Two Million Road Users Set To Enjoy Toll-Free LTU
When the toll-free Lingkaran Tengah Utama (LTU) Expressway, formerly known as the Central Spine Road (CSR), is completed in 2026, it is expected to benefit two million road users, particularly during festive seasons.
Deputy Works Minister Datuk Seri Abdul Rahman Mohamad said the highway, in addition to being toll-free, would help speed up travel time from Kuala Lumpur to Kelantan, saving money on gasoline.
“This highway will surely benefit those who carry out business activities and motorists wishing to return to their hometowns during festive celebrations. The LTU will also help traders to transport their goods from Kelantan to Port Klang in a short time,” he said.
Photo credit: Bernama
Datuk Mohammad Fakhruddin Mohd Ariff, chairman of the Pahang Works, Transport, and Health Committee, and Datuk Zulkipli Nasri, deputy director-general of the Public Works Department, were also present (Infrastructure Sector).
The LTU is a high-impact Ministry of Works project that includes six packages spanning over 300 kilometres (km) from Kelantan to Pahang, with a total budget of RM10 billion.
Section 3J, for example, calls for the construction of a new four-lane, two-way road stretching 6.95 kilometres from Kampung Seberang Jelai to Kampung Relong, as well as the construction of five bridges, which are expected to be completed in July 2024.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPG2547
SELANGOR
BSF4636
JOHOR
JYA4127
PULAU PINANG
PRR4585
PERAK
ANW6146
PAHANG
CFC1085
KEDAH
KGA9165
NEGERI SEMBILAN
NEG2184
KOTA KINABALU
SJL2751
KUCHING
QAB5048L
Last updated 16 Jun, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.07
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.74
EURO 5 B7
RM 2.94
Last updated 12 Jun, 2025
Related News
Four Temporary R&R Stops will be Built on LTU Highway
The Pahang state government is planning to build four temporary R&R stops along the Central Spine Road (LTU).
20-03-2025
Gua Musang Main Routes Closed For A Month For Lingkaran Tengah Project
The main entrances to Gua Musang were closed for a month beginning yesterday for the installation of bridge piles for the Lingkaran Tengah Utama Project (LTU).
31-03-2023
Central Spine Road Connecting Pahang To Kelantan 63.35% Complete
300 KM Central Spine Road is 63.35% complete with fourteen projects under construction.
25-07-2024
Maslan: Festive Toll Exemptions May Return; MIC Backs Chinese Community's Call
Maslan hints at revisiting festive toll exemptions as MIC also advocates for the Chinese community’s entitlement to free tolls.
24-01-2025
CNY 2024: Toll Free Travel From 8 To 9 February
The Public Works Minister has announced a toll free travel period from 8 to 9 Feb in conjunction with the upcoming Chinese New Year celebrations.
07-02-2024
Christmas: Toll-Free Travel On December 23 And 26
KKR has declared that highway travel will be free of tolls for two days, on December 23 and 26 for christmas.
21-12-2023
Maslan : Toll Exemption For Deepavali Holidays Still Being Discussed
Proposal to grant toll exemption in conjunction with the upcoming Deepavali celebration this weekend is still in the process of being discussed
07-11-2023
Latest News
PLUS Opens Three New Lanes At Rawang Selatan Toll Plaza
PLUS has announced the addition of three new lanes at the Rawang Selatan toll plaza (Exit 115).
16-06-2025
RON95 Petrol Subsidy Rationalisation Will Proceed – PMX
The government will proceed with the RON95 fuel subsidy rationalisation, says Prime Minister Anwar Ibrahim.
16-06-2025
Car Wash Worker Severely Injured After Vehicle Plunges From 3rd Floor
A car wash worker driving a customer’s Toyota Camry crashed through the wall of a building in Old Klang Road on Sunday.
16-06-2025
Roslan Abdullah Joins GWM Malaysia As New COO
Former deputy CEO of Proton Roslan Abdullah appointed as new COO at GWM Malaysia.
16-06-2025
Mustang, BMW Owners Caught With Expired Road Tax, Citing Financial Issues
Financial issues cited by Mustang and BMW X5 owners caught with expired road tax during JPJ operation.
16-06-2025
Nanta: Damaged Road Surface Linked to Cyclist’s Death
Road damage blamed on heavy lorry traffic; urgent repairs ordered following fatal crash.
16-06-2025
Gerik Crash: No signs Of Brake, Steering Failure
Preliminary investigations into the fatal June 9 bus crash in Gerik, have not revealed any technical malfunctions.
15-06-2025
Gerik Crash: Motac Urges Return Of Authority Over Tourism Vehicles
In response to the fatal bus crash involving UPSI students, Motac aimed to regain control over tourism transport for safety reasons.
13-06-2025
Show More
trending_flat