Government Is Urged To Turn KTM Route Into Non-Stop Shuttle Service
The government is being urged to convert the Keretapi Tanah Melayu Bhd (KTMB) scheduled train service into a nonstop shuttle train in order to alleviate congestion at the Customs, Immigration, and Quarantine (CIQ) Complex in Bangunan Sultan Iskandar, Johor Bahru.
Sheikh Abdullah Md Taufek, chairman of the Johor City and Nature Tour Guide Association, told The Star that this was one of the best short-term solutions while waiting for the revival of the high-speed rail network between Kuala Lumpur and Singapore (KL-SG HSR).
“Even the Johor Bahru-Singapore Rapid Transit System (RTS) Link is expected to start operations only at the end of 2026.
“We need to address the issue now and not hope it will be solved later when these major projects are completed as a long-term solution.
"We need to develop a short-term strategy," he said when reached by StarMetro.
According to Sheikh Abdullah, converting the train service between the Woodlands checkpoint and JB Sentral into a non-stop shuttle service could reduce the number of vehicles passing through the Causeway.
“I applaud the effort made by Johor Mentri Besar Datuk Onn Hafiz Ghazi in reducing the daily waiting time at the Causeway and Second Link by at least two hours.
“But the waiting time is still very long, and we are not even talking about the holiday season,” he said, adding that the Singapore and Malaysia governments should look into this.
When asked about the tourism impact of the KL-SG HSR on Johor, Sheikh Abdullah stated that the impact would be felt only in the long run in terms of development.

He also believes that future KL-SG HSR users will come from outside of Kuala Lumpur.
"Those who want to spend their time solely in Johor will continue to use the RTS, Causeway, and Second Link, or fly."
"We can only have a direct impact on our economy once we reduce congestion at the Causeway," he explained.
Previously, Onn Hafiz was quoted as saying that the state was confident of reducing daily traffic congestion at the Causeway and Second Link.
There have been recent reports of plans to resurrect the KL-SG HSR project, which was cancelled by the Federal Government in 2021, with Malaysia paying Singapore RM320 million in compensation.
Source: The Star
Gallery
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VRQ4238
SELANGOR
BST7549
JOHOR
JE3918J
PULAU PINANG
PSF6029
PERAK
APL5208
PAHANG
CFH7543
KEDAH
KGJ1430
NEGERI SEMBILAN
NEL8759
KOTA KINABALU
SJU1567
KUCHING
QAB5763P
Last updated 19 Sep, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
KTM Double-Track Klang Line Set For March Completion
KTM’s Klang Valley double-track upgrade between Subang Jaya and Klang is expected to be completed by March.
21-01-2026
Fallen Tree Disrupts KTMB Services Again, Safety Concerns Grow
Another track obstruction has caused major delays on KTM routes, renewing concerns over tree management and rail safety.
08-01-2026
KTMB Targets 1.2 Million ETS3 Passengers in 2026, MySawasdee Service Resumes
KTMB targets 1.2 million passengers for its new ETS3 this year, while the MySawasdee train service to Hatyai now resumes.
05-01-2026
KTMB Southern Express Ends Service As ETS Takes Over
KTMB will end the Southern Express on the Gemas–JB Sentral route from Jan 1 to make way for eight daily ETS trips.
30-12-2025
KTMB Expands ETS, East Coast Rail Services From Jan 1
KTMB expands train services nationwide with new ETS and East Coast routes starting Jan 1.
17-12-2025
New KTM Komuter Timetable Starts Jan 1 Amid Track Works
KTMB will roll out a revised KTM Komuter schedule from Jan 1 due to ongoing KVDT2 works.
15-12-2025
Gemas-JB Electrified Train Cuts KL-Johor Travel To 4 Hours
The new electrified Gemas-Johor Bahru train line slashes travel time from KL to Johor to just 4 hours 20 minutes.
12-12-2025
KTMB’s ETS3 To JB Sentral Launches Dec 12 with 30% Discount
KTMB will start operating its ETS3 to JB Sentral on 12 Dec 202 with a 30% discount for travel on this route.
09-12-2025
Latest News
Perodua Ativa X Is Now RM53K - Would You Still Buy A Myvi?
The Perodua Ativa X is now RM53,000 after a RM9,500 rebate, just RM1,900 below the Myvi 1.5 H. Here's what you get with each.
17-09-2026
BUDI Diesel Can Now Be Transferred Beyond Family - Here's How It Works
BUDI Diesel eligibility can now be transferred beyond immediate family to the actual vehicle user. Here's who qualifies, how to apply and the Sept 27 deadline.
17-09-2026
Puspakom Has More Rivals Now. So Why Aren't Car Inspections Getting Cheaper?
Puspakom now has rivals for M.V.15 ownership transfer inspections, but fees won't get cheaper. Here's why JPJ is keeping rates standardised.
15-09-2026
If You're In Penang And Eyeing A Suzuki, There's A New Showroom To Check Out
Suzuki has opened a new RM1 million dealership in Juru, Penang, expanding its Malaysian network to 14 sales outlets and 13 service centres.
14-09-2026
Malaysia Has More Car Brands Than Ever. So Why Do We Still Choose Proton And Perodua?
Proton and Perodua account for nearly 63% of Malaysia's new car registrations in 2026. Here's why national brands still dominate despite growing competition.
14-09-2026
40,595 Summonses, RM12.18 Million Unpaid. JPJ's Patience Is Running Out
JPJ has given 945 transport companies 14 days to settle 40,595 outstanding summonses worth RM12.18 million or face tougher enforcement.
11-09-2026
Use The Kelana Jaya LRT? Here's Why Some Stations Won't Open Until 9.30AM
Kelana Jaya LRT track replacement works run from Sept 2026 to Sept 2027. Check the affected stations, Sunday dates and 9.30AM opening times.
10-09-2026
Your Car's Windscreen Isn't Just Glass, And This Crash Test Shows Why
Malaysia's first live windscreen crash test at MIROS shows why proper installation, adhesive and curing time matter for vehicle safety.
10-09-2026
Show More
trending_flat