KTMB Provides Extra ETS Trains For CNY 2025
In conjunction with the Chinese New Year celebrations, Keretapi Tanah Melayu Berhad (KTMB) will add two more Electric Train Service (ETS) trains for the KL Sentral-Padang Besar route and return trips. The KTMB statement stated that tickets for these extra trains will be available for purchase today, January 3, at 10 a.m., for travel from January 17 to February 16.
“The additional trains will operate for 19 days, offering 630 seats daily, including business class facilities, with 11,970 seats available.
“The additional train will depart from KL Sentral at 5 pm, arriving in Padang Besar at 10.20 pm. Meanwhile, the train from Padang Besar will depart at 11.05 am, arriving in KL Sentral at 4.30 pm,” it said.
KTMB announced that tickets can be bought cashless through www.ktmb.com.my or the KTM Mobile (KITS) app. Passengers can visit KTMB's official social media accounts or call the Call Centre at 03-9779 1200 with any more questions.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQA3741
SELANGOR
BSK2329
JOHOR
JYL2465
PULAU PINANG
PRV7492
PERAK
APC5658
PAHANG
CFE1746
KEDAH
KGD566
NEGERI SEMBILAN
NEH6170
KOTA KINABALU
SJN6906
KUCHING
QAB5294M
Last updated 18 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.65
+0.05
RON 97
RM 3.25
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.07
+0.05
EURO 5 B7
RM 3.27
+0.05
Last updated 13 Nov, 2025
Related News
KTMB Expands Open Mode Gates In Selected Stations
Keretapi Tanah Melayu Berhad (KTMB) is rolling out its Open Mode gate system at more stations.
15-10-2025
KTMB and SRT Trials MySawasdee Cross-Border Tourist Train
KTMB and SRT complete Padang Besar-Surat Thani rail trials, paving way for expanded MySawasdee service.
06-10-2025
KTMB Adds Extra ETS Trips For Deepavali Travel Rush
KTMB will operate additional ETS services between Padang Besar and KL Sentral from Oct 17 to 22.
06-10-2025
KTMB Adds Weekend ETS Trips Between Kluang, KL Sentral
Starting Oct 10, KTMB will offer new weekend ETS services from Kluang to KL Sentral.
03-10-2025
Honda Malaysia Provides e:N1 EVs for the 45th ASEAN Railways CEOs’ Conference
Honda Malaysia has partnered with KTMB to provide 25 units of the e:N1 for the 45th ASEAN Railways CEOs’ Conference.
09-09-2025
KTMB Targets Bangkok Route Revival, Rail Links To China
KTMB’s acting CEO sets sights on reviving the Bangkok route and expanding Malaysia’s rail links to China and beyond.
02-09-2025
KTMB’s MyRailLife Pass Clocked Over 628,000 Free Rides
KTMB’s MyRailLife Pass has clocked over 628,000 free rides for students and persons with disabilities this year.
15-08-2025
KTMB and SRT to Revive Iconic Bangkok–Butterworth Rail Link
Malaysia and Thailand agree to revive the Bangkok–Butterworth rail route.
14-08-2025
Latest News
Leapmotor B10 Open For Bookings – Est. From RM110,000
Early bookings now opened for upcoming new Leapmotor B10 EV C-SUV with estimate starting price of RM110,000.
17-11-2025
MTSB Memorandum Set to Be Presented to Cabinet Soon – Loke
The memorandum for the Malaysian Transport Safety Board will be presented to the Cabinet soon, says Transport Minister Anthony Loke.
17-11-2025
Mitsubishi Destinator Earns 5 Stars ASEAN NCAP Rating
Mitsubishi’s all-new Destinator secures 5-star ASEAN NCAP rating, reinforcing its readiness for the region.
17-11-2025
Malaysia Autoshow Expands With Penang And Johor Editions In 2026
Malaysia Autoshow by MARii expands with Penang and Johor editions in 2026.
17-11-2025
Three Laws To Be Updated For MLFF Toll System - Ahmad Maslan
The government will revise key road laws before launching the Multi-Lane Free Flow (MLFF) system.
17-11-2025
Gua Musang-Jeli Road To Reopen By Month-End After Sinkhole Repairs
KM 11.95 of the Gua Musang-Jeli Road is being repaired after a sinkhole and landslide.
17-11-2025
RTS Link: First Train Arrives In Johor, Testing Kicks Off At Wadi Hana Depot
Train Set 02 has arrived at Wadi Hana Depot, marking the start of critical testing and commissioning.
17-11-2025
Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues
KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.
17-11-2025
Show More
trending_flat