Govt's "Road To Rail" Project Aims To Lower Lorry-Related Crashes

Transport Minister Anthony Loke has unveiled a "Road to Rail" initiative, prioritizing railway transport over trucks for container goods.
The East Coast Rail Link (ECRL) project is central to this transformation. With the ECRL's projected completion in approximately two years, rail will become the primary means of transporting goods and containers to the east coast, according to Loke.
"The initiative is hoped to improve road safety as discourse emerged on accidents involving heavy vehicles and efforts to prevent collisions, " he says in a MalaysiaKini report.
-full_normal.jpg)
Recent years have seen a distressing increase in fatal accidents involving large vehicles, a trend that persists despite government efforts to curb such incidents.
On May 13, a devastating crash in Teluk Intan, Perak, resulted in nine fatalities. A Federal Reserve Unit (FRU) truck carrying 18 personnel from Unit 5 Sungai Senam collided with a rock-laden lorry, with eight deaths occurring at the scene and one more at Teluk Intan Hospital.
Further compounding the issue, a complex five-vehicle pile-up on the North-South Motorway (Plus) on December 23 led to seven deaths and thirty-three injuries. This incident involved two lorries, a car, an MPV, and a tour bus transporting 27 passengers.
Regarding people’s mobility, Loke emphasized the government's priority on resolving first-mile and last-mile connectivity issues, boosting public transport usage, alleviating congestion, and expediting commutes.
-full_normal.jpg)
The minister, nevertheless clarified that a drone mobility strategy is not currently a pressing matter, given the technology's early stage and projected 10-15 year development timeframe.
“There were many challenges to drone mobility that needed to be determined first, such as a legal framework as well as technological and operational issues,” he was quoted as saying.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPY5456
SELANGOR
BSK697
JOHOR
JYK7945
PULAU PINANG
PRV5504
PERAK
APC4203
PAHANG
CFE1146
KEDAH
KGC9254
NEGERI SEMBILAN
NEH5704
KOTA KINABALU
SJN6031
KUCHING
QAB4950M
Last updated 11 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.02
+0.07
EURO 5 B7
RM 3.22
+0.07
Last updated 06 Nov, 2025
Related News
Loke Urges Malaysians To Clear 5.5 Million Unpaid JPJ Summonses By Year-End
Transport Minister Anthony Loke says over 5.5 million JPJ summonses remain unpaid, urges motorists to settle them before year-end too.
07-11-2025
BAS.MY Pass Now At RM30 Monthly for Unlimited Bus Rides
BAS.MY services now cost just RM1 a day as the government reduces the 30-day Unlimited Travel Pass from RM50 to RM30.
04-11-2025
MOT Eyes Rail Expansion, Road Safety and Airport Improvements
Transport Minister YB Loke Siew Fook outlines major transport projects and safety reforms under the 2026 Budget.
30-10-2025
JPJ Issued Over 4,000 Notices for Heavy Vehicle Speed Limiter Compliance
JPJ has issued over 4,000 notices to ensure heavy vehicles install speed limiter devices for safer roads.
23-10-2025
JPJ: Zero Tolerance Towards Overloading Includes Body Cam & Firearms Adoption
JPJ deploys body cam and small arms (pistols) as part of a nationwide crackdown on overloaded commercial vehicles.
14-10-2025
Govt Still Weighing Options For KL–Singapore HSR Project - Loke
Malaysia is still reviewing options for the KL–Singapore HSR, with a final model yet to be determined.
08-10-2025
Over 7,000 Commercial Vehicle Safety Audits Completed - Loke
Loke told Parliament that JPJ has audited more than 7,000 commercial vehicle operators, with a new digital system set by 2027.
07-10-2025
New RM22.7M JPJ Kajang Office Set for 2027
The new RM22.7M JPJ Kajang office will feature modern facilities and improved services for the public by 2027.
23-09-2025
Latest News
PLUS To Close Two Bangi Ramps Nightly Until Nov 28
PLUS will close two ramps near Bangi nightly from 10PM to 5AM starting today until Nov 28.
10-11-2025
KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance
KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.
10-11-2025
4.4 Mil Old Vehicles Threaten Road Safety, Incentive Alone Insufficient
JPJ data shows over 4.4 million old vehicles are still on the road making up about 17% of the country’s 25.7m active vehicles.
10-11-2025
Proton Shifts 15,575 Units In Oct 2025, Outgoing Saga Still Leads
Proton closes Oct 2025 by shifting 15,575 units, outgoing Saga sales spikes to 12-year high ahead of successor’s debut.
10-11-2025
JPJ Warns Public Against Fake “Free Driving Licence” TikTok Scams
JPJ has warned the public about fake TikTok posts claiming people can get free driving licences without any tests.
10-11-2025
RM3b Juru–Sungai Dua Link Cuts Travel Time To Just 20 Minutes
RM3 billion traffic dispersal project aims to slash travel time between Juru and Sungai Dua from an hour to just 20 minutes.
10-11-2025
Nanta: Barrier-Free ANPR Toll System Still at RFP Stage
The Works Ministry is inviting proposals for an ANPR-based barrier-free MLFF toll system.
10-11-2025
New Leapmotor 3S Showroom Opens In Ipoh, Perak
Perak state capital of Ipoh gains new Leapmotor brand 3S showroom and service outlet operated by dealers CST Auto.
07-11-2025
Show More
trending_flat

