Penang Eyes 600 EVCBs This Year, Includes New ChargeSini DCFC
The Penang state government revealed today that it targets to establish 600 EV charging bays (EVCBs) by end of this year.
The Penang state government has targeted to establish up to 600 EV charging bays (EVCBs) by end of this year (2025). This was revealed during a ceremony held earlier today to officially launch the newest ChargeSini DC fast-charger (DCFC) in Penang.
Said target aligns with the federal government’s aim of establishing 10,000 EVCBs nationwide by end of this year too, explained YB H’ng Mooi Lye, Penang State EXCO member, who was present during the launch of the new ChargeSini DCFC facility mentioned.
Said target was revealed by YB H’ng Mooi Lye, Penang State EXCO member (far right) earlier today whilst officially launching a new ChargeSini DCFC facility.
He adds that the Penang Island City Council (MBPP) have assessed the viability of establishing EVCBs across Penang island as part of this plan’s first phase, and have already noted limitations stemming from the limited available space.
In lieu of which, MBPP intends to convert existing parking spaces into EVCBs and make them more accessible to the public and EV users. This includes converting existing parking bays located at both MBPP complexes and on-street-parking spaces.
A quick check via MEVnet reveals that Penang currently has 344 active EVCBs primed across 278 location – MBPP has effectively achieved 50% completion of the target it announced. All are expected to become operational by April 2025, costing users RM1.09/kWh (AC) and RM1.19/kWh (DC).
A quick check on MEVnet indicates that MBPP are essentially at 50% completion with their EVCB target announced.
The new ChargeSini DCFC station at Gat Lebuh Cina (in front of Digital Penang) is a prime example of MBPP's efforts of converting existing parking bays into EVCBs.
MBPP adds that 52 of which were recently established across 26 locations as of Jan 2025, and all are awaiting TNB power supply. Two of which are 22 kW AC charging units, while the remaining 50 units consists of 60 kW DCFC units.
Amongst the latest here is the new ChargeSini DCFC facility mentioned located at Gat Lebuh Cina (in front of Digital Penang). The facility features a 60 KW dual-gun DC charging station with dynamic load power dispensing abilities, and it costs users RM1.29/kWh.
Gallery
Written By
Thoriq Azmi
Former DJ turned driver, rider and story-teller. I drive, I ride, and I string words together about it all. [#FuelledByThoriq] IG: https://www.instagram.com/fuelledbythoriq/
JPJ Running Numbers
KUALA LUMPUR
VPR2060
SELANGOR
BSH5240
JOHOR
JYG2159
PULAU PINANG
PRT7204
PERAK
APA8539
PAHANG
CFD3844
KEDAH
KGC1372
NEGERI SEMBILAN
NEG9283
KOTA KINABALU
SJM4591
KUCHING
QAB1040M
Last updated 30 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.16
+0.03
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.88
+0.03
EURO 5 B7
RM 3.08
+0.03
Last updated 28 Aug, 2025
Related News
MOT, MBPP Setting Up Vehicle Disposal Facility In Penang
MOT and MBPP to set up an eco-friendly vehicle disposal hub in Penang to tackle the rising abandoned car problem.
28-07-2025
Penang Increases Parking Rates By 50% To Combat Congestion
MBPP recently announced that parking prices within its authority would be raised by 50%.
04-03-2025
CNY 2025: 2.4 Million Vehicles Expected to Enter Penang
PDRM has estimated that over 2.4 million vehicles will enter Penang for this year’s Chinese New Year holidays.
27-01-2025
Old Tree Care In Dense Cities Crucial To Mitigate Risk
Both DBKL and MBPP have been called to improve old tree care procedures to mitigate risk of falling trees, which could result in fatalities.
14-05-2024
Two-Hour Parking Limit To Ease Traffic Congestion In Penang
Penang Island city council is considering a two-hour parking limit and smart traffic lights to ease traffic congestion.
19-03-2024
Meta Bright, ChargeSini JV to Fast-Track EV Charger Rollout
Meta Bright teams up with ChargeSini to scale EV charging infrastructure nationwide.
12-07-2025
Meta Bright Aligns with ChargeHere in Green Energy Push
Meta Bright and ChargeHere teams up, jointly seeking to accelerate EV charging infrastructure in Malaysia.
23-05-2025
PRO-NET Partners ChargeSini,Other CPOs, For EV Charging At Condos
PRO-NET partners ChargeSini and other leading CPOs to bring affordable, convenient EV charging to over 1,000 high-rises across Malaysia.
07-05-2025
Latest News
PEARL 2.0 App Integrates ChargeSini to Power Penang’s EV Push
Penang’s upgraded PEARL One Touch app now lets users find and pay for ChargeSini EV charging.
30-08-2025
Tesla Model Y Performance – 460 HP, 580 KM WLTP, 3.5s Sprint, From RM370K
Tesla Model Y Performance debuts with 460 HP, a 580 KM WLTP range, and ability to hit 0–100 KM/H in just 3.5 secs.
29-08-2025
Launched: QJMotor E-LTR E-Scooter – 70 KM/H V-Max, 105 KM Range, RM6,999
MForce brings another e-scooter to market through new QJMotor E-LTR priced at RM6,999, boasting up to 105 KM range too.
28-08-2025
Pro-Net Hands Over EV Fleet to Ministry of Transport
Pro-Net puts EVs in MOTs hands, aims for them to help to shape the future of EV policies and infrastructure.
28-08-2025
BYD YangWang U9 Track Edition Charts New EV Top Speed Record
At 472.41 km/h, the BYD YangWang U9 Track Edition dethrones the Rimac Nevera R as the fastest EV in the world.
27-08-2025
BYD Ships Thai-Assembled EVs to Europe, Malaysia Next in Line?
BYD has begun exporting Thai-assembled Dolphins to Europe, highlighting Southeast Asia’s rising role in its global strategy.
27-08-2025
XPeng XOS 5.8.0 OTA Update Brings Human-Machine Co-Driving & Pet Mode
New XPeng XOS 5.8.0 OTA update adds Human-Machine Co-Driving, Pet Mode and other market-specific upgrades.
27-08-2025
Married Couple Wins Proton e.MAS 5 Grand Prize
Proton e.MAS 5 grand prize awarded to married couple after winning the ‘Electrify Your Life Contest’ held by PRO-NET.
26-08-2025
Show More
trending_flat