ETS to JB Sentral ‘On Track’, But Not Quite There Yet

Train commuters hoping to ride the Electric Train Service (ETS) all the way to Johor Bahru will need to hold on a little longer. Despite earlier hopes for an August launch, the southern stretch of the line particularly from Kluang to JB Sentral still has significant work left to complete.
A recent inspection by The Star along the 180km alignment between Segamat and JB Sentral revealed that key electrification and signalling infrastructure are still unfinished. The 100KM stretch between Kluang and Johor Bahru, in particular, remains a major bottleneck.
In some areas near JB Sentral, only basic pole structures have been erected. The critical catenary system, which includes contact wires and other components of the overhead line equipment (OHLE) is still missing in several sections.

Experts say installing, testing, and commissioning this OHLE system is a time-consuming process that includes multiple steps such as tensioning, energisation, and safety checks.
While the full 192KM stretch from Gemas to JB was initially touted to be ready this year, progress appears slower than expected. ETS services from Gemas to Segamat began operations back in March, but no tickets beyond Segamat have been offered since.
In response to growing public concern, KTMB has issued a statement reaffirming its commitment to completing the southern ETS expansion. The rail operator stressed that the rollout is being done in phases and is still on track, pending technical and regulatory milestones.

KTMB said trial runs are currently underway on the next stretch between Segamat and Kluang. If all goes well, this segment could be opened next, possibly using existing ETS train sets, provided regulatory approvals come through.
In the background, KTMB is also testing new ETS train sets from China. The first of these, known as the “golden train,” must log at least 8,000 fault-free kilometres before it can enter commercial service, a standard requirement to ensure system integrity.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQA2396
SELANGOR
BSK1953
JOHOR
JYL1735
PULAU PINANG
PRV7106
PERAK
APC5320
PAHANG
CFE1654
KEDAH
KGD248
NEGERI SEMBILAN
NEH6071
KOTA KINABALU
SJN6727
KUCHING
QAB5213M
Last updated 16 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.65
+0.05
RON 97
RM 3.25
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.07
+0.05
EURO 5 B7
RM 3.27
+0.05
Last updated 13 Nov, 2025
Related News
Govt Plans to Add 50 New Train Sets for KTM ETS & Komuter Services
The government is planning to add 50 new train sets to meet growing demand for KTM ETS & Komuter services.
25-08-2025
Sultan Ibrahim Test-Drives ETS Train KL-Rawang
His Majesty Sultan Ibrahim took the controls of KTMB’s ETS for a test run from Kuala Lumpur to Rawang.
20-08-2025
Two Of 10 New ETS Train Sets Delivered To KTMB
Two of 10 new ETS sets, valued at RM400 million, have already been delivered to KTMB.
06-06-2025
KTM ETS Train Service To Segamat Starts March 15th
ETS train service extends to Segamat from March 15th due to partial completion of the Gemas-Johor Bahru rail project.
13-03-2025
MoT Set to Add 10 New KTM ETS Train Sets in Q1 2025
The Ministry of Transport has procured 10 new KTM ETS train sets, set to be operational later in Q1 2025.
19-12-2024
KTMB Expands Open Mode Gates In Selected Stations
Keretapi Tanah Melayu Berhad (KTMB) is rolling out its Open Mode gate system at more stations.
15-10-2025
KTMB and SRT Trials MySawasdee Cross-Border Tourist Train
KTMB and SRT complete Padang Besar-Surat Thani rail trials, paving way for expanded MySawasdee service.
06-10-2025
KTMB Adds Extra ETS Trips For Deepavali Travel Rush
KTMB will operate additional ETS services between Padang Besar and KL Sentral from Oct 17 to 22.
06-10-2025
Latest News
RTS Link: First Train Arrives In Johor, Testing Kicks Off At Wadi Hana Depot
Train Set 02 has arrived at Wadi Hana Depot, marking the start of critical testing and commissioning.
17-11-2025
Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues
KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.
17-11-2025
Genting Toll: State Leaders Seek Resident-Friendly Approach
Pahang and Bentong representatives call for reasonable rates and safeguards as Genting prepares to introduce its toll fee.
17-11-2025
BYD Sees 2025 YTD Sales Total Reach 11,097 Units – 70% YoY Up From 2024
BYD Cars Malaysia discloses its 2025 YTD toral sales have reached 11,097 units, marking a 70% YoY increase from 2024.
14-11-2025
KLIA Aerotrain To Stop Nightly From Nov 15 For Reliability Upgrades
KLIA’s Aerotrain will be suspended nightly from 9PM to 7AM starting Nov 15 for reliability upgrades.
14-11-2025
Kelana Jaya LRT Weekend Disruptions For Upgrades
Rapid KL will upgrade the Kelana Jaya Line signalling system on Nov 15–16 and 29–30.
14-11-2025
GWM Malaysia Accelerates Localisation Drive To Strengthen Supply Chain
GWM Malaysia strengthens local partnerships and production to support the nation’s new-energy mobility ambitions.
14-11-2025
Upgraded Mitsubishi Eon Auto Mart 3S Centre Reopens in Melaka
Mitsubishi Motors Malaysia, together with Eon Auto Mart, announces the relocation and upgrade of its outlet in Melaka.
14-11-2025
Show More
trending_flat