Link Copiedcheck_circle
Auto News

Loke Reaffirms KLIA Aerotrain’s Safety After Tunnel Flooding, Door Incident

Anis

Share via

FW1485405_PTJ01_21062025_AEROTRAIN_KLIA-lpr-full_normal.jpg
Transport Minister Anthony Loke has reassured travellers that the new Aerotrain at KLIA Terminal 1 is running as expected and was built to meet global standards, Bernama has reported.

He said both the Transport Ministry and Malaysia Airports remain committed to maintaining a safe and seamless travel experience, with ongoing efforts to improve service and quickly resolve any issues.

“We’re still in the early stages of operation and making adjustments where needed. I truly appreciate the public’s patience as we fine-tune the system,” he said.

Screenshot-2025-07-04-180749-full_normal.jpg

On Saturday, the Aerotrain service was briefly halted at 11AM after a heavy downpour caused water to pool in the tunnel.
Malaysia Airports explained that while the tunnel’s drainage system includes pumps designed to manage excess water, one of the older units failed during the storm, triggering a safety shutdown.

Loke clarified that the interruption had nothing to do with the newly upgraded Aerotrain. The system, he said, did exactly what it was designed to do, which is to detect abnormal conditions and stop the train before it could become a risk.

503455903_18487717435068331_7898125353223993992_n-full_normal.jpg

The minister also addressed a separate incident on July 2, where a passenger held the platform doors open, prompting the train’s safety sensors to prevent them from shutting automatically.

“That wasn’t a fault, that was the system doing its job,” he said, noting that both situations highlight how the Aerotrain’s safety features are built to prioritise people over convenience. “These systems are smart enough to stop the moment something feels off  and that’s exactly what we want.”






Tagged:

KLIA
KLIA Aerotrain Halted
KLIA Aerotrain resume operation
KLIA Aerotrain breakdown
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News
KLIA Apologises After Aerotrain Breaks Down Again

KLIA Apologises After Aerotrain Breaks Down Again

KLIA’s Aerotrain stalled for 15 minutes due to a door glitch, prompting an apology and public frustration.

05-08-2025
Lifestyle
MAS Fleets BMW i7 As Luxury Terminal Transfer Limos

MAS Fleets BMW i7 As Luxury Terminal Transfer Limos

Malaysia’s flag-bearing airline MAS fleets BMW i7 for its luxury terminal transfer service at KLIA Terminal 1.

24-01-2024
Auto News
Add Flights, Reduce Fares For Festive Season - Dr Wee

Add Flights, Reduce Fares For Festive Season - Dr Wee

According to Datuk Seri Dr Wee Ka Siong, increasing flight frequencies during peak season is helpful in managing congestion and reducing air fares.

27-12-2022
Auto News
ERL To Resume KLIA Ekspres And KLIA Transit Again On Jan 3rd

ERL To Resume KLIA Ekspres And KLIA Transit Again On Jan 3rd

To accommodate the rising number of passenger riders, Express Rail Link Sdn Bhd (ERL) will resume its KL International Airport (KLIA) Ekspres and KLIA Transit services on January 3, 2023.

16-12-2022
Auto News
Undercover RTD Officers Arrest 19 Touts In KLIA

Undercover RTD Officers Arrest 19 Touts In KLIA

Road Transport Department (RTD) enforcement officers posing as tourists at Kuala Lumpur International Airport (KLIA) detained 19 touts who offered them illegal private vehicle services from the airport to Kuala Lumpur city centre.

14-12-2022
Auto News
Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues

Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues

KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.

17-11-2025
Auto News
KLIA Aerotrain To Stop Nightly From Nov 15 For Reliability Upgrades

KLIA Aerotrain To Stop Nightly From Nov 15 For Reliability Upgrades

KLIA’s Aerotrain will be suspended nightly from 9PM to 7AM starting Nov 15 for reliability upgrades.

14-11-2025
Auto News
KLIA Aerotrain Breaks Down Again; MOT, APAD Step In

KLIA Aerotrain Breaks Down Again; MOT, APAD Step In

KLIA’s Aerotrain is down again and the Transport Minister has told APAD to step in and probe MAHB’s handling of the issue.

28-10-2025

Latest News

Auto News
Leapmotor B10 Open For Bookings – Est. From RM110,000

Leapmotor B10 Open For Bookings – Est. From RM110,000

Early bookings now opened for upcoming new Leapmotor B10 EV C-SUV with estimate starting price of RM110,000.

17-11-2025
Auto News
MTSB Memorandum Set to Be Presented to Cabinet Soon – Loke

MTSB Memorandum Set to Be Presented to Cabinet Soon – Loke

The memorandum for the Malaysian Transport Safety Board will be presented to the Cabinet soon, says Transport Minister Anthony Loke.

17-11-2025
Auto News
Mitsubishi Destinator Earns 5 Stars ASEAN NCAP Rating

Mitsubishi Destinator Earns 5 Stars ASEAN NCAP Rating

Mitsubishi’s all-new Destinator secures 5-star ASEAN NCAP rating, reinforcing its readiness for the region.

Auto News
Malaysia Autoshow Expands With Penang And Johor Editions In 2026

Malaysia Autoshow Expands With Penang And Johor Editions In 2026

Malaysia Autoshow by MARii expands with Penang and Johor editions in 2026.

17-11-2025
Auto News
Three Laws To Be Updated For MLFF Toll System - Ahmad Maslan

Three Laws To Be Updated For MLFF Toll System - Ahmad Maslan

The government will revise key road laws before launching the Multi-Lane Free Flow (MLFF) system.

17-11-2025
Auto News
Gua Musang-Jeli Road To Reopen By Month-End After Sinkhole Repairs

Gua Musang-Jeli Road To Reopen By Month-End After Sinkhole Repairs

KM 11.95 of the Gua Musang-Jeli Road is being repaired after a sinkhole and landslide.

17-11-2025
Auto News
RTS Link: First Train Arrives In Johor, Testing Kicks Off At Wadi Hana Depot

RTS Link: First Train Arrives In Johor, Testing Kicks Off At Wadi Hana Depot

Train Set 02 has arrived at Wadi Hana Depot, marking the start of critical testing and commissioning.

17-11-2025
Auto News
Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues

Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues

KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.

17-11-2025