ENZHMS
Link Copiedcheck_circle
Auto News

LRT 3: NKVE Intermittent Lane Closure, KM14.9 To KM16.2 From 26 Aug - 28 Aug

Kumeran Sagathevan

Share via

LRT-3-Road-Closure-NKVE-Caricarz-(1).jpg

Setia Utama LRT 3 Sdn Bhd, the contractor overseeing the Light Rail Transit 3 (LRT3) project, would like to notify the public about upcoming intermittent lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) between KM14.9 and KM16.2 (for both Kuala Lumpur/Sungai Buloh and Shah Alam/Subang-bound lanes).

These closures are necessary to facilitate LRT3 project-related work and will take place from August 26, 2023, to August 28, 2023 (Saturday to Monday) between 11:00 p.m. and 5:00 a.m.

LRT-3-Road-Closure-NKVE-Caricarz-(4).jpg

During these closures, the following traffic diversions will be in effect:

  1. Motorists travelling from Shah Alam/Subang to Kuala Lumpur/Sungai Buloh will be directed to use the opposite side of the NKVE Highway, with contra-flow traffic arrangements in place. Three (3) lanes will be open for motorists heading from Kuala Lumpur/Sungai Buloh to Shah Alam/Subang.
  2. Motorists travelling from Shah Alam/Subang to Petronas and Shell will be guided to the rightmost lane near Vista Subang Apartment.
  3. Motorists travelling from Petronas to the NKVE Highway will be rerouted to the leftmost lane, then proceed straight onto the NKVE Highway (towards Kuala Lumpur/Sungai Buloh).
  4. Motorists travelling on the rightmost lane from Kuala Lumpur/Sungai Buloh will be directed to the middle lane of the NKVE Highway when approaching the flagman overseeing the contra-flow, as illustrated in the provided map.

LRT-3-Road-Closure-NKVE-Caricarz-(3).jpg

Please note that these diversions have been given the green light by the Malaysian Highway Authority (LLM) and Projek Lebuhraya Usahasama Berhad (PLUS). Road users are advised to drive carefully when using these stretches and adhere to all signs. 


Gallery

Share This Article

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

JPJ Running Numbers

KUALA LUMPUR

VPQ2970

SELANGOR

BSH3982

JOHOR

JYF6973

PULAU PINANG

PRT5370

PERAK

APA5839

PAHANG

CFD3176

KEDAH

KGB9731

NEGERI SEMBILAN

NEG8373

KOTA KINABALU

SJM3049

KUCHING

QAB263M

Last updated 27 Aug, 2025

Fuel Price

Petrol

RON 95

RM 2.05

RON 97

RM 3.13

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.85

-0.05

EURO 5 B7

RM 3.05

-0.05

Last updated 21 Aug, 2025

Related News

Auto News
LRT3 Hits 99% Completion - Loke

LRT3 Hits 99% Completion - Loke

LRT3, which will connect Bandar Utama to Johan Setia, is 99% complete and on track for launch, says Transport Minister.

30-07-2025
Auto News
LRT 3 Will Cost RM9.7 Billion Less Despite 5 Key Station Reinstatement

LRT 3 Will Cost RM9.7 Billion Less Despite 5 Key Station Reinstatement

LRT 3 will cost RM9.72 Billion less even with the reinstatement of five key stations compared to initial 2015 cost quoted.

Auto News
Federal Highway Lane Closure For LRT 3 Project Construction Works

Federal Highway Lane Closure For LRT 3 Project Construction Works

Federal Highway sees lane closures to facilitate the LRT 3 project works from July 26 to July 28.

Auto News
Five LRT3 Stations Set To Be Operational In 2027

Five LRT3 Stations Set To Be Operational In 2027

Five Light Rail Transit Line 3 (LRT3) stations that were previously cancelled should be operational by 2027, says Loke.

11-01-2024
Auto News
LRT3 Will Begin Operations On Sept 30 - Loke

LRT3 Will Begin Operations On Sept 30 - Loke

LRT3 will begin operating on September 30 this year, Transport Minister Anthony Loke announced.

27-02-2025
Auto News
Loke: LRT3 Set To Begin Operations In Q3 2025 - 95.6% Complete

Loke: LRT3 Set To Begin Operations In Q3 2025 - 95.6% Complete

The LRT3 project is currently 95.6% complete and is scheduled to start ferrying passengers by Q3 2025.

Auto News
LRT3: Intermittent Road Closure On PLUS & SPRINT from July 2 to Sept 30

LRT3: Intermittent Road Closure On PLUS & SPRINT from July 2 to Sept 30

A series of intermittent road closures will take place on PLUS and SPRINT highways from July 2 to Sept 30 for LRT3 construction works.

Auto News
LRT 3: Subang Airport Road, Lane Closure & Road Diversion - 16 Sept To 31 Dec 2023

LRT 3: Subang Airport Road, Lane Closure & Road Diversion - 16 Sept To 31 Dec 2023

Lane closures and traffic diversions on Subang Airport Road in both the Subang and Kuala Lumpur directions will be extended for the LRT3 works

Latest News

Auto News
New Law In February To Ease RTS Link Border Checks - Home Minister

New Law In February To Ease RTS Link Border Checks - Home Minister

Malaysia will table a Bill next February to enable co-located border checks for the Johor Bahru–Singapore RTS Link.

27-08-2025
Auto News
iCaur Malaysia Opens World’s First iCaur Dealership in Glenmarie

iCaur Malaysia Opens World’s First iCaur Dealership in Glenmarie

The newly opened iCaur Glenmarie by Absolute Motor is the brand’s first-ever dealership in the world.

27-08-2025
Auto News
West Coast Expressway On Track For 2027 Completion

West Coast Expressway On Track For 2027 Completion

The West Coast Expressway is on track for full completion by 2027, with eight of its 11 sections already open.

27-08-2025
Auto News
Jetour Malaysia Charts Over 2,000 Bookings, Expands Network to 20 Dealerships

Jetour Malaysia Charts Over 2,000 Bookings, Expands Network to 20 Dealerships

Jetour Malaysia has expanded its dealer network to 20 locations, while racking up over 2,000 bookings for their SUVs.

26-08-2025
Auto News
RON95 Subsidy Sees Quota System With Higher Allowance for P-Hailing, E-Hailing

RON95 Subsidy Sees Quota System With Higher Allowance for P-Hailing, E-Hailing

The government will introduce new quota-based RON95 subsidy with higher fuel allowances for p-hailing and e-hailing drivers.

Auto News
ETS 3 Final Phase to Johor Bahru Set for December Launch – MoT

ETS 3 Final Phase to Johor Bahru Set for December Launch – MoT

Transport Minister Anthony Loke said the final phase of the ETS 3 project to Johor Bahru will be launched this December.

26-08-2025
Auto News
Shah Alam LRT Delayed Again, December Now In Sight

Shah Alam LRT Delayed Again, December Now In Sight

The Shah Alam LRT may miss its September deadline, with Prasarana now aiming for a December launch pending crucial safety tests.

26-08-2025
Auto News
Malaysia’s Transport Push: RTS, Digital Upgrades and Rail Milestones

Malaysia’s Transport Push: RTS, Digital Upgrades and Rail Milestones

Transport Minister says Malaysia’s transport is hitting new milestones, bringing real changes for travellers.

26-08-2025

Show More

trending_flat
Carz Automedia Malaysia Logo
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.