RON95 Petrol Subsidy Rationalisation Will Proceed – PMX
The government will proceed with the RON95 fuel subsidy rationalisation, says Prime Minister Anwar Ibrahim.
The Malaysian government will proceed with the RON95 fuel subsidy rationalisation, as it is crucial for the country, says Prime Minister Datuk Seri Anwar Ibrahim.
Speaking to NST, Anwar, who is also the Finance Minister, said there is no issue of a RON95 price increase affecting the majority of Malaysians.
PMX also further insisted that the implementation of the subsidy rationalisation would ensure sufficient resources to assist the poor, enhance the quality of education, and provide better public services, including healthcare.
"Whatever the opposition says is just a gimmick, a desperate attempt to portray the people as suffering, to fuel more negative narratives. What we need are positive and encouraging developments to propel our economy forward.”
There is no issue of a fuel price hike for the vast majority, 85 to 90 percent of our population," he told NST after officiating Energy Asia 2025 in Kuala Lumpur today.
Prior to this statement, PMX previously insisted that the RON95 petrol price would not go up for Malaysians, and any future price changes would be based on market conditions instead.
To ensure this subsidy rationalisation implementation is fair, the government has also decided to use MyKad, citing its effective use in the Sumbangan Asas Rahmah (SARA) aid program.
While the plan promises to ensure sufficient resources go to the right place, the Petroleum Dealers Association of Malaysia (PDAM) has urged the government to postpone them, at least until significant challenges affecting the sustainability of petrol stations are resolved.
PDAM president Khairul Annuar Abdul Aziz pointed out that the dealer profit margins, set by the automatic pricing mechanism, have remained unchanged since 2019 and are now insufficient to cover actual operating expenses.
Gallery






Written By
Mukhlis Azman
An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman
JPJ Running Numbers
KUALA LUMPUR
VPS2448
SELANGOR
BSH7417
JOHOR
JYG6345
PULAU PINANG
PRT9872
PERAK
APB2057
PAHANG
CFD4686
KEDAH
KGC2710
NEGERI SEMBILAN
NEH1090
KOTA KINABALU
SJM5854
KUCHING
QAB1588M
Last updated 16 Sep, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.18
+0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.90
+0.02
EURO 5 B7
RM 3.10
+0.02
Last updated 11 Sep, 2025
Related News
SSLR2 Highway Launched: RM7.6b Project Will Link Sarawak and Sabah
The 335km Sarawak–Sabah Link Road Phase 2 will connect key towns across northern Sarawak into Sabah.
12-09-2025
PMX: Proton’s International Success a Model for Malaysia
PM Datuk Seri Anwar Ibrahim says Proton’s success abroad in Egypt proves the brand is ready to expand into more markets.
04-09-2025
Delayed EKVE Phase One Finally Opened With 30-Day Toll-Free Span
Phase one of EKVE finally opens six years behind schedule, concessionaires offer 30-day toll-free run.
29-08-2025
Anwar: Luxury Assets Will Be Factored In For RON95 Subsidy
PM Anwar says ownership of luxury good, properties and vehicles will be considered alongside income in determining who qualifies for RON95 subsidy.
20-08-2025
MoF: Fuel Subsidy Rollout Under Testing, Launches End-Sept
MoF is finalising the targeted fuel subsidy system, with full rollout details expected by end-Sept.
05-08-2025
PR Spouses Sidelined From RON95 Fuel Subsidy
PR spouses raising Malaysian children will reportedly soon be paying more for RON95.
31-07-2025
PM: M40 Will Benefit From Cheaper Fuel, Frozen Toll Rates
PM Datuk lo Seri Anwar Ibrahim reassured that fuel and toll savings are now reaching the M40 group.
25-07-2025
Toll Rates for 10 Highways Will Not Be Increased – PMX
Prime Minister Datuk Seri Anwar Ibrahim announced that toll rates for 10 highways will not be increased in the near future.
23-07-2025
Latest News
East-West Rail Link Across Titiwangsa Could Take 10-20 Years - Nanta
The east-west rail project crossing the Titiwangsa Range could take 10 to 20 years to complete.
16-09-2025
CAAM, MET Malaysia Inks Deal To Boost Flight Safety
CAAM and MET Malaysia have signed a new agreement to enhance aviation safety and operational efficiency.
16-09-2025
GM Number Plate Series Launched for Malaysia Day 2025
JPJ marks Malaysia Day 2025 with the launch of the GM number plate series, symbolising Gemilang Malaysia.
16-09-2025
GWM Wey 80 Teased Again, Now Renamed ‘Wey G9’ Instead
Upcoming GWM Wey 80 teased on social media, now bearing new ‘Wey G9’ nameplate too.
15-09-2025
Proton Iriz Production Ends – No Successor Planned, But Should There Be One?
Proton Iriz hatch production ends without a successor, leaving automaker without a new hatch model since 1994.
12-09-2025
West Ipoh Span Expressway Construction Will Begin After 2026
Construction of the West Ipoh Span Expressway is set to start after 2026, providing an alternative to the busy Menora Tunnel route.
12-09-2025
SSLR2 Highway Launched: RM7.6b Project Will Link Sarawak and Sabah
The 335km Sarawak–Sabah Link Road Phase 2 will connect key towns across northern Sarawak into Sabah.
12-09-2025
Proton: We Are Prepared To Serve New X50 After Sales In East Malaysia
Proton reassures it is more than capable of handling after sales coverage for face-lifted new X50 model in East Malaysia.
12-09-2025
Show More
trending_flat