase, and have already noted limitations stemming from the limited available space.

In lieu of which, MBPP intends to convert existing parking spaces into EVCBs and make them more accessible to the public and EV users. This includes converting existing parking bays located at both MBPP complexes and on-street-parking spaces.

A quick check via MEVnet reveals that Penang currently has 344 active EVCBs primed across 278 location – MBPP has effectively achieved 50% completion of the target it announced. All are expected to become operational by April 2025, costing users RM1.09/kWh (AC) and RM1.19/kWh (DC).


web_MEVnet_Penang-EVCBs-March-13-2025.jpg

A quick check on MEVnet indicates that MBPP are essentially at 50% completion with their EVCB target announced.

web_ChargeSini_Lebuh-Gat-Cina-DCFC-60_Penang_-2.jpgweb_ChargeSini_Lebuh-Gat-Cina-DCFC-60_Penang_.jpg

The new ChargeSini DCFC station at Gat Lebuh Cina (in front of Digital Penang) is a prime example of MBPP's efforts of converting existing parking bays into EVCBs.


MBPP adds that 52 of which were recently established across 26 locations as of Jan 2025, and all are awaiting TNB power supply. Two of which are 22 kW AC charging units, while the remaining 50 units consists of 60 kW DCFC units.

Amongst the latest here is the new ChargeSini DCFC facility mentioned located at Gat Lebuh Cina (in front of Digital Penang). The facility features a 60 KW dual-gun DC charging station with dynamic load power dispensing abilities, and it costs users RM1.29/kWh.




Gallery

Tagged:

Penang Island City Council (MBPP)
ChargeSini
Electric Vehicle Charging Bay (EVCB)
EV charging stations
Share This Article

Written By

Thoriq Azmi

Former DJ turned driver, rider and story-teller. I drive, I ride, and I string words together about it all. [#FuelledByThoriq] IG: https://www.instagram.com/fuelledbythoriq/

Share via

Related News

Auto News
MBPP Pioneers Strata Scheme For Abandoned Vehicles

MBPP Pioneers Strata Scheme For Abandoned Vehicles

Penang city council (MBPP) pioneer’s Strata Scheme for Abandoned Vehicles in housing areas using e-Dereg system.

22-09-2025
Auto News
MOT, MBPP Setting Up Vehicle Disposal Facility In Penang

MOT, MBPP Setting Up Vehicle Disposal Facility In Penang

MOT and MBPP to set up an eco-friendly vehicle disposal hub in Penang to tackle the rising abandoned car problem.

28-07-2025
Auto News
Penang Increases Parking Rates By 50% To Combat Congestion

Penang Increases Parking Rates By 50% To Combat Congestion

MBPP recently announced that parking prices within its authority would be raised by 50%.

04-03-2025
Auto News
CNY 2025: 2.4 Million Vehicles Expected to Enter Penang

CNY 2025: 2.4 Million Vehicles Expected to Enter Penang

PDRM has estimated that over 2.4 million vehicles will enter Penang for this year’s Chinese New Year holidays.

27-01-2025
Auto News
Old Tree Care In Dense Cities Crucial To Mitigate Risk

Old Tree Care In Dense Cities Crucial To Mitigate Risk

Both DBKL and MBPP have been called to improve old tree care procedures to mitigate risk of falling trees, which could result in fatalities.

Auto News
Two-Hour Parking Limit To Ease Traffic Congestion In Penang

Two-Hour Parking Limit To Ease Traffic Congestion In Penang

Penang Island city council is considering a two-hour parking limit and smart traffic lights to ease traffic congestion.

19-03-2024
EV
No Rush, ChargeSini Extends Idle Grace Period to 30 Minutes

No Rush, ChargeSini Extends Idle Grace Period to 30 Minutes

ChargeSini now gives EV users up to 30 minutes after charging ends before idle fees apply, offering more flexibility in busy areas.

EV
Meta Bright, ChargeSini JV to Fast-Track EV Charger Rollout

Meta Bright, ChargeSini JV to Fast-Track EV Charger Rollout

Meta Bright teams up with ChargeSini to scale EV charging infrastructure nationwide.

Latest News

EV
ChargeSini & Meta Bright Spark Opens First JV Station at Sunway Pyramid, 6 AC Chargers @ RM1.09/kWh

ChargeSini & Meta Bright Spark Opens First JV Station at Sunway Pyramid, 6 AC Chargers @ RM1.09/kWh

First ChargeSini - Meta Bright JV charger goes live at Sunway Pyramid - 6 AC points, RM1.39/kWh, now with a 30-min idle grace period.

EV
Careplus Eyes Multi-OEM EV Assembly Platform

Careplus Eyes Multi-OEM EV Assembly Platform

Careplus maintains timeline for Negeri Sembilan NEV hub, reinforcing confidence in its shift towards local EV assembly.

EV
Jaecoo J5 EV Launched in Indonesia – Est. From RM62K, Malaysia Next?

Jaecoo J5 EV Launched in Indonesia – Est. From RM62K, Malaysia Next?

Indonesia becomes the next RHD market to debut the Jaecoo J5 EV, with prices starting from only RM62,949.

04-11-2025
EV
Xpeng Surpasses 2025 Sales Target — 355,209 Units Sold as of Oct 2025

Xpeng Surpasses 2025 Sales Target — 355,209 Units Sold as of Oct 2025

China’s Xpeng exceeded its 2025 sales target two months earlier, with 355,209 units sold as of October 2025.

04-11-2025
EV
No Rush, ChargeSini Extends Idle Grace Period to 30 Minutes

No Rush, ChargeSini Extends Idle Grace Period to 30 Minutes

ChargeSini now gives EV users up to 30 minutes after charging ends before idle fees apply, offering more flexibility in busy areas.

EV
China’s Hyundai Elexio EV Heads to Australia – Malaysia Next?

China’s Hyundai Elexio EV Heads to Australia – Malaysia Next?

The then China-only Hyundai Elexio EV is heading to the Australian market. Is Malaysia next on the list?

03-11-2025
EV
SEMA 2025: Toyota Previews 400+ HP bZ Time Attack Concept

SEMA 2025: Toyota Previews 400+ HP bZ Time Attack Concept

Lower, wider, and packing over 400 hp, Toyota’s first all-electric SEMA build redefines the bZ platform’s performance potential.

EV
TnG eWallet Introduces Malaysia-Singapore Cross-Border EV Charger Roaming

TnG eWallet Introduces Malaysia-Singapore Cross-Border EV Charger Roaming

Touch ‘n Go eWallet introduces a cross-border EV charger roaming service between Malaysia and Singapore.

31-10-2025