MOT Reviewing Platform Screen Doors For LRT Following Blind Passenger’s Death
The Transport Ministry (MOT) is reviewing whether to install Platform Automatic Gate Systems (PAGS) at LRT stations on the Kelana Jaya and Ampang lines, following a tragic incident earlier this year involving a blind commuter.
Deputy Transport Minister Datuk Hasbi Habibollah said the move comes after a visually impaired passenger fell onto the tracks at Titiwangsa station on February 22 and was fatally struck by a train.

"To ensure such incidents involving PwD passengers at Titiwangsa LRT station do not recur, Prasarana is conducting a feasibility study on implementing the Platform Automatic Gate System at Kelana Jaya Line and Ampang Line LRT stations," Hasbi told the Dewan Negara on Tuesday.
He was responding to Senator Tuan D.J. Isaiah, who had asked about MOT’s efforts to improve safety for persons with disabilities (PwDs).


-full.jpg)
Hasbi noted that while the study is ongoing, several immediate measures will be rolled out.
"These include deploying more auxiliary police at stations, upgrading disabled-friendly facilities such as replacing ageing lifts, and improving signage and access routes to make navigation easier for PwD passengers," he added.

The gates, which are already in place at KL Sentral and Tun Sambanthan, are designed to open and close in sync with train doors. They also come equipped with three emergency exit doors and fixed safety screens at both ends of the platform.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VRQ957
SELANGOR
BST6846
JOHOR
JE2467J
PULAU PINANG
PSF5411
PERAK
APL4619
PAHANG
CFH7302
KEDAH
KGJ1094
NEGERI SEMBILAN
NEL8362
KOTA KINABALU
SJU1209
KUCHING
QAB5610P
Last updated 16 Sep, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
Use The Kelana Jaya LRT? Here's Why Some Stations Won't Open Until 9.30AM
Kelana Jaya LRT track replacement works run from Sept 2026 to Sept 2027. Check the affected stations, Sunday dates and 9.30AM opening times.
10-09-2026
Kelana Jaya LRT trains “out of service” but line running normally - RapidRail
Rapid Rail clarified that temporary train withdrawals on the Kelana Jaya LRT line are part of standard safety procedures.
27-02-2026
Loke Directs Prasarana To Meet On Klang Valley Train Disruptions
Prasarana has been directed by Loke to hold a special meeting to find the source of the technical issues affecting the MRT and LRT lines.
29-03-2023
Seven Day Free Travel, Kelana Jaya LRT Line - My50, Touch 'N Go and Token Users
As announced previously, free fares will be provided for every day of service disruption to Kelana Jaya Line LRT users. Even though the Kelana Jaya LRT line was only suspended for five (5) days, users will still be given free travel for seven (7) days.
14-11-2022
Automatic Train Control System Faulty, Kelana Jaya LRT’s Service Disruption
A fault in the Automatic Train Control (ATC) system has caused a disruption for the entire Kelana Jaya line LRT service schedule.
08-11-2022
JPJ Lifts Travel Proof Rule for Physical Driving Licence
JPJ lifts the travel proof rule, allowing motorists to apply for a physical licence without overseas travel justification.
23-01-2026
RM100m Shortfall Hits My50 Pass, Govt Pledges Continuation
Despite a RM100 million funding gap, the govt has reaffirmed its commitment to keeping the My50 public transport pass in place.
08-01-2026
UMWT Hands Over xEV Fleet to MOT
UMW Toyota Motor (UMWT) delivers xEV fleet to MOT, effort reinforces its role in innovating and shaping sustainable mobility policy.
01-05-2025
Latest News
Puspakom Has More Rivals Now. So Why Aren't Car Inspections Getting Cheaper?
Puspakom now has rivals for M.V.15 ownership transfer inspections, but fees won't get cheaper. Here's why JPJ is keeping rates standardised.
15-09-2026
If You're In Penang And Eyeing A Suzuki, There's A New Showroom To Check Out
Suzuki has opened a new RM1 million dealership in Juru, Penang, expanding its Malaysian network to 14 sales outlets and 13 service centres.
14-09-2026
Malaysia Has More Car Brands Than Ever. So Why Do We Still Choose Proton And Perodua?
Proton and Perodua account for nearly 63% of Malaysia's new car registrations in 2026. Here's why national brands still dominate despite growing competition.
14-09-2026
40,595 Summonses, RM12.18 Million Unpaid. JPJ's Patience Is Running Out
JPJ has given 945 transport companies 14 days to settle 40,595 outstanding summonses worth RM12.18 million or face tougher enforcement.
11-09-2026
Use The Kelana Jaya LRT? Here's Why Some Stations Won't Open Until 9.30AM
Kelana Jaya LRT track replacement works run from Sept 2026 to Sept 2027. Check the affected stations, Sunday dates and 9.30AM opening times.
10-09-2026
Your Car's Windscreen Isn't Just Glass, And This Crash Test Shows Why
Malaysia's first live windscreen crash test at MIROS shows why proper installation, adhesive and curing time matter for vehicle safety.
10-09-2026
Would You Trust Malaysia's MLFF System To Charge The Right Car, Every Time?
Malaysia's MLFF is moving forward, but how will barrier-free tolls identify and charge the right car? Here's how RFID, ANPR and the system could work.
09-09-2026
Is "Adjusting" Used-Car Mileage Really Normal In Malaysia?
A Bro Wong-SCRUT dispute has put used-car mileage adjustment back in focus. How common is odometer tampering in Malaysia, and are buyers protected?
09-09-2026
Show More
trending_flat
