RTS Link Project Is Now 65% Complete
-full_normal.webp)
Malaysian Prime Minister Anwar Ibrahim and his Singaporean counterpart Lee Hsien Loong today jointly signed a plaque symbolising both nations' shared dedication to ensure the success of the RTS Link project.
The ceremony took place at the pivotal juncture of the marine viaduct project connecting Johor Bahru and Singapore. Said project has now reached a 65% completion as of Dec 31, 2023.
-full_normal.webp)
Also present at the signing ceremony was Transport Minister Anthony Loke, Singapore Acting Minister for Transport Chee Hong Tat, and Johor Menteri Besar Datuk Onn Hafiz Ghazi.
The 4 KM-long RTS Link project connects the commuter train network between stations at Bukit Chagar, Johor and Woodlands North, Singapore. The train network is designed to accommodate up to 10,000 passengers per hour in each direction with a travel duration of approximately 5 minutes.
-full_normal.webp)
The RTS Link project is expected to complete by Dec 2026, and it aims to provide a seamless and comfortable travel experience between Singapore and Johor Bahru.
On the bilateral relations side between Malaysia and Singapore, the RTS project and other ongoing discussions about the Johor-Singapore Special Economic Zone initiative are poised to usher in a more fruitful era.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQH8841
SELANGOR
BSL7407
JOHOR
JYP9025
PULAU PINANG
PRX7312
PERAK
APE3276
PAHANG
CFE8204
KEDAH
KGD8781
NEGERI SEMBILAN
NEJ3047
KOTA KINABALU
SJP7645
KUCHING
QAB452N
Last updated 19 Jan, 2026
Fuel Price
Petrol
RON 95
RM 2.52
-0.02
RON 97
RM 3.08
-0.03
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.84
-0.05
EURO 5 B7
RM 3.04
-0.05
Last updated 15 Jan, 2026
Related News
PMX: Perodua EV Launch Confirmed This Month, Set to Be “National Agenda”
PMX confirms Perodua’s first EV will launch by month-end, and will be elevated to a “national agenda”.
11-11-2025
Bateri Madani Launched - New Low-Cost MF Car Battery Option
Sejamas World rolled out Bateri Madani - a maintenance-free car battery range priced from RM130.
06-11-2025
PMX Takes a Ride in "The Beast’ During ASEAN Summit
The Cadillac One, returned to Malaysia for the 47th ASEAN Summit as President Trump broke protocol by inviting PM Anwar Ibrahim aboard.
26-10-2025
Budget 2026: Tax-Free Cars from Langkawi & Labuan Will Be Limited to RM300K
Tax-free cars from Langkawi and Labuan will only be limited to RM300,000 in value from Jan 1, 2026, onwards.
10-10-2025
Prime Minister Anwar Ibrahim Inaugurates Terminal Bersepadu Gombak
Prime Minister Datuk Seri Anwar Ibrahim inaugurated the launch of the Terminal Bersepadu Gombak earlier today.
29-09-2025
PMX: RM1.99 RON95 from 30 Sept, MyKad-Based Access; Non-Citizens RM2.60
RON95 drops to RM1.99 for Malaysians with MyKad-based verification from 30 Sept, RM2.60 for non-citizens, benefiting 16 million people.
22-09-2025
SSLR2 Highway Launched: RM7.6b Project Will Link Sarawak and Sabah
The 335km Sarawak–Sabah Link Road Phase 2 will connect key towns across northern Sarawak into Sabah.
12-09-2025
PMX: Proton’s International Success a Model for Malaysia
PM Datuk Seri Anwar Ibrahim says Proton’s success abroad in Egypt proves the brand is ready to expand into more markets.
04-09-2025
Latest News
Malaysia-made Jaecoo J7 Now Exported To Neighbouring Brunei
Chery sees both Malaysia-made Jaecoo J7 and J7 PHEV models now exported to neighbouring Brunei.
19-01-2026
Relocated BMW Lee Motors Outlet In Alor Setar Opens With Retail.NEXT Concept
Relocated BMW Lee Motors outlet in Alor Setar opens with refreshed Retail.NEXT brand identity.
19-01-2026
BMW Malaysia 2026 Price Update – ICE Models Up, EVs Unchanged
BMW Malaysia has updated the price list for its models in 2026, with most ICE models going up and EVs mostly unchanged.
19-01-2026
Rapid KL Denies Monopoly, Reassures Klang Valley Commuters
Rapid KL insists Klang Valley commuters still have plenty of bus options despite claims of monopoly.
19-01-2026
RM129 Million MIROS Complex Set for 2029 Completion
The MIROS complex is scheduled for completion in 2029, with the Zero Sick framework guiding execution.
19-01-2026
Proton X50 Makes Overseas Debut in Brunei - From RM86,500
Proton X50 makes its overseas debut in Brunei, marking a milestone in Proton’s export expansion.
16-01-2026
Johor Bahru Becomes First City To Launch Driverless Tourist Buses
Johor Bahru is set to become Malaysia’s first city to operate autonomous tourist buses, alongside AI CCTV and drones.
16-01-2026
Johor Bahru-Singapore RTS Nears Completion as Testing Begins
The JB-SG RTS Link is on track for completion by Dec, with train testing underway and passenger services expected to begin in Jan 2027.
15-01-2026
Show More
trending_flat
