Loke: Smart CCTVs, Platform Doors Planned for Safer LRT Stations
![]()
The Ministry of Transport recently announced plans to enhance safety measures at train stations following a tragic incident at Titiwangsa LRT station, where a disabled passenger lost their life after falling onto the train tracks.
He assured that the ministry is working closely with relevant parties, particularly Prasarana, to conduct a thorough investigation.
Loke has also instructed the public transport operator to review and improve safety measures at all train stations, with a particular focus on facilities for persons with disabilities (PwD).
-full_normal.jpg)
As part of preventive efforts, Prasarana will install smart CCTV systems capable of detecting risky behavior at stations. The company is also planning to install platform screen doors across all LRT lines in the long term to enhance passenger safety.
Loke urged passengers who require additional assistance, including PwDs, to seek help from Prasarana staff or Auxiliary Police stationed at train stations to ensure their needs are met.
He reaffirmed the government’s commitment to ensuring a safer, more inclusive, and user-friendly public transport system for all Malaysians.


Rapid Rail is also extending its full cooperation with authorities in the investigation and will step up monitoring efforts at stations.
Earlier today, Loke clarified that the service provider was not at fault.
He explained that all LRT stations have a Platform Intrusion Emergency Stop (PIES) system which automatically halt trains when an object falls onto the tracks, often causing service delays.
Loke further explained, "The incident at Titiwangsa LRT station happened as the victim fell onto the track at the exact moment the train arrived, and the PIES system did not have time to shut down."
Investigation on the incident is ongoing.
Source: MalayMail
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPY4627
SELANGOR
BSK173
JOHOR
JYK7418
PULAU PINANG
PRV5289
PERAK
APC3978
PAHANG
CFE856
KEDAH
KGC9101
NEGERI SEMBILAN
NEH5637
KOTA KINABALU
SJN5907
KUCHING
QAB4931M
Last updated 10 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.02
+0.07
EURO 5 B7
RM 3.22
+0.07
Last updated 06 Nov, 2025
Related News
Prasarana Implements Safety Measures Following Fatal LRT Incident
Prasarana enhances safety measures, including planned platform upgrades following fatal LRT incident.
01-04-2025
PRIDE, SPX Launch Smart Lockers at Five LRT Stations
PRIDE and SPX Express aim to add convenience for commuters with new automated lockers primed in five LRT stations.
30-09-2025
Rapid Rail Set To Launch Real-Time Crowd Tracking & AI Security
Rapid Rail will introduce a live tracker showing coach crowd levels so commuters can board with less stress.
23-09-2025
Shah Alam LRT Delayed Again, December Now In Sight
The Shah Alam LRT may miss its September deadline, with Prasarana now aiming for a December launch pending crucial safety tests.
26-08-2025
Kelana Jaya Line Signalling Works Delayed, Phase 2 Work Starts Sept 6
Kelana Jaya Line Phase 2 and 3 signalling works will now begin on Sept 6, with select stations opening later on affected dates.
07-08-2025
Ten LRT KJ Line Stations Set for Upgrade – Open From 9 AM on Weekends
Ten LRT stations on the Kelana Jaya line will be upgraded, and their operation times will be affected on weekends.
28-07-2025
Loke: No Political Appointments in Public Transport
Anthony Loke highlights Prasarana’s success as proof that expert leadership delivers results.
05-06-2025
Prasarana Aims For 40% Public Transit Ridership By 2030
Prasarana plans to boost public transport usage to 40% by 2030 through ongoing service and facility improvements.
19-05-2025
Latest News
PLUS To Close Two Bangi Ramps Nightly Until Nov 28
PLUS will close two ramps near Bangi nightly from 10PM to 5AM starting today until Nov 28.
10-11-2025
KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance
KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.
10-11-2025
4.4 Mil Old Vehicles Threaten Road Safety, Incentive Alone Insufficient
JPJ data shows over 4.4 million old vehicles are still on the road making up about 17% of the country’s 25.7m active vehicles.
10-11-2025
Proton Shifts 15,575 Units In Oct 2025, Outgoing Saga Still Leads
Proton closes Oct 2025 by shifting 15,575 units, outgoing Saga sales spikes to 12-year high ahead of successor’s debut.
10-11-2025
JPJ Warns Public Against Fake “Free Driving Licence” TikTok Scams
JPJ has warned the public about fake TikTok posts claiming people can get free driving licences without any tests.
10-11-2025
RM3b Juru–Sungai Dua Link Cuts Travel Time To Just 20 Minutes
RM3 billion traffic dispersal project aims to slash travel time between Juru and Sungai Dua from an hour to just 20 minutes.
10-11-2025
Nanta: Barrier-Free ANPR Toll System Still at RFP Stage
The Works Ministry is inviting proposals for an ANPR-based barrier-free MLFF toll system.
10-11-2025
New Leapmotor 3S Showroom Opens In Ipoh, Perak
Perak state capital of Ipoh gains new Leapmotor brand 3S showroom and service outlet operated by dealers CST Auto.
07-11-2025
Show More
trending_flat