Public Transport Ridership In KL Hits New High In July - PRASARANA
The latest data from the Transport Ministry show that public transportation ridership in the Klang Valley increased by 11% in July. Overall, bus and rail ridership increased by 11.8% and 10.8%, respectively, last month, indicating a growing reliance on public transportation.
The number of rail users has increased significantly with the addition of new trains, and passenger waiting times have improved, according to operator Prasarana Malaysia Bhd, which spoke with The Star.
“The Kelana Jaya Line is now operating with 56 trains with a frequency of three minutes. In 2022, Kelana Jaya Line was operating 41 trains with a frequency of 4.1 minutes during peak hours.”
This is evidenced by a significant increase in passenger numbers on both the Ampang and Kelana Jaya Light Rail Transit (LRT) lines, with Kelana Jaya up 15.3% in July and Ampang up 8.3%.
The Mass Rapid Transit (MRT) Kajang and Putrajaya lines have also seen increased ridership, contributing to the overall upward trend. In July, ridership increased by 11.1% on the MRT Kajang line and 15.7% on the MRT Putrajaya line. “The Kajang Line operates with 39 trains with a frequency of four minutes. In 2022, the line was operating 28 trains with a frequency of 5.6 minutes during peak hours,” said Prasarana.
The KTM Komuter and monorail services are also seeing more passengers, at 3.6% and 4.4%, respectively, indicating a broader shift toward public transportation.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPG3497
SELANGOR
BSF4838
JOHOR
JYA4553
PULAU PINANG
PRR4758
PERAK
ANW6434
PAHANG
CFC1277
KEDAH
KGA9315
NEGERI SEMBILAN
NEG2297
KOTA KINABALU
SJL2913
KUCHING
QAB5083L
Last updated 17 Jun, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.07
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.74
EURO 5 B7
RM 2.94
Last updated 12 Jun, 2025
Related News
KL Monorail Lift Upgrades At five stations Completed, Other six Due By May
Lifts at five monorail stations are operational; the remaining lifts and one escalator at six stations will be operational by May.
20-05-2025
Prasarana Targets One Million KM, One Disruption Reliability Rate By 2026
Prasarana targets just one disruption per million KM reliability rate by 2026 on the onset of increased ridership and revenue.
17-01-2025
Men Will Face Fines For Travelling In Women-Only Carriages - Loke
The government is now working on legislation that would penalize men for entering pink coaches on public transportation, says Anthony Loke.
15-08-2024
RapidKL Is Upgrading The LRT, MRT & Monorail Audio System
RapidKL is upgrading the LRT, MRT and Monorail audio system in phases prior to the MRT Putrajaya Line Phase 2 opening.
07-03-2023
Loke: Titiwangsa Terminal Will Become Main Public Transport Hub
Titiwangsa Terminal is expected to become the main public transport hub connecting LRT, MRT, Monorail, and buses.
09-02-2023
Anthony Loke: 3 Minute LRT Interval & Full Operational System By June 2023
He however assured the public that all 56 trains will be fully operational by the third quarter of 2023.
09-12-2022
Rapid KL MyJourney Campaign Offering Free Rides Till 28 February 2023
Rapid KL is offering redeemable free rides through its Rapid KL MyJourney campaign. This applied to all rail services be it the LRT, MRT or Monorail.
17-11-2022
Six In 10 Rail Users In Klang Valley Are Female - Loke
The Transport Ministry says 60% of peak-hour train commuters in the Klang Valley are women.
19-02-2025
Latest News
PLUS Opens Three New Lanes At Rawang Selatan Toll Plaza
PLUS has announced the addition of three new lanes at the Rawang Selatan toll plaza (Exit 115).
16-06-2025
RON95 Petrol Subsidy Rationalisation Will Proceed – PMX
The government will proceed with the RON95 fuel subsidy rationalisation, says Prime Minister Anwar Ibrahim.
16-06-2025
Car Wash Worker Severely Injured After Vehicle Plunges From 3rd Floor
A car wash worker driving a customer’s Toyota Camry crashed through the wall of a building in Old Klang Road on Sunday.
16-06-2025
Roslan Abdullah Joins GWM Malaysia As New COO
Former deputy CEO of Proton Roslan Abdullah appointed as new COO at GWM Malaysia.
16-06-2025
Mustang, BMW Owners Caught With Expired Road Tax, Citing Financial Issues
Financial issues cited by Mustang and BMW X5 owners caught with expired road tax during JPJ operation.
16-06-2025
Nanta: Damaged Road Surface Linked to Cyclist’s Death
Road damage blamed on heavy lorry traffic; urgent repairs ordered following fatal crash.
16-06-2025
Gerik Crash: No signs Of Brake, Steering Failure
Preliminary investigations into the fatal June 9 bus crash in Gerik, have not revealed any technical malfunctions.
15-06-2025
Gerik Crash: Motac Urges Return Of Authority Over Tourism Vehicles
In response to the fatal bus crash involving UPSI students, Motac aimed to regain control over tourism transport for safety reasons.
13-06-2025
Show More
trending_flat