ENZHMS
Link Copiedcheck_circle
Auto News

Prime Minister Anwar Ibrahim Inaugurates Terminal Bersepadu Gombak

Mukhlis Azman

Share via

Terminal-Bersepadu-Gombak-PMX-Launch-(2).jpgTerminal-Bersepadu-Gombak-TBG-4.jpg

Prime Minister Datuk Seri Anwar Ibrahim inaugurated the launch of the Terminal Bersepadu Gombak earlier today.

Months since its first operation started, the Terminal Bersepadu Gombak (TBG) integrated transport terminal station has now been officially inaugurated by Prime Minister Datuk Seri Anwar Ibrahim earlier today.

More than a decade after its construction began, this RM307.4 million complex now becomes the main land transportation hub that connects express bus services to transit services like the Kelana Jaya LRT line and the East Coast Rail Link (ECRL) high-speed train too in the future. With its strategic location in Gombak, which is in the northeast end of the Klang Valley, TBG is also serving as the main gateway for the East Coast Peninsula Malaysia region to the national capital.

Terminal-Bersepadu-Gombak-TBG-5.jpg

Since it became operational on March 5 this year, TBG now houses more than 30 express bus carriers, with an average of 3,000 trips per month. The terminal can accommodate up to 700 bus trips per day, which involves around 25,000 passengers to various destinations across the nation.

While the TBG started as an initiative by the Ministry of Transport (MoT), the terminal now operates using the Build-Lease-Maintain-Operate-Transfer (BLMOT) model, with concessionaire TEGAS now handling the daily operations for the first 25 years before being given back to the government.

Terminal-Bersepadu-Gombak-TBG-2.jpgTerminal-Bersepadu-Gombak-TBG-3.jpg

Some key amenities primed here include a Central Ticketing System (CTS), a live-operated Terminal Operation System (TOS), plus a transit-oriented design that combines transportation, retail, residential, and even government facilities under one roof.

Terminal-Bersepadu-Gombak-PMX-Launch-(7).jpgTransport Minister YB Anthony Loke

“This terminal serves as more than just a place for people to get on and off the bus; it is also an international-level facility that symbolises the new face of Malaysia’s public transport system. With modern facilities and amenities like a centralised ticketing system, TBG is proof of the government’s determination to provide a more inclusive and people-friendly public transportation system, in line with the Malaysia Madani agenda,” said Transport Minister Anthony Loke.

“We hope that the terminal will not only function as a modern transportation hub but also showcase a sustainable development model that can improve the people’s well-being, reduce dependency on personal vehicles, and contribute to reducing the country’s carbon emissions,” the minister added.

Terminal-Bersepadu-Gombak-PMX-Launch-(5).jpg


Gallery

Share This Article

Written By

Mukhlis Azman

An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman

Share via

JPJ Running Numbers

KUALA LUMPUR

VPT6512

SELANGOR

BSJ1416

JOHOR

JYH3848

PULAU PINANG

PRU3892

PERAK

APB4514

PAHANG

CFD5897

KEDAH

KGC4252

NEGERI SEMBILAN

NEH2369

KOTA KINABALU

SJM8254

KUCHING

QAB2518M

Last updated 29 Sep, 2025

Fuel Price

Petrol

RON 95

RM 2.05

RON 97

RM 3.21

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.93

EURO 5 B7

RM 3.13

Last updated 25 Sep, 2025

Related News

Auto News

PMX: RM1.99 RON95 from 30 Sept, MyKad-Based Access; Non-Citizens RM2.60

RON95 drops to RM1.99 for Malaysians with MyKad-based verification from 30 Sept, RM2.60 for non-citizens, benefiting 16 million people.

Auto News

SSLR2 Highway Launched: RM7.6b Project Will Link Sarawak and Sabah

The 335km Sarawak–Sabah Link Road Phase 2 will connect key towns across northern Sarawak into Sabah.

Auto News

PMX: Proton’s International Success a Model for Malaysia

PM Datuk Seri Anwar Ibrahim says Proton’s success abroad in Egypt proves the brand is ready to expand into more markets.

Auto News

Delayed EKVE Phase One Finally Opened With 30-Day Toll-Free Span

Phase one of EKVE finally opens six years behind schedule, concessionaires offer 30-day toll-free run.

Auto News

Anwar: Luxury Assets Will Be Factored In For RON95 Subsidy

PM Anwar says ownership of luxury good, properties and vehicles will be considered alongside income in determining who qualifies for RON95 subsidy.

Auto News

MoF: Fuel Subsidy Rollout Under Testing, Launches End-Sept

MoF is finalising the targeted fuel subsidy system, with full rollout details expected by end-Sept.

Auto News

PR Spouses Sidelined From RON95 Fuel Subsidy

PR spouses raising Malaysian children will reportedly soon be paying more for RON95.

Auto News

PM: M40 Will Benefit From Cheaper Fuel, Frozen Toll Rates

PM Datuk lo Seri Anwar Ibrahim reassured that fuel and toll savings are now reaching the M40 group.

Latest News

Auto News

Loke: Child Seat Could Have Saved Baby in Bukit Kajang Tragedy

A child seat could have saved the toddler’s life in Bukit Kajang Toll Plaza crash, says Transport Minister Loke.

Auto News

Prime Minister Anwar Ibrahim Inaugurates Terminal Bersepadu Gombak

Prime Minister Datuk Seri Anwar Ibrahim inaugurated the launch of the Terminal Bersepadu Gombak earlier today.

29-09-2025
Auto News

No More Warnings For Traffic Offenders From Oct 1

Police will shift from warnings to full enforcement against traffic offenders beginning Oct 1

29-09-2025
Auto News

DBKL To Rope In Scrap Dealers To Tackle Abandoned Car Surge

Overcrowded depots and mounting complaints push DBKL to consider outsourcing abandoned vehicle disposal.

29-09-2025
Auto News

Penang Traffic Woes Persist Despite PTMP - Penang Gerakan

Penang Gerakan urges an independent review of the PTMP, saying poor planning has worsened traffic instead of easing it.

29-09-2025
Auto News

Hauliers Warn WCE Delays Hurting Logistics and Economy

The Association of Malaysian Hauliers says delays in completing Section 3 of the WCE are disrupting cargo flow and driving up costs.

29-09-2025
Auto News

Tawau Airport Upgrade Will Be Closely Monitored, Set For 2028 Completion - Loke

Tawau Airport’s RM120.9m upgrade aims to boost capacity, improve facilities, and enhance connectivity by 2028.

29-09-2025
Auto News

Budi95: Complaints Emerge Over Eligibility, MOF Assures Fix

A small number of Malaysians with valid MyKad and licences reported problems accessing the new fuel subsidy.

Show More

trending_flat
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.